Cost-Benefit Assessment of Offshore Structures Considering Structural Deterioration

被引:3
|
作者
Varela, Gerardo [1 ]
Tolentino, Dante [1 ]
机构
[1] Univ Autonoma Metropolitana, Dept Mat, 420 San Pablo Ave, Mexico City 02128, Mexico
关键词
optimal time instant; offshore structures; demand exceedance rate; maintenance; cost-benefit analysis; LIFE-CYCLE COST; OPTIMUM DESIGN; INSPECTION; MAINTENANCE; OPTIMIZATION;
D O I
10.3390/jmse11071348
中图分类号
U6 [水路运输]; P75 [海洋工程];
学科分类号
0814 ; 081505 ; 0824 ; 082401 ;
摘要
Offshore facilities are essential infrastructure systems for many nations because their partial or total interruption causes diverse consequences in the economic, political, environmental, and social sectors. With the aim to preserve such structures at acceptable reliability levels, an approach is proposed to calculate the optimal instant of time in which inspection and maintenance works can be performed. The optimal time instant is estimated following the cost benefit criterion (CB) considering the cost of inspection, repair and failure. The inspection cost is given by an inspection quality, while fatigue crack size at different critical joints is calculated to estimate repair costs. In this paper, the concept of demand exceedance rates is introduced to evaluate the failure cost. Uncertainties related to both storm and operational waves are considered. The optimal time instant is associated with the lowest cost of inspection, repair and failure. For this purpose, the approach is exemplified in an offshore jacket structure situated in the Gulf of Mexico. The optimal instant of time corresponds to 6 years after the offshore jacket installation. If maintenance actions are implemented every six years during the lifespan of the system, an economic reduction of 58% is achieved, compared to the case in which no inspection and maintenance works are performed over time. The approach helps decision-makers ensure the best use of economic resources.
引用
收藏
页数:18
相关论文
共 50 条
  • [1] COST-BENEFIT ANALYSIS FOR OFFSHORE STRUCTURES UNDER STRUCTURAL DETERIORATION
    Varela, Gerardo
    Flores, Ricardo B.
    Tolentino, Dante
    PROCEEDINGS OF ASME 2024 43RD INTERNATIONAL CONFERENCE ON OCEAN, OFFSHORE AND ARCTIC ENGINEERING, OMAE2024, VOL 2, 2024,
  • [2] Guidelines and Cost-Benefit Analysis of the Structural Health Monitoring Implementation in Offshore Wind Turbine Support Structures
    Martinez-Luengo, Maria
    Shafiee, Mahmood
    ENERGIES, 2019, 12 (06)
  • [3] Cost-Benefit Assessment of Inspection and Repair Planning for Ship Structures Considering Corrosion Model Uncertainty
    李典庆
    唐文勇
    张圣坤
    China Ocean Engineering, 2005, (03) : 409 - 420
  • [4] Cost-benefit assessment of inspection and repair planning for ship structures considering corrosion model uncertainty
    Li, DQ
    Tang, WY
    Zhang, SK
    CHINA OCEAN ENGINEERING, 2005, 19 (03) : 409 - 420
  • [5] COST-BENEFIT ANALYSIS APPROACH FOR STRUCTURAL REINFORCEMENT OF "PILOTIS" BUILDING STRUCTURES
    da Silva, Manuel Tavares
    Falcao Silva, Maria Joao
    Cabaco, Antnio
    PROCEEDINGS OF THE 7TH INTERNATIONAL CONFERENCE ON MECHANICS AND MATERIALS IN DESIGN (M2D2017), 2017, : 1287 - +
  • [6] Cost-benefit AHPSort for performance analysis of offshore providers
    Ishizaka, Alessio
    Lopez, Cristina
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2019, 57 (13) : 4261 - 4277
  • [7] Comprehensive Cost-Benefit Assessment of Offshore Wind Power Based on Improved VIKOR Method
    Tian, Shuxin
    Zhou, Yu
    Fu, Yang
    Ji, Liang
    Li, Zhenkun
    2023 IEEE/IAS INDUSTRIAL AND COMMERCIAL POWER SYSTEM ASIA, I&CPS ASIA, 2023, : 1268 - 1273
  • [8] Cost-benefit assessment of BLGCC technology
    Larson, Eric D.
    McDonald, George W.
    Yang, Wenrui
    Frederick, William James
    Iisa, Kristiina
    Kreutz, Thomas G.
    Malcolm, Earl W.
    Brown, Craig A.
    TAPPI Journal, 2000, 83 (06):
  • [9] Cost-benefit evaluation of inspection and repair planning for ship structures considering corrosion effects
    Li, Dianqing
    Tang, Wenyong
    Zhang, Shengkun
    Proceedings of the 24th International Conference on Offshore Mechanics and Arctic Engineering, Vol 2, 2005, : 69 - 78
  • [10] Development of rehabilitation plans for water mains replacement considering risk and cost-benefit assessment
    Giustolisi, Orazio
    Laucelli, Daniele
    Savic, Dragan A.
    CIVIL ENGINEERING AND ENVIRONMENTAL SYSTEMS, 2006, 23 (03) : 175 - 190