共 50 条
- [2] Two-Stage Robust Optimization of Multi-energy System Considering Integrated Demand Response [J]. 2021 11TH INTERNATIONAL CONFERENCE ON POWER AND ENERGY SYSTEMS (ICPES 2021), 2021, : 783 - 789
- [3] Comprehensive Energy Efficiency Assessment of Park-level Multi-energy System Considering Difference of Energy Grade [J]. Dianwang Jishu/Power System Technology, 2019, 43 (08): : 2835 - 2842
- [4] Multi-stage Planning of Park-level Integrated Energy System Considering Construction Time Sequence [J]. Zhongguo Dianji Gongcheng Xuebao/Proceedings of the Chinese Society of Electrical Engineering, 2020, 40 (21): : 6815 - 6827
- [6] Study on Cascade Optimization Operation of Park-level Integrated Energy System Considering Dynamic Energy Efficiency Model [J]. Dianwang Jishu/Power System Technology, 2022, 46 (03): : 1027 - 1038
- [9] Optimal Dispatch of Park-level Integrated Energy Systems Considering the Risk of Insufficient Operational Flexibility [J]. Gaodianya Jishu/High Voltage Engineering, 2024, 50 (02): : 704 - 713
- [10] Bilevel optimal coordinated control strategy for park-level integrated energy system [J]. RENEWABLE ENERGY INTEGRATION WITH MINI/MICROGRID, 2018, 145 : 44 - 53