Case Study of Remodelling the As-Built Documentation of a Railway Construction into the BIM and GIS Environment

被引:2
|
作者
Bartonek, Dalibor [1 ]
Bures, Jiri [1 ]
Vystavel, Ondrej [1 ]
Havlicek, Radomir [2 ]
机构
[1] Brno Univ Technol, Inst Geodesy, Fac Civil Engn, Veveri 331-95, Brno 60200, Czech Republic
[2] State Org, Railway Adm, Dlazdena 1003-7, Prague 11000, Czech Republic
来源
APPLIED SCIENCES-BASEL | 2023年 / 13卷 / 09期
关键词
BIM; CDE; GIS; remodelling; as-built documentation; railway station; MANAGEMENT; DESIGN; MODEL;
D O I
10.3390/app13095591
中图分类号
O6 [化学];
学科分类号
0703 ;
摘要
Building Information Modelling (BIM) is a modern approach to managing the process of preparation, realization and operation of building objects including their documentation throughout their life cycle, based on database agenda platform. The aim of our research is to analyze and innovate existing engineering procedures with the aim: 1. to remodel the existing CAD documentation into BIM for the purpose of public procurement, 2. to provide guaranteed data to the IS of the Digital Map of Public Administration and 3. to provide data for the design of new railway structures or their reconstruction. The aim of the case study was to evaluate the effectiveness of remodelling the existing as-built documentation of a railway construction into a common BIM data environment (CDE), in which further subsequent construction agenda should be managed for the remaining period of its life cycle. Using the documentation for construction realization of the railway station Sumice, this 3D documentation was remodeled into the BIM data environment CDE and alternatively also into the 2D GIS environment. The BIM data standard developed by the State Fund for Transport Infrastructure was analyzed during the documentation reworking. An important parameter of the documentation rework was the use of a geodetic reference system fully compatible with the cadastral system in the Czech Republic. It turned out that the general data standard is only partially applicable for railway structures containing many special objects and many objects requiring individual classification. The remodelling of existing graphical data proved faster and more efficient in a GIS environment (layer oriented) compared to the need for 3D remodelling in a BIM CDE (object oriented). Experimental results have demonstrated the effectiveness of remodelling underground technical infrastructure objects, while the visible surface situation is often more effectively captured by current progressive bulk data acquisition technologies. In a CDE environment, existing as-built documentation data can be efficiently stored and administered and progressively, for the procurement and execution of construction, purposefully remodeled only to the extent required in BIM or converted into an exchangeable Digital Technical Map (DTM) format for public administration.
引用
收藏
页数:26
相关论文
共 50 条
  • [21] Imaging-based thermal modelling and reverse engineering of as-built automotive components: A case study
    Sukumar, Sreenivas R.
    Govindasamy, Priya
    Koschan, Andreas F.
    Page, David L.
    Abidi, Mongi A.
    VIRTUAL AND PHYSICAL PROTOTYPING, 2010, 5 (01) : 21 - 32
  • [22] Lean Construction and BIM in the Value Chain of a Construction Company: A Case Study
    Osorio-Gomez, Cristian-Camilo
    Moreno-Falla, Maria-Jose
    Ospina-Alvarado, Angelica
    Ponz-Tienda, Jose-Luis
    CONSTRUCTION RESEARCH CONGRESS 2020: PROJECT MANAGEMENT AND CONTROLS, MATERIALS, AND CONTRACTS, 2020, : 368 - 378
  • [23] Adaptive Design of Formworks for Building Renovation Considering the Sustainability of Construction in BIM Environment-Case Study
    Mesaros, Peter
    Spisakova, Marcela
    Mandicak, Tomas
    Cabala, Jozef
    Oravec, Milan M.
    SUSTAINABILITY, 2021, 13 (02) : 1 - 20
  • [24] The built environment and asthma: Los Angeles case study
    Yonsu Kim
    John Cho
    Frank Wen
    Simon Choi
    Journal of Public Health, 2023, 31 : 57 - 64
  • [25] The built environment and asthma: Los Angeles case study
    Kim, Yonsu
    Cho, John
    Wen, Frank
    Choi, Simon
    JOURNAL OF PUBLIC HEALTH-HEIDELBERG, 2023, 31 (01): : 57 - 64
  • [26] Multi-Building Extraction and Alignment for As-Built Point Clouds: A Case Study With Crane Cameras
    Masood, Mustafa K.
    Aikala, Antti
    Seppanen, Olli
    Singh, Vishal
    FRONTIERS IN BUILT ENVIRONMENT, 2020, 6
  • [27] DISCOURSE AND POWER IN CONSTRUCTION OF THE BUILT ENVIRONMENT. The southeastern hills in Bogota case
    Paola Rico, Gina
    BITACORA URBANO TERRITORIAL, 2011, 19 (02): : 123 - 136
  • [28] Developing systems-centric as-built BIMs to support facility emergency management: A case study approach
    Ensafi, Mahnaz
    Harode, Ashit
    Thabet, Walid
    AUTOMATION IN CONSTRUCTION, 2022, 133
  • [29] Case Study on Disaster Prevention and Rescue for Railway Construction Project
    Shiau Yan-Chyuan
    Song Shu-Jen
    Hsu Wei-Chung
    DISASTER ADVANCES, 2012, 5 (04): : 150 - 156
  • [30] Driveway runover, the influence of the built environment: A case control study
    Shepherd, Michael
    Austin, Patricia
    Chambers, Julie
    JOURNAL OF PAEDIATRICS AND CHILD HEALTH, 2010, 46 (12) : 760 - 767