Modeling and analysis of transition-point disappearance in high-speed railway pantograph-catenary system

被引:0
|
作者
Chen, Junqing [1 ]
Liu, Jidong [1 ]
Guan, Jinfa [1 ,2 ]
Han, Feng [1 ]
Wu, Jiqing [1 ]
Chen, Weirong [1 ]
机构
[1] Southwest Jiaotong Univ, Sch Elect Engn, Chengdu, Sichuan, Peoples R China
[2] Southwest Jiaotong Univ, Sch Elect Engn, 999 Xian Rd, Chengdu 611756, Sichuan, Peoples R China
关键词
Pantograph; pantograph-head profile; transition-point disappearance; mechanical analysis; high-speed rail; FAULT-DIAGNOSIS; NETWORK;
D O I
10.1177/16878132231210083
中图分类号
O414.1 [热力学];
学科分类号
摘要
During the operation of high-speed railway, the transition-point disappearance phenomenon, which is caused by the deformation of pantograph head, poses a safety threat to the pantograph-catenary system. In this study, the analytical model for transition-point disappearance analysis is presented. The instantaneous profile, as well as the deformation process of the pantograph head under different contact force values and positions or different pantograph-head parameters can be solved using the model. Curve equation, force analysis, coordinate axis rotation, and few other methods are adopted to achieve simplified modeling. The proposed modeling method and analysis conclusion provide theoretical support for the permissible contact force range calculation and pantograph-head parameters optimization to prevent transition-point disappearance. The effectiveness of the proposed model is verified using both finite element simulation and experimental measurements. Finally, a case analysis for the prevention of transition-point disappearance is conducted, using pantographs with the models CX-GI and DSA250 as examples.
引用
收藏
页数:13
相关论文
共 50 条
  • [31] Experimental study of electromagnetic radiation characteristics of pantograph-catenary off-line arcs in high-speed railway
    Jin M.
    Liu S.
    Xing T.
    Yang C.
    Liu W.
    Fang Q.
    Hu M.
    Dianli Zidonghua Shebei/Electric Power Automation Equipment, 2022, 42 (12): : 177 - 183
  • [32] Research on the Fatigue Life of High-Speed Railway Contact Wire Based on Measured Pantograph-Catenary Contact Force
    Li, Xiangdong
    Wei, Youchun
    Dai, Linfeng
    Zhongguo Tiedao Kexue/China Railway Science, 2024, 45 (04): : 168 - 179
  • [33] Hybrid active and semi-active control for pantograph-catenary system of high-speed train
    Khan, I. U.
    Wagg, D.
    Sims, N. D.
    PROCEEDINGS OF ISMA2016 INTERNATIONAL CONFERENCE ON NOISE AND VIBRATION ENGINEERING AND USD2016 INTERNATIONAL CONFERENCE ON UNCERTAINTY IN STRUCTURAL DYNAMICS, 2016, : 171 - 182
  • [34] A pantograph-catenary arcing detection model for high-speed railway based on semantic segmentation and generative adversarial network
    Liu, Xiaohong
    Wang, Xiaoyu
    Quan, Wei
    Gu, Guoxin
    Xu, Xiaoqian
    Gao, Shibin
    INTERNATIONAL JOURNAL OF RAIL TRANSPORTATION, 2024,
  • [35] Simulation of Fuzzy Control Applied to a Railway Pantograph-Catenary System
    Walters, Simon
    KNOWLEDGE-BASED AND INTELLIGENT INFORMATION AND ENGINEERING SYSTEMS, PT II, 2010, 6277 : 322 - 330
  • [36] Sensitivity Analysis of Pantograph-Catenary System Model
    Mahajan, Priya
    Garg, Rachana, Sr.
    Kumar, Parmod
    2012 IEEE 5TH INDIA INTERNATIONAL CONFERENCE ON POWER ELECTRONICS (IICPE 2012), 2012,
  • [37] Toward Reliable High-Speed Railway Pantograph-Catenary System State Detection: Multitask Deep Neural Networks With Runtime Reliability Monitoring
    Li, Biyu
    Kang, Gaoqiang
    Wang, Hu
    Liu, Haitao
    Lin, Jun
    Wang, Junping
    Wang, Yuyi
    IEEE TRANSACTIONS ON INSTRUMENTATION AND MEASUREMENT, 2024, 73 : 1 - 11
  • [38] ArcMask: a robust and fast image-based method for high-speed railway pantograph-catenary arcing instance segmentation
    Wei Quan
    Shaopeng Guo
    Xuemin Lu
    Guoxin Gu
    Wenjing Cheng
    Ning Zhou
    Long Yu
    Neural Computing and Applications, 2023, 35 : 6875 - 6890
  • [39] Identification of Railway Pantograph-Catenary Contact Force Based on Data Modeling
    Guo J.
    Ke Z.
    Liu J.
    Zhang W.
    Yang Z.
    Cui W.
    Zhongguo Tiedao Kexue/China Railway Science, 2021, 42 (04): : 145 - 154
  • [40] Study on current-collection of high-speed pantograph-catenary system and distance between two pantographs
    Wu Y.
    Wu J.-Y.
    Zheng J.-H.
    Song H.-L.
    Zheng Q.-L.
    Tiedao Xuebao/Journal of the China Railway Society, 2010, 32 (04): : 38 - 43