A Dynamic Plunger Lift Model for Shale Gas Wells

被引:1
|
作者
Miao, Shiyu [1 ,2 ,3 ]
Liu, Xiao [4 ]
Feng, Xiaoya [6 ]
Shi, Haowen [1 ,2 ,3 ]
Luo, Wei [1 ,2 ,3 ]
Liu, Peng [5 ]
机构
[1] Yangtze Univ, Petr Engn Inst, Wuhan 430100, Peoples R China
[2] Yangtze Univ, Gas Lift Innovat Ctr, Lab Multiphase Pipe Flow, China Natl Petr Corp, Wuhan 430100, Peoples R China
[3] Key Lab Drilling & Prod Engn Oil & Gas, Wuhan 430100, Peoples R China
[4] Sichuan Shale Gas Explorat & Dev Ltd Liabil Co, Chengdu 640000, Peoples R China
[5] PetroChina Southwest Oil & Gas Field Co, Sichuan Changning Gas Dev Co, Chengdu 610051, Peoples R China
[6] PetroChina, Oil & Gas Technol Res Inst Changqing Oilfield Co, Xian 710018, Peoples R China
来源
关键词
Shale gas well; complex and more; complex well bore structure; plunger lift; loose coupling; simulation model;
D O I
10.32604/fdmp.2023.025681
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
At present, the optimization of the plunger mechanism is shale gas wells is mostly based on empirical methods, which lack a relevant rationale and often are not able to deal with the quick variations experienced by the pro-duction parameters of shale gas wells in comparison to conventional gas wells. In order to mitigate this issue, in the present work, a model is proposed to loosely couple the dynamics of gas inflow into shale gas wells with the dynamics of the liquid inflow. Starting from the flow law that accounts for the four stages of movement of the plunger, a dynamic model of the plunger lift based on the real wellbore trajectory is introduced. The model is then tested against 5 example wells, and it is shown that the accuracy level is higher than 90%. The well 'switch', optimized on the basis of simulations based on such a model, is tested through on-site experiments. It is shown that, compared with the original switch configuration, the average production of the sample well can be increased by about 15%.
引用
收藏
页码:1735 / 1751
页数:17
相关论文
共 50 条
  • [41] Case Study: Successful Application of a Novel Gas Lift Valve in Low Pressure Wells in Fuling Shale Gas Field
    Liu, Qiaoping
    Tang, Jingfei
    Ke, Wenqi
    Wang, Haibo
    Orivri, Uzezi Davis
    PROCESSES, 2023, 11 (01)
  • [42] Tuning a multi-fluid model for gas lift simulations in wells
    Behbahani, M. A.
    Edrisi, M.
    Rashidi, F.
    Amani, E.
    CHEMICAL ENGINEERING RESEARCH & DESIGN, 2012, 90 (04): : 471 - 486
  • [43] Gas Lift-Plunger Lift Combination Creates Full Life Cycle Production Solution
    Cope, Brent
    Gilmore, David
    JPT, Journal of Petroleum Technology, 2023, 75 (10): : 49 - 53
  • [44] Study on Failure Analysis of Gas Lift Plunger Under Eccentric State
    Cui, Lu
    Tian, Ke
    Cheng, Jiarui
    Li, Zhen
    ARABIAN JOURNAL FOR SCIENCE AND ENGINEERING, 2022, 47 (09) : 11733 - 11744
  • [45] A physical model for liquid leakage flow rate during plunger lifting process in gas wells
    Zhao, Kunpeng
    Tian, Wei
    Li, Xuri
    Bai, Bofeng
    JOURNAL OF NATURAL GAS SCIENCE AND ENGINEERING, 2018, 49 : 32 - 40
  • [46] Prediction of dynamic liquid level in water-producing shale gas wells based on liquid film model
    Nie, Jie
    Qiao, Lingxi
    Wang, Benqiang
    Wang, Weiyang
    Li, Mingzhong
    Zhou, Chenru
    FRONTIERS IN EARTH SCIENCE, 2023, 11
  • [47] Transient Process of Gas Liquid Flow Sealing in Plunger Lift Method
    Zhao, Kun-Peng
    Mu, Li-Jun
    Tian, Wei
    Bai, Bo-Feng
    Kung Cheng Je Wu Li Hsueh Pao/Journal of Engineering Thermophysics, 2020, 41 (05): : 1133 - 1138
  • [48] A dynamic prediction model of pressure control production performance of shale gas fractured horizontal wells and its application
    Jia A.
    Wei Y.
    Liu C.
    Wang J.
    Qi Y.
    Jia C.
    Li B.
    Natural Gas Industry, 2019, 39 (06) : 71 - 80
  • [49] Study on Failure Analysis of Gas Lift Plunger Under Eccentric State
    Lu Cui
    Ke Tian
    Jiarui Cheng
    Zhen Li
    Arabian Journal for Science and Engineering, 2022, 47 : 11733 - 11744
  • [50] Mechanistic model for computing fluid temperature profiles in gas-lift wells
    Hasan, AR
    Kabir, CS
    SPE PRODUCTION & FACILITIES, 1996, 11 (03): : 179 - 185