Economic performance evaluation of flexible centralised and decentralised blue hydrogen production systems design under uncertainty

被引:1
|
作者
Bigestans, Davis [1 ]
Cardin, Michel-Alexandre [2 ]
Kazantzis, Nikolaos [3 ]
机构
[1] Imperial Coll London, Dept Mech Engn, London, England
[2] Imperial Coll London, Dyson Sch Design Engn, London, England
[3] Worcester Polytech Inst, Dept Chem Engn, Worcester, MA USA
关键词
Flexible engineering system design; Blue hydrogen; Centralised and decentralised production; Real options analysis; Uncertainty; Monte Carlo simulations; MEMBRANE TECHNOLOGY; PRODUCTION PLANTS; FLEXIBILITY; OPTIONS;
D O I
10.1016/j.apenergy.2023.121944
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Blue hydrogen is viewed as an important energy vector in a decarbonised global economy, but its large-scale and capital-intensive production displays economic performance vulnerabities in the face of increased market and regulatory uncertainty. This study analyses flexible (modular) blue hydrogen production plant designs and evaluates their effectiveness to enhance economic performance under uncertainty. The novelty of this work lies in the development of a comprehensive techno-economic evaluation framework that considers flexible centralised and decentralised blue hydrogen plant design alternatives in the presence of irreducible uncertainty, whilst explicitly considering the time value of money, economies of scale and learning effects. A case study of centralised and decentralised blue hydrogen production for the transport sector in the San Francisco area is developed to highlight the underlying value of flexibility. The proposed methodological framework considers various blue hydrogen plant designs (fixed, phased, and flexible) and compares them using relevant economic indicators (net present value (NPV), capex, value-at-risk/gain, etc.) through a detailed Monte Carlo simulation framework. Results indicate that flexible centralised hydrogen production yields greater economic value than alternative designs, despite the associated cost-premium of modularity. It is also shown that the value of flexibility increases under greater uncertainty, higher learning rates and weaker economies of scale. Moreover, sensitivity analysis reveals that flexible design remains the preferred investment option over a wide range of market and regulatory conditions except for high initial hydrogen demand. Finally, this study demonstrates that major regulatory and market uncertainties surrounding blue hydrogen production can be effectively managed through the application of flexible engineering system design that protects the investment from major downside risks whilst allowing access to favourable upside opportunities.
引用
收藏
页数:20
相关论文
共 50 条
  • [1] Centralised, decentralised or hybrid sanitation systems? Economic evaluation under urban development uncertainty and phased expansion
    Roefs, Ivar
    Meulman, Brendo
    Vreeburg, Jan H. G.
    Spiller, Marc
    [J]. WATER RESEARCH, 2017, 109 : 274 - 286
  • [2] Flexible design of renewable hydrogen production systems through identifying bottlenecks under uncertainty
    Wang, Jing
    Ye, Kai
    Kang, Lixia
    Liu, Yongzhong
    [J]. ENERGY, 2024, 311
  • [3] Production planning with flexible manufacturing systems under demand uncertainty
    Elyasi, Milad
    Altan, Basak
    Ekici, Ali
    Ozener, Okan Orsan
    Yanikoglu, Ihsan
    Dolgui, Alexandre
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2024, 62 (1-2) : 157 - 170
  • [4] Performance Evaluation of Smart Systems under Uncertainty
    Nannapaneni, Saideep
    Dubey, Abhishek
    Mahadevan, Sankaran
    [J]. 2017 IEEE SMARTWORLD, UBIQUITOUS INTELLIGENCE & COMPUTING, ADVANCED & TRUSTED COMPUTED, SCALABLE COMPUTING & COMMUNICATIONS, CLOUD & BIG DATA COMPUTING, INTERNET OF PEOPLE AND SMART CITY INNOVATION (SMARTWORLD/SCALCOM/UIC/ATC/CBDCOM/IOP/SCI), 2017,
  • [5] Economic performance evaluation of process system design flexibility options under uncertainty: The case of hydrogen production plants with integrated membrane technology and CO2 capture
    Ma, Liang-Chih
    Castro-Dominguez, Bernardo
    Kazantzis, Nikolaos K.
    Ma, Yi Hua
    [J]. COMPUTERS & CHEMICAL ENGINEERING, 2017, 99 : 214 - 229
  • [6] Economic and Flexible Design under Uncertainty for Steam Power Systems Based on Interval Two-Stage Stochastic Programming
    Niu, Teng
    Yin, Hongchao
    Feng, Enmin
    [J]. INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 2021, 60 (10) : 4019 - 4029
  • [7] Organizational and Economic Systems under Uncertainty and Certainty: Entropy and Negentropy Evaluation
    Kuzmin, Yevgeny A.
    [J]. UPRAVLENETS-THE MANAGER, 2012, (11-12): : 44 - 54
  • [8] Flexible Booster Chlorination: Design and Operation for Water Distribution Systems under Uncertainty
    Basupi, Innocent
    Nono, Denis
    [J]. ASCE-ASME JOURNAL OF RISK AND UNCERTAINTY IN ENGINEERING SYSTEMS PART A-CIVIL ENGINEERING, 2019, 5 (04)
  • [9] Evaluation of economic feasibility under uncertainty of a thermochemical route for ethanol production in Brazil
    Taylor-de-Lima, Reynaldo L. N.
    Gerbasi da Silva, Arthur Jose
    Legey, Luiz F. L.
    Szklo, Alexandre
    [J]. ENERGY, 2018, 150 : 363 - 376
  • [10] Energetic and Economic Performance Evaluation of Production Systems: Perspective Analysis
    Alaouchiche, Y.
    Ouazene, Y.
    Yalaoui, F.
    [J]. IFAC PAPERSONLINE, 2020, 53 (02): : 11150 - 11155