Integrated planning of berth allocation, quay crane assignment and yard assignment in multiple cooperative terminals

被引:0
|
作者
Guo, Liming [1 ]
Zheng, Jianfeng [1 ]
Du, Jian [2 ]
Gao, Ziyou [3 ]
Fagerholt, Kjetil [4 ]
机构
[1] Dalian Maritime Univ, Transportat Engn Coll, Dalian, Peoples R China
[2] Dalian Jiaotong Univ, Sch Traff & Transportat Engn, Dalian, Peoples R China
[3] Beijing Jiaotong Univ, Sch Traff & Transportat, Beijing, Peoples R China
[4] Norwegian Univ Sci & Technol, Dept Ind Econ & Technol Management, Trondheim, Norway
关键词
Berth allocation; Yard assignment; Quay crane assignment; Terminal cooperation; Adaptive large neighborhood search; LARGE NEIGHBORHOOD SEARCH; TRANSSHIPMENT TERMINALS; SPEED OPTIMIZATION; TEMPLATE DESIGN; CONTAINER; MANAGEMENT; SEAPORT; MODEL;
D O I
10.1016/j.tre.2024.103456
中图分类号
F [经济];
学科分类号
02 ;
摘要
To further enhance the service level of a transshipment container port, this work considers terminal cooperation in terms of shore-side and yard-side resource sharing. This work proposes an integrated berth allocation, quay crane assignment and yard assignment problem in multiple cooperative terminals. In the proposed problem, container flow movements are classified into three types, i.e., import, export and transshipment containers, within a terminal and between terminals. A mixed integer nonlinear programming model is proposed for the proposed problem, aiming to minimize the total operating costs at all terminals considered. To address real-size instances, a tailored adaptive large neighborhood search (ALNS) embedded with column generation and CPLEX is proposed. Numerical experiments on different problem scales are provided to assess the proposed model and the proposed ALNS. Numerical experiments show that, i) the proposed algorithm can solve the instances with 4 terminals and 100 arriving vessels in less than 3 min; ii) compared with the two models without considering port cooperation and integrated optimization, the cost reduction obtained by our model is up to 14.02% and 22.00%, respectively.
引用
收藏
页数:31
相关论文
共 50 条
  • [1] Column Generation for the Integrated Berth Allocation, Quay Crane Assignment, and Yard Assignment Problem
    Wang, Kai
    Zhen, Lu
    Wang, Shuaian
    Laporte, Gilbert
    [J]. TRANSPORTATION SCIENCE, 2018, 52 (04) : 812 - 834
  • [2] An Exact Algorithm for the Integrated Planning of Berth Allocation and Quay Crane Assignment
    Vacca, Ilaria
    Salani, Matteo
    Bierlaire, Michel
    [J]. TRANSPORTATION SCIENCE, 2013, 47 (02) : 148 - 161
  • [3] Integrated berth allocation and quay crane assignment with maintenance activities
    Zheng, Feifeng
    Li, Ying
    Chu, Feng
    Liu, Ming
    Xu, Yinfeng
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2019, 57 (11) : 3478 - 3503
  • [4] An integrated method for berth allocation and quay crane assignment to allow for reassignment of vessels to other terminals
    Cho, Sung Won
    Park, Hyun Ji
    Lee, Chulung
    [J]. MARITIME ECONOMICS & LOGISTICS, 2021, 23 (01) : 123 - 153
  • [5] An integrated method for berth allocation and quay crane assignment to allow for reassignment of vessels to other terminals
    Sung Won Cho
    Hyun Ji Park
    Chulung Lee
    [J]. Maritime Economics & Logistics, 2021, 23 : 123 - 153
  • [6] Simultaneous Optimization of Berth Allocation, Quay Crane Assignment and Quay Crane Scheduling Problems in Container Terminals
    Aras, Necati
    Turkogullari, Yavuz
    Taskin, Z. Caner
    Altinel, Kuban
    [J]. OPERATIONS RESEARCH PROCEEDINGS 2012, 2014, : 101 - 107
  • [7] Robust optimization for the integrated berth allocation and quay crane assignment problem
    Wang, Chong
    Miao, Lixin
    Zhang, Canrong
    Wu, Tao
    Liang, Zhe
    [J]. NAVAL RESEARCH LOGISTICS, 2024, 71 (03) : 452 - 476
  • [8] The Integrated Rescheduling Problem of Berth Allocation and Quay Crane Assignment with Uncertainty
    Zheng, Hongxing
    Wang, Zhaoyang
    Liu, Hong
    [J]. PROCESSES, 2023, 11 (02)
  • [9] Integrated berth allocation and quay crane assignment with uncertain maintenance activities
    Li, Ying
    Chu, Feng
    Zheng, Feifeng
    Kacem, Imed
    [J]. PROCEEDINGS OF THE 2019 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND SYSTEMS MANAGEMENT (IESM 2019), 2019, : 248 - 253
  • [10] A fast approach for the integrated berth allocation and quay crane assignment problem
    Ma, H. L.
    Chan, Felix T. S.
    Chung, S. H.
    [J]. PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART B-JOURNAL OF ENGINEERING MANUFACTURE, 2015, 229 (11) : 2076 - 2087