Coupling analysis method of grouting construction with deformation response of adjacent existing tunnel

被引:8
|
作者
Jiang, Ping-wei [1 ]
Zhang, Zhi-hong [1 ]
Zheng, Hong [1 ]
Huang, Jin-kun [2 ,3 ]
机构
[1] Beijing Univ Technol, Key Lab Urban Secur & Disaster Engn China, Minist Educ, Beijing 100124, Peoples R China
[2] China MCC17 Grp Co Ltd, Maanshan 243000, Anhui, Peoples R China
[3] Shanghai Jiao Tong Univ, Sch Naval Architecture Ocean & Civil Engn, Shanghai 200240, Peoples R China
基金
中国国家自然科学基金;
关键词
Grouting; Close-range underpass; Tunnel; Random medium theory; Euler-Bernoulli continuous beam; PREDICTION; SETTLEMENT; SLURRY;
D O I
10.1016/j.undsp.2023.07.005
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In the new tunnel under close distance through the existing tunnel risk source, the grouting scheme developed to compensate for stratum losses is still based on empirical methods, relying on the overburden thickness of existing tunnels. This can potentially lead to an excessively high or low probability of uplift of existing tunnels. Proposing a coupled deformation analysis method between the grouting construction and adjacent existing tunnels is of great theoretical significance for developing grouting schemes. In order to reasonably limit the design parameters of grouting construction, based on the theory of fluid-solid coupling elastic pore-column expansion and the theory of random media, the calculation method of stratum displacement which simultaneously considers the coexistence of grout compaction expansion and permeability diffusion mode is derived, and the accuracy of the calculation method is verified by engineering examples. The accuracy of this calculation method was verified through engineering examples. Combined with the deformation coordination condition, the existing tunnel is regarded as an elastic Euler-Bernoulli continuous beam, and the finite element coupling balance equation of the interaction between the existing tunnel and the surrounding soil is obtained. Based on this, a coupling calculation model of the grouting construction and the deformation response of the adjacent existing tunnel is established. Combined with three times of grouting construction examples in the shield tunneling project of Beijing Metro Line 12 under the existing airport line, the reliability of the coupling calculation model to determine the grouting construction parameters is verified. The calculation parameters in the coupling calculation model have clear physical meanings, which can provide a theoretical basis for the grouting design of similar risk source projects.
引用
收藏
页码:312 / 330
页数:19
相关论文
共 50 条
  • [31] Numberical Analysis in the Deformation of Adjacent Buildings and Underground Pile caused by Tunnel Shield Construction
    Zhang, Jianxin
    Wu, Tingliang
    PROGRESS IN CIVIL ENGINEERING, PTS 1-4, 2012, 170-173 : 1444 - 1449
  • [32] Analysis for Influence of Excavation on Adjacent Existing Shield Tunnel
    Cao, Jing
    Qian, Guowei
    Zuo, Haixi
    Liu, Haiming
    Ren, Yaliang
    Proceedings of the 2016 4th International Conference on Mechanical Materials and Manufacturing Engineering (MMME 2016), 2016, 79 : 650 - 657
  • [33] Control of existing tunnel deformation caused by shield adjacent undercrossing construction using interpretable machine learning and multiobjective optimization
    Chen, Hongyu
    Liu, Jun
    Shen, Geoffrey Qiping
    Feng, Zongbao
    Automation in Construction,
  • [34] Control of existing tunnel deformation caused by shield adjacent undercrossing construction using interpretable machine learning and multiobjective optimization
    Chen, Hongyu
    Liu, Jun
    Shen, Geoffrey Qiping
    Feng, Zongbao
    AUTOMATION IN CONSTRUCTION, 2025, 170
  • [35] Prediction of Deformation of Adjacent Existing Running Tunnel due to beneath Shield Tunneling
    Luo, Jiayin
    Ding, Deyun
    Xiao, Xiaoqi
    Ren, Weiming
    ADVANCES IN CIVIL AND STRUCTURAL ENGINEERING III, PTS 1-4, 2014, 501-504 : 1701 - +
  • [36] Research on effects of adjacent construction of new shield tunnel on longitudinal deformation of existent tunnel
    Lu D.
    Wang S.
    He C.
    Xia X.
    Wang, Shimin (wangshimin@swjtu.cn), 1600, Science Press (38): : 108 - 116
  • [37] Coupled fluid-mechanical analysis of DOT shield tunnel construction beneath adjacent existing underpass
    Chen Yu
    Zhang Qing-he
    Zhu Ji-wen
    Yao Hai-ming
    ROCK AND SOIL MECHANICS, 2010, 31 (06) : 1950 - +
  • [38] Coupled fluid-mechanical analysis of DOT shield tunnel construction beneath adjacent existing underpass
    Chen, Yu
    Zhang, Qing-He
    Zhu, Ji-Wen
    Yao, Hai-Ming
    Yantu Lixue/Rock and Soil Mechanics, 2010, 31 (06): : 1950 - 1955
  • [39] Deformation and Reinforcement of the Existing Tunnel Affected by New Shield Tunnel Construction with Small Clearance
    Zhang, Junchao
    Yu, Jiacheng
    Li, Cunjun
    Liu, Yizhou
    Tian, Longgang
    He, Yonglin
    Zhang, Qi
    BUILDINGS, 2025, 15 (02)
  • [40] Influence of high pressure jet grouting pile construction on deformation of existing railway subgrade
    Wang D.
    Zhao W.
    Shi X.
    Zhang J.
    Yang Y.
    Zhang Y.
    Journal of Railway Science and Engineering, 2023, 20 (07) : 2500 - 2508