Flexible job-shop scheduling method based on interval grey processing time

被引:3
|
作者
Xu, Wenxing [1 ]
Wu, Wentong [1 ]
Wang, Yao [1 ]
He, Yunliang [2 ]
Lei, Zhimei [3 ]
机构
[1] Beijing Inst Petrochem Technol, Coll Informat Engn, Beijing 102617, Peoples R China
[2] Beijing Inst Petrochem Technol, Coll Chem Engn, Beijing 102617, Peoples R China
[3] Kunming Univ Sci & Technol, Fac Management & Econ, Kunming 650500, Yunnan, Peoples R China
关键词
Flexible job shop scheduling problem; Uncertainty modeling; Initialization; DPSO algorithm; Interval grey processing time; ALGORITHM; MODEL;
D O I
10.1007/s10489-022-04213-9
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
With the complexity of industrial products, the processing time of products is affected by many factors, and it is difficult to give a concrete time estimate. Therefore, it is significant to study the flexible job shop scheduling problem (FJSP) with uncertain processing time. This paper defines the uncertain processing time as the interval grey processing time (IGPT). Also, an FJSP model with IGPT (G-FJSP) is formulated to minimize the interval grey maximum completion time, and the mathematical operation rules of IGPT are improved. Based on this, a step-size adaptive discrete particle swarm algorithm with load balancing (LS-DPSO) is put forward to solve the G-FJSP model. The experimental analysis on six classical test cases indicates that LS-DPSO outperforms four algorithms proposed in recent literature in terms of speed and solution quality. Taking IMK05 as an example, the minimum and the average values of LS-DPSO IGPT are 1.8% and 2.2% smaller than the optimal results of other four algorithms. Also, the resulting grey Gantt chart has better processing time flexibility to guide practical production.
引用
收藏
页码:14876 / 14891
页数:16
相关论文
共 50 条
  • [1] Flexible job-shop scheduling method based on interval grey processing time
    Wenxing Xu
    Wentong Wu
    Yao Wang
    Yunliang He
    Zhimei Lei
    [J]. Applied Intelligence, 2023, 53 : 14876 - 14891
  • [2] Flexible job-shop scheduling problem with job precedence constraints and interval grey processing time
    Zhu, Zhenwei
    Zhou, Xionghui
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2020, 149
  • [3] Flexible job shop scheduling problem with interval grey processing time
    Xie, Naiming
    Chen, Nanlei
    [J]. APPLIED SOFT COMPUTING, 2018, 70 : 513 - 524
  • [4] Flexible flow shop scheduling with interval grey processing time
    Wang, Yuquan
    Xie, Naiming
    [J]. GREY SYSTEMS-THEORY AND APPLICATION, 2021, 11 (04) : 779 - 795
  • [5] An Improved Grey Wolf Optimizer for Flexible Job-shop Scheduling Problem
    Ye Jieran
    Wang Aimin
    Yan, Ge
    Shen Xinyi
    [J]. PROCEEDINGS OF 2020 IEEE 11TH INTERNATIONAL CONFERENCE ON MECHANICAL AND INTELLIGENT MANUFACTURING TECHNOLOGIES (ICMIMT 2020), 2020, : 213 - 217
  • [6] Job-shop scheduling with processing alternatives
    Kis, T
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2003, 151 (02) : 307 - 332
  • [7] THE IMPACT OF PROCESSING TIME KNOWLEDGE ON DYNAMIC JOB-SHOP SCHEDULING
    WEIN, LM
    OU, JH
    [J]. MANAGEMENT SCIENCE, 1991, 37 (08) : 1002 - 1014
  • [8] A genetic algorithm for flexible job-shop scheduling
    Chen, HX
    Ihlow, J
    Lehmann, C
    [J]. ICRA '99: IEEE INTERNATIONAL CONFERENCE ON ROBOTICS AND AUTOMATION, VOLS 1-4, PROCEEDINGS, 1999, : 1120 - 1125
  • [9] Flexible Job-Shop Scheduling with Changeover Priorities
    Milne, Holden
    Adesina, Opeyemi
    Campbell, Russell
    Friesen, Barbara
    Khawaja, Masud
    [J]. MACHINE LEARNING, OPTIMIZATION, AND DATA SCIENCE (LOD 2021), PT I, 2022, 13163 : 611 - 625
  • [10] Overlap Algorithms in Flexible Job-shop Scheduling
    Gutierrez, Celia
    [J]. INTERNATIONAL JOURNAL OF INTERACTIVE MULTIMEDIA AND ARTIFICIAL INTELLIGENCE, 2014, 2 (06): : 41 - 47