Analysis of the disc cutters spacing in the face area of a small diameter TBM

被引:0
|
作者
Lee, S. Y. [1 ]
Song, K. I. [1 ]
Ryu, H. W. [2 ]
Kang, K. N. [1 ]
Lee, D. G. [1 ]
机构
[1] Inha Univ, Incheon, South Korea
[2] Korea Elect Power Res Inst KEPRI, Daejeon, South Korea
关键词
PERFORMANCE; TUNNEL; MODEL;
D O I
10.1201/9781003348030-157
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
When designing a TBM cutter head, Disc cutters spacing is an important design variable because it greatly affects the excavation efficiency of TBM. The excavation efficiency by the disc cutter can be confirmed through the specific energy, and the specific energy can be calculated by dividing the cutting energy by the excavated volume. The specific energy varies according to the disc cutter spacing and the penetration depth. As the spacing between the disc cutters increases, the specific energy decreases and then increases again after a certain value. In this case, the disc cutter spacing in the section showing the minimum specific energy is called the optimal cutter spacing. As a result of investigating the 14-inch disk cutter spacing of the small shield TBM used in Korea, the disk cutter spacing was found between 80 mm and 100 mm. However, the clear basis for this cutter spacing is not known. Therefore, in this study, we investigated the disc cutter spacing of TBM used in Korea and study to verify it through numerical analysis of the discrete element method. As a result of performing the numerical analysis of the discrete element method, it was confirmed that the optimum specific energy was shown between 70 mm and 100 mm the disc cutter spacing. These results show that the cutter spacing of the currently used TBM is reasonable.
引用
收藏
页码:1323 / 1327
页数:5
相关论文
共 50 条
  • [41] Effect of replacing disc cutters with chisel tools on performance of a TBM in difficult ground conditions
    Bilgin, Nuh
    Copur, Hanifi
    Balci, Cemal
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2012, 27 (01) : 41 - 51
  • [42] Design Aspects Governing Disc Cutters and Cutterheads of Hard Rock TBM-A Review
    Dash, Biswaraj
    Murthy, V. M. S. R.
    Chattopadhyaya, Somnath
    MINING METALLURGY & EXPLORATION, 2024, 41 (01) : 363 - 378
  • [43] Effect of Spatial Variability on Disc Cutters Failure During TBM Tunneling in Hard Rock
    Dalong, Jin
    Zhichao, Shen
    Dajun, Yuan
    ROCK MECHANICS AND ROCK ENGINEERING, 2020, 53 (10) : 4609 - 4621
  • [44] Prediction Model for Normal and Flat Wear of Disc Cutters during TBM Tunneling Process
    Yang, Haiqing
    Liu, Bolong
    Wang, Yanqing
    Li, Chenchen
    INTERNATIONAL JOURNAL OF GEOMECHANICS, 2021, 21 (03)
  • [45] Effect of Spatial Variability on Disc Cutters Failure During TBM Tunneling in Hard Rock
    Jin Dalong
    Shen Zhichao
    Yuan Dajun
    Rock Mechanics and Rock Engineering, 2020, 53 : 4609 - 4621
  • [46] Application of block theory for evaluating face stability under disc cutters loading of TBM, case study of a water-conveyance tunnel project
    Zhang, Zixin
    Wang, Shuaifeng
    Huang, Xin
    Rostami, Jamal
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2019, 90 : 249 - 263
  • [47] The comparative analysis of rocks’ resistance to forward-slanting disc cutters and traditionally installed disc cutters
    Zhao-Huang Zhang
    Sun Fei
    Meng Liang
    Acta Mechanica Sinica, 2016, 32 : 690 - 695
  • [48] The comparative analysis of rocks' resistance to forward-slanting disc cutters and traditionally installed disc cutters
    Zhao-Huang Zhang
    Sun Fei
    Meng Liang
    Acta Mechanica Sinica, 2016, (04) : 690 - 695
  • [49] The comparative analysis of rocks' resistance to forward-slanting disc cutters and traditionally installed disc cutters
    Zhang, Zhao-Huang
    Fei, Sun
    Liang, Meng
    ACTA MECHANICA SINICA, 2016, 32 (04) : 690 - 695
  • [50] Analysis and prediction of small-diameter TBM performance in hard rock conditions
    Lehmann, Gabriel
    Kaeling, Heiko
    Hoch, Sebastian
    Thuro, Kurosch
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2024, 143