Numerical investigation of a novel concrete-to-steel column splice in mixed structures in height

被引:2
|
作者
Bahri, Farshad [1 ]
Bahri, Farzad [2 ,4 ]
Moeini, Milad Ehteshami [3 ]
机构
[1] Islamic Azad Univ, Dept Civil Engn, Cent Tehran Branch, Tehran, Iran
[2] Struct Head Bonsar Shahr Consulting Engineers, Dept Civil Engn, Tehran, Iran
[3] Univ Sci & Culture, Dept Civil Engn, Tehran, Iran
[4] Semnan Univ, Dept Civil Engn, Semnan, Iran
关键词
Mixed -in -Height Structure; Transition Column Splice; Transition -Level Column; Finite Element Analysis (FEM); Hysteretic Behavior; SHEAR CONNECTORS; BEHAVIOR; BUILDINGS; MODEL; BEAM;
D O I
10.1016/j.istruc.2023.105526
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Buildings in which the type of structural material changes between their stories are referred to as mixed-in-height structures. Typically, these buildings have concrete structures in lower stories and steel structures in upper stories. Valuable investigations have been conducted on mixed-in-height structures to explore their seismic response and changes in structural natural period due to the sudden change in the lateral stiffness at transition level and mass irregularity, but scant attention has been given to the connection between steel and concrete structures at varying heights. Given the geometrical limitations of existing concrete structures, the dimensions of steel columns in supplementary stories must align with those of reinforced concrete columns. Consequently, building codes have not yet provided guidelines for proper connection details and effective load transfer from upper steel to lower concrete structures which is crucial due to the abrupt changes in stiffness and force transfer mechanisms in such splice connections. Thus, this study considers Numerical investigation on two full-scale laboratory tested specimens, with similar details but different axial loads, and numerical analysis of a new connection between a concrete and a steel column at the transition level. This research examines the afore-mentioned connection under two boundary conditions. Furthermore, after validating the numerical models with experimental specimens, axial load parameters, relative percentage of reinforcement to concrete area, and the force-displacement diagrams are presented. Finally, a numerical model of a three-story column in a frame is analyzed using finite element analysis under lateral load, and the sequence of plastic hinge formation is studied. The practicality and effectiveness of the proposed splice was verified herein. Furthermore, the average value of ductility (mu) was calculated to be 5.5, while exhibiting negligible overstrength factor (omega). Similar response parameters were calculated for F-AL-R2 (43.2 kN/mm, 21.1 kN/mm) and F-AL-R3 (43.8 kN/mm, 22 kN/mm), indicating that the influence of increased rebar percentage diminishes at higher values. The analysis demonstrates that column connection failure did not occur, and the sequence of hinge formation was from top to bottom, validating the suitable performance of the proposed connection.
引用
收藏
页数:18
相关论文
共 50 条
  • [41] Directly Reusable Steel Column Base Connection - Concept and Numerical investigation
    Jeyabalan, Aswin Kumar
    Selvaraj, Sivaganesh
    Chan, Tak-Ming
    ce/papers, 2023, 6 (3-4) : 352 - 357
  • [42] Behavior of bare type column base connection in steel reinforced concrete structures
    Sadasue, K
    Fujiwara, D
    Minami, K
    ADVANCES IN STRUCTURES, VOLS 1 AND 2, 2003, : 1243 - 1250
  • [43] Mixed numerical-experimental damage recognition in steel structures
    Ravaii, H
    Toropov, VV
    Horoshenkov, KV
    EXPERIMENTAL MECHANICS, VOLS 1 AND 2: ADVANCES IN DESIGN, TESTING AND ANALYSIS, 1998, : 77 - 82
  • [44] Experimental investigation of embedded steel plates in reinforced concrete structures
    Kallolil, JJ
    Chakrabarti, SK
    Mishra, RC
    ENGINEERING STRUCTURES, 1998, 20 (1-2) : 105 - 112
  • [45] Experimental and theoretical investigation on strength of concrete filled circular steel tubular column
    Wei, H.
    Wang, H. J.
    Xu, J. H.
    ISISS '2007: PROCEEDINGS OF THE INNOVATION AND SUSTAINABILITY OF STRUCTURES, VOLS 1 AND 2, 2008, : 612 - 623
  • [46] A numerical investigation on the through rib stiffener beam to concrete-filled steel tube column connections subjected to cyclic loading
    Ansari, M.
    Jeddi, M. Z.
    Badaruzzaman, W. H. W.
    Tahir, M. M.
    Osman, S. A.
    Hosseinpour, E.
    ENGINEERING SCIENCE AND TECHNOLOGY-AN INTERNATIONAL JOURNAL-JESTECH, 2021, 24 (03): : 728 - 735
  • [47] Experimental and numerical investigation of multi-cavity concrete-filled double-skin steel tubular short column
    Yan, Xueyuan
    Shi, Shen
    Yu, Jitao
    Zheng, Xinying
    Liu, Jian
    Chen, Wenhui
    JOURNAL OF CONSTRUCTIONAL STEEL RESEARCH, 2025, 227
  • [48] CALCULUS OF METALIC AND STEEL-CONCRETE MIXED STRUCTURES AT FIRE ACTIONS
    Afronie, Eugen Marius
    Manescu, Tiberiu Stefan
    Ianici, Sava
    MACHINE AND INDUSTRIAL DESIGN IN MECHANICAL ENGINEERING, SEVENTH INTERNATIONAL SYMPOSIUM, KOD 2012, 2012, : 515 - 518
  • [49] Influence of the constraint condition of column ends on seismic performance of a novel prefabricated concrete frame beam - An experimental and numerical investigation
    Lv, Xiaoyong
    Yu, Zhiwu
    Shan, Zhi
    ENGINEERING STRUCTURES, 2020, 223
  • [50] Investigation of dowel action on a steel-concrete bond model for reinforced concrete structures
    Turgut, C.
    Jason, L.
    Davenne, L.
    Pirard, A.
    COMPUTATIONAL MODELLING OF CONCRETE STRUCTURES. EURO-C 2018, 2018, : 737 - 744