Exploring Cost Variability and Risk Management Optimization in Natural Disaster Prevention Projects

被引:0
|
作者
Cho, Jin-Ho [1 ]
Shin, Young-Su [2 ]
Kim, Jae-June [3 ]
Kim, Byung-Soo [3 ]
机构
[1] Kyungpook Natl Univ, Dept Ctr Intelligent Construct Automat, 80 Daehakro, Daegu 41566, South Korea
[2] Kyungpook Natl Univ, Dept Law Sch, 80 Daehakro, Daegu 41566, South Korea
[3] Kyungpook Natl Univ, Dept Civil Engn, 80 Daehakro, Daegu 41566, South Korea
基金
新加坡国家研究基金会;
关键词
natural disaster prevention projects; cost deviation; binary logistic regression; risk management strategy; project management optimization;
D O I
10.3390/buildings14020391
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The purpose of this study is to analyze the causes of cost variation in natural disaster prevention projects (NDPPs) in Gyeongsangbuk-do, South Korea, and develop tailored cost and risk management strategies. Utilizing a binary logistic regression model, this research uniquely focuses on the Gyeongsangbuk-do region, gathering data from 244 stakeholders through an online survey. The study identifies critical variables influencing cost deviation, including project management risk (PMR), project costing and execution risk (PCER), project execution strategy risk (PESR), construction project risk (CPR), project cost and schedule risk (PCSR), project management challenges (PMCs), and construction project subcontractor and safety management (CPSSM). Significant findings revealed PMR (OR = 3.744, 95% C.I. [1.657, 8.457]), PCER (OR = 5.068, 95% C.I. [2.236, 11.484]), and PESR (OR = 3.447, 95% C.I. [1.853, 6.413]) as the primary causes of cost deviation, alongside the notable impacts of other factors such as CPSSM. The developed predictive model is instrumental for NDPP stakeholders in Gyeongsangbuk-do, providing advanced risk management capabilities and aiding in effective preventive measures. This study not only corroborates theoretical hypotheses from previous research but also offers new insights into cost deviation causes in NDPPs, thereby enhancing strategic decision-making and advancing risk management perspectives.
引用
收藏
页数:20
相关论文
共 50 条
  • [21] Management System for Natural Risk Disaster on Infrastructure: A Regional Approach
    Valenzuela, M. A.
    Valenzuela, N.
    Pena-Fritz, A.
    Ramo, R.
    MAINTENANCE, SAFETY, RISK, MANAGEMENT AND LIFE-CYCLE PERFORMANCE OF BRIDGES, 2018, : 2335 - 2342
  • [22] Flexibility analysis in management of risk investment in natural gas projects
    Cao Ying
    Jia Limin
    PROCEEDINGS OF INTERNATIONAL SYMPOSIUM ON STATISTICS AND MANAGEMENT SCIENCE 2010, 2010, : 70 - 74
  • [23] Re-cognition of Natural Disaster Risk Models and Discussion of the Theoretical Basis of Integrated Disaster Risk Management
    Wang Shaoyu
    Tang Guijuan
    IDRC: PROCEEDING OF CHINA WENCHUAN EARTHQUAKE SPECIAL PLENARY SESSION AT IDRC DAVOS 2008, 2009, : 120 - 128
  • [24] Strengthening Governance for Disaster Prevention: The Enhancing Risk Management Capabilities Guidelines
    Albris, Kristoffer
    Lauta, Kristian Cedervall
    Raju, Emmanuel
    INTERNATIONAL JOURNAL OF DISASTER RISK REDUCTION, 2020, 47
  • [25] Integrated Disaster Risk Management in Indian Environment: Prediction, Prevention and Preparedness
    Usman, Adil
    2017 IEEE GLOBAL HUMANITARIAN TECHNOLOGY CONFERENCE (GHTC), 2017,
  • [26] Addressing Disaster Risk Management in Meteorological Disasters Prevention and Mitigation in China
    Bao Wen
    PROCEEDINGS OF 2012 INTERNATIONAL CONFERENCE ON PUBLIC ADMINISTRATION (8TH), VOL III, 2012, : 548 - 554
  • [27] The role of Foresight in avoiding systematic failure of natural disaster risk management
    Jahangiri, Katayoun
    Eivazi, Mohammad-Rahim
    Mofazali, Ardeshir Sayah
    INTERNATIONAL JOURNAL OF DISASTER RISK REDUCTION, 2017, 21 : 303 - 311
  • [28] Same movie, new actors Natural disaster risk management in Peru
    Aguero, Aileen
    Aguilar, Diego
    PERU: EL PROBLEMA AGRANO EN DEBATE (SEPIA XVIII), 2020, : 433 - 468
  • [29] A novel strategy to determine the insurance and risk control plan for natural disaster risk management
    Cheng-Wu Chen
    Chun-Pin Tseng
    Wen-Ko Hsu
    Wei-Ling Chiang
    Natural Hazards, 2012, 64 : 1391 - 1403
  • [30] Application of probabilistic cost and schedule risk assessment and risk management to large infrastructure projects
    McGrath, T. C.
    Roberds, W. J.
    Keizur, A. E.
    del Olmo, A. Gutierrez
    Barbato, I.
    SAFETY AND RELIABILITY FOR MANAGING RISK, VOLS 1-3, 2006, : 2093 - +