Hydropower Unit Commitment Using a Genetic Algorithm with Dynamic Programming

被引:1
|
作者
Liu, Shuangquan [1 ]
Wang, Pengcheng [2 ]
Xu, Zifan [2 ]
Feng, Zhipeng [3 ]
Zhang, Congtong [1 ]
Wang, Jinwen [2 ,4 ]
Chen, Cheng [5 ]
机构
[1] Yunnan Power Grid Co Ltd, Syst Operat Dept, 73 Tuodong Rd, Kunming 650011, Peoples R China
[2] Huazhong Univ Sci & Technol, Sch Civil & Hydraul Engn, 1037 Luoyu Rd, Wuhan 430074, Peoples R China
[3] Huaneng Lancang River Hydropower Inc, 1 Shijicheng Rd, Kunming 650214, Peoples R China
[4] Huazhong Univ Sci & Technol, Inst Water Resources & Hydropower, 1037 Luoyu Rd, Wuhan 430074, Peoples R China
[5] Kunming Univ Sci & Technol, Fac Elect Engn, 727 Jingming South Rd, Kunming 650500, Peoples R China
关键词
hydropower unit commitment (HUC); dynamic programming (DP); genetic algorithm (GA); progressive generating discharge allocation (PGDA); LAGRANGIAN-RELAXATION; MODEL;
D O I
10.3390/en16155842
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
This study presents a genetic algorithm integrated with dynamic programming to address the challenges of the hydropower unit commitment problem, which is a nonlinear, nonconvex, and discrete optimization, involving the hourly scheduling of generators in a hydropower system to maximize benefits and meet various constraints. The introduction of a progressive generating discharge allocation enhances the performance of dynamic programming in fitness evaluations, allowing for the fulfillment of various constraints, such as unit start-up times, shutdown/operating durations, and output ranges, thereby reducing complexity and improving the efficiency of the genetic algorithm. The application of the genetic algorithm with dynamic programming and progressive generating discharge allocation at the Manwan Hydropower Plant in Yunnan Province, China, showcases increased flexibility in outflow allocation, reducing spillages by 79%, and expanding high-efficiency zones by 43%.
引用
收藏
页数:13
相关论文
共 50 条
  • [31] AN ENHANCED DYNAMIC-PROGRAMMING APPROACH FOR UNIT COMMITMENT
    HOBBS, WJ
    HERMON, G
    WARNER, S
    SHEBLE, GB
    IEEE TRANSACTIONS ON POWER SYSTEMS, 1988, 3 (03) : 1201 - 1205
  • [32] Unit Commitment in Composite Generation and Transmission Systems Using Genetic Algorithm
    Chandrasekaran, K.
    Simon, Sishaj P.
    2009 WORLD CONGRESS ON NATURE & BIOLOGICALLY INSPIRED COMPUTING (NABIC 2009), 2009, : 1114 - 1119
  • [33] Modified Dynamic Programming Based Unit Commitment Technique
    Park, Joon-Hyung
    Kim, Sun-Kyo
    Park, Geun-Pyo
    Yoon, Yong-Tae
    Lee, Sang-Seung
    IEEE POWER AND ENERGY SOCIETY GENERAL MEETING 2010, 2010,
  • [34] SOLVING THE UNIT COMMITMENT PROBLEM USING AN ADAPTIVE IMMUNE GENETIC ALGORITHM
    Oonsivilai, Anant
    Marungsri, Boonruang
    INTERNATIONAL CONFERENCE ON POWER CONTROL AND OPTIMIZATION, 2008, 1052 : 256 - 262
  • [35] Solution to security constrained unit commitment problem using genetic algorithm
    Kumar, V. Senthil
    Mohan, M. R.
    INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2010, 32 (02) : 117 - 125
  • [36] Unit Commitment Problem with Emission Cost Constraints by Using Genetic Algorithm
    Yildirim, Mehmet
    Ozcan, Mustafa
    GAZI UNIVERSITY JOURNAL OF SCIENCE, 2022, 35 (03): : 957 - 967
  • [37] Unit commitment by annealing-genetic algorithm
    Cheng, CP
    Liu, CW
    Liu, CC
    INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2002, 24 (02) : 149 - 158
  • [38] Genetic Algorithm Solution to Unit Commitment Problem
    Madraswala, Hatim S.
    Deshpande, Anuradha S.
    PROCEEDINGS OF THE FIRST IEEE INTERNATIONAL CONFERENCE ON POWER ELECTRONICS, INTELLIGENT CONTROL AND ENERGY SYSTEMS (ICPEICES 2016), 2016,
  • [39] A gene complementary genetic algorithm for unit commitment
    Li, MJ
    Tong, TS
    ICEMS'2001: PROCEEDINGS OF THE FIFTH INTERNATIONAL CONFERENCE ON ELECTRICAL MACHINES AND SYSTEMS, VOLS I AND II, 2001, : 648 - 651
  • [40] A genetic algorithm approach to generator unit commitment
    Swarup, KS
    Yamashiro, S
    INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2003, 25 (09) : 679 - 687