Bilevel optimal coordinated control strategy for park-level integrated energy system

被引:1
|
作者
Liua, Yuquan [1 ]
Zhao, Yuehao [2 ]
Peng, Ke [2 ]
Xu, Bingyin [2 ]
Wang, Li [1 ]
Hua, Huangsheng [1 ]
机构
[1] Guangzhou Power Supply Bur Co Ltd, Guangzhou 510620, Guangdong, Peoples R China
[2] Shandong Univ Technol, Sch Elect & Elect Engn, Zibo 255000, Peoples R China
关键词
park-level integrated energy system; bilevel optimal coordination control strategy; peak shifting; integrated demand response;
D O I
10.1016/j.egypro.2018.04.009
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
A bilevel optimal coordinated control strategy for park-level integrated energy system is proposed in this paper. In the case of normal operation, the minimization of operation cost is set as the goal for lower-level and upper-level control system, with the purpose of optimal control for their own resources. In the case of overload, the minimization of peak load shifting cost is set as the goal for the upper-level control system, which can be achieved by coordinating directly controlled upper-level resources and various demand response resources in the industrial park. Copyright (C) 2018 The Authors. Published by Elsevier Ltd.
引用
收藏
页码:44 / 53
页数:10
相关论文
共 50 条
  • [1] Review on Optimal Operation of Park-level Integrated Energy System
    Zhu, Jianquan
    Liu, Haixin
    Ye, Hanfang
    Chen, Jiajun
    Chen, Laijun
    Mei, Shengwei
    [J]. Gaodianya Jishu/High Voltage Engineering, 2022, 48 (07): : 2469 - 2482
  • [2] Research on Local Optimal Dispatching Method of Park-Level Integrated Energy System
    Fu, Lin
    Ma, Tao
    Cheng, Yuhang
    Su, Kun
    Hou, Lei
    Li, Peng
    [J]. PROCEEDINGS OF 2019 IEEE 3RD INTERNATIONAL ELECTRICAL AND ENERGY CONFERENCE (CIEEC), 2019, : 1211 - 1216
  • [3] Evaluation Method of Park-Level Integrated Energy System for Microgrid
    Zhang, Shixiang
    Lü, Shuaikang
    [J]. Dianwang Jishu/Power System Technology, 2018, 42 (08): : 2431 - 2438
  • [4] Low-Carbon Operation Strategy of Park-Level Integrated Energy System with Firefly Algorithm
    Chen, Hongyin
    Wang, Songcen
    Yu, Yaoxian
    Guo, Yi
    Jin, Lu
    Jia, Xiaoqiang
    Liu, Kaicheng
    Zhang, Xinhe
    [J]. APPLIED SCIENCES-BASEL, 2024, 14 (13):
  • [5] Dispatching Strategy for Low-Carbon Flexible Operation of Park-Level Integrated Energy System
    Meng, Qinglin
    Zu, Guoqiang
    Ge, Leijiao
    Li, Shengwei
    Xu, Liang
    Wang, Rui
    He, Kecheng
    Jin, Shangting
    [J]. APPLIED SCIENCES-BASEL, 2022, 12 (23):
  • [6] Optimal configuration of park-level integrated energy system considering integrated demand response and construction time sequence
    Liu, Chang
    Li, Yan
    Wang, Qingshan
    Wang, Xin
    Chen, Changming
    Lin, Zhenzhi
    Yang, Li
    [J]. ENERGY REPORTS, 2022, 8 : 1174 - 1180
  • [7] Optimal Configuration Method of Park-level Integrated Energy System Considering Optimal Construction Time Sequence and Cloud Energy Storage
    Chen, Changming
    Zhang, Qun
    Huang, Yixin
    Wang, Xin
    Wang, Decheng
    Yang, Li
    Lin, Zhenzhi
    [J]. Dianli Xitong Zidonghua/Automation of Electric Power Systems, 2022, 46 (02): : 24 - 32
  • [8] Optimal operation of park-level integrated energy system based on multi-agent cooperative game
    Xu, Kaiwen
    Liu, Zeyu
    Sun, Weichen
    [J]. FRONTIERS IN ENERGY RESEARCH, 2022, 10
  • [9] Optimal Co-planning of Park-level Integrated Heat and Electricity Energy Systems
    Wang, Fuyue
    Liu, Haoming
    Chen, Yuming
    Wu, Junji
    Yang, Bin
    Ruan, Wenjun
    [J]. 2018 5TH INTERNATIONAL CONFERENCE ON ELECTRIC POWER AND ENERGY CONVERSION SYSTEMS (EPECS), 2018,
  • [10] Multi-objective Optimal Dispatching for Active Distribution Network Considering Park-level Integrated Energy System
    Ma, Yanfeng
    Xie, Jiarong
    Zhao, Shuqiang
    Wang, Zijian
    Luo, Zerong
    [J]. Dianli Xitong Zidonghua/Automation of Electric Power Systems, 2022, 46 (13): : 53 - 61