共 50 条
- [21] Two-agent scheduling problems on a single-machine to minimize the total weighted late work Journal of Combinatorial Optimization, 2017, 33 : 945 - 955
- [23] Minimizing makespan for mixed batch scheduling with identical machines and unequal ready times SCIENTIFIC REPORTS, 2025, 15 (01):
- [24] Two-agent single-machine scheduling to minimize resource consumption with a constraint on the makespan PROCEEDINGS OF 2013 6TH INTERNATIONAL CONFERENCE ON INFORMATION MANAGEMENT, INNOVATION MANAGEMENT AND INDUSTRIAL ENGINEERING (ICIII 2013) VOL 1, 2013, : 487 - 489