Flexible job-shop scheduling method based on interval grey processing time

被引:3
|
作者
Xu, Wenxing [1 ]
Wu, Wentong [1 ]
Wang, Yao [1 ]
He, Yunliang [2 ]
Lei, Zhimei [3 ]
机构
[1] Beijing Inst Petrochem Technol, Coll Informat Engn, Beijing 102617, Peoples R China
[2] Beijing Inst Petrochem Technol, Coll Chem Engn, Beijing 102617, Peoples R China
[3] Kunming Univ Sci & Technol, Fac Management & Econ, Kunming 650500, Yunnan, Peoples R China
关键词
Flexible job shop scheduling problem; Uncertainty modeling; Initialization; DPSO algorithm; Interval grey processing time; ALGORITHM; MODEL;
D O I
10.1007/s10489-022-04213-9
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
With the complexity of industrial products, the processing time of products is affected by many factors, and it is difficult to give a concrete time estimate. Therefore, it is significant to study the flexible job shop scheduling problem (FJSP) with uncertain processing time. This paper defines the uncertain processing time as the interval grey processing time (IGPT). Also, an FJSP model with IGPT (G-FJSP) is formulated to minimize the interval grey maximum completion time, and the mathematical operation rules of IGPT are improved. Based on this, a step-size adaptive discrete particle swarm algorithm with load balancing (LS-DPSO) is put forward to solve the G-FJSP model. The experimental analysis on six classical test cases indicates that LS-DPSO outperforms four algorithms proposed in recent literature in terms of speed and solution quality. Taking IMK05 as an example, the minimum and the average values of LS-DPSO IGPT are 1.8% and 2.2% smaller than the optimal results of other four algorithms. Also, the resulting grey Gantt chart has better processing time flexibility to guide practical production.
引用
收藏
页码:14876 / 14891
页数:16
相关论文
共 50 条
  • [21] An improved artificial bee colony algorithm for flexible job-shop scheduling problem with fuzzy processing time
    Gao, Kai Zhou
    Suganthan, Ponnuthurai Nagaratnam
    Pan, Quan Ke
    Chua, Tay Jin
    Chong, Chin Soon
    Cai, Tian Xiang
    [J]. EXPERT SYSTEMS WITH APPLICATIONS, 2016, 65 : 52 - 67
  • [22] Flexible job-shop fuzzy scheduling based on fuzzy delivery deadline
    Zhao, Lili
    Chen, Chao
    [J]. Academic Journal of Manufacturing Engineering, 2019, 17 (01): : 51 - 56
  • [23] Scheduling for the Flexible Job-Shop Problem Based on a Hybrid Genetic Algorithm
    Wang, JinFeng
    Fan, XiaoLiang
    [J]. SENSOR LETTERS, 2011, 9 (04) : 1520 - 1525
  • [24] FLEXIBLE JOB-SHOP SCHEDULING PROBLEM BASED ON HYBRID ACO ALGORITHM
    Wu, J.
    Wu, G. D.
    Wang, J. J.
    [J]. INTERNATIONAL JOURNAL OF SIMULATION MODELLING, 2017, 16 (03) : 497 - 505
  • [25] A Genetic Algorithm for the Flexible Job-Shop Scheduling Problem
    Wang, Jin Feng
    Du, Bi Qiang
    Ding, Hai Min
    [J]. ADVANCED RESEARCH ON COMPUTER SCIENCE AND INFORMATION ENGINEERING, PT I, 2011, 152 : 332 - 339
  • [26] Research on Strategy of Dynamic Flexible Job-shop Scheduling
    Pan, Ying
    Xue, Dongjuan
    Gao, Tianyi
    Zhou, Libin
    Xie, Xiaoyu
    [J]. APPLIED MATERIALS AND TECHNOLOGIES FOR MODERN MANUFACTURING, PTS 1-4, 2013, 423-426 : 2237 - +
  • [27] A genetic algorithm for the Flexible Job-shop Scheduling Problem
    Pezzella, F.
    Morganti, G.
    Ciaschetti, G.
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2008, 35 (10) : 3202 - 3212
  • [28] A Hybrid Algorithm for Flexible Job-shop Scheduling Problem
    Tang, Jianchao
    Zhang, Guoji
    Lin, Binbin
    Zhang, Bixi
    [J]. CEIS 2011, 2011, 15
  • [29] Adaptive Representation for Flexible Job-Shop Scheduling and Rescheduling
    Unachak, Prakarn
    Goodman, Erik
    [J]. WORLD SUMMIT ON GENETIC AND EVOLUTIONARY COMPUTATION (GEC 09), 2009, : 511 - 516
  • [30] Genetic algorithm for the flexible job-shop scheduling problem
    Kacem, I
    [J]. 2003 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN AND CYBERNETICS, VOLS 1-5, CONFERENCE PROCEEDINGS, 2003, : 3464 - 3469