Research and Practice of Full Plugging Groundwater Technology in Water-Rich TBM Diversion Tunnel

被引:0
|
作者
Wang, Lichuan [1 ,2 ,6 ]
Zhang, Shuai [1 ]
Zhou, Zongqing [2 ]
Wu, Jian [3 ]
Bai, Tao [4 ]
Chen, Yunjuan [2 ,5 ]
Zhao, Jingbo [1 ]
Xu, Shuo [6 ]
机构
[1] China Railway 18th Bur Grp Co Ltd, Tianjin 300022, Peoples R China
[2] Shandong Univ, Sch Qilu Transportat, Jinan 250002, Shandong, Peoples R China
[3] China Railway Southwest Res Inst Co Ltd, Chengdu 611731, Sichuan, Peoples R China
[4] China Railway 18th Bur Grp Tunnel Engn Co Ltd, Chongqing 400700, Peoples R China
[5] Shandong Jianzhu Univ, Sch Civil Engn, Jinan 250101, Shandong, Peoples R China
[6] Cent South Univ, Sch Civil Engn, Changsha 410075, Hunan, Peoples R China
基金
中国国家自然科学基金;
关键词
Water-rich fissure; Grouting scheme; Full plugging groundwater technology; Field test; Numerical modeling;
D O I
10.1007/s12205-023-2468-8
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
To solve the problem of water discharge in the tunnel when the tunnel passes through the low-pressure water-rich fractured stratum, the grouting plugging technology of the low-pressure water-rich tunnel is studied. The grouting plugging scheme is optimized through the field test. The post-validation research is numerically simulated and the parameters of the complete sealing grouting ring are analyzed. The results show that: 1) Full plugging grouting can effectively improve the funnel effect of precipitation with good water plugging effect. With the decrease of the permeability coefficient and the increase of the thickness of the grouting ring, the flow velocity around the tunnel and the water discharge in the tunnel both decreased significantly, with a trend of "rapidly decreasing-slowly decreasing". Considering various factors, an optimal grouting ring thickness between 1.5 m and 2.5 m and a reasonable range for permeability coefficient between 2.07 x 10-6 cm/s and 4.14 x 10-6 cm/s are considered appropriate. 2) The use of cement-water glass system full plugging grouting for water plugging, can significantly reduce the discharge of water, only partial dripping or even dripping state. Using polyurethane foam single point method to systematically block grouting and water plugging can only changes the discharge path and hardly attenuates water discharge.
引用
收藏
页码:617 / 627
页数:11
相关论文
共 50 条
  • [21] The Pipe-Roof Grouting Method in the Tunnel Water-Rich Slice Excavation Reinforcement Effectiveness Research
    Zhao Licai
    COMPUTER-AIDED DESIGN, MANUFACTURING, MODELING AND SIMULATION III, 2014, 443 : 90 - 95
  • [22] Soil arching due to leaking of tunnel buried in water-rich sand
    Long, Ying-Ying
    Tan, Yong
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2020, 95
  • [23] Discussion of the modification plan of the EPB TBM applied in a water-rich cobblestone stratum in Chengdu
    Wang, Guoyi
    Modern Tunnelling Technology, 2013, 50 (01) : 34 - 39
  • [24] Study on Soil Improvement of TBM'S Commencement and Arrival in Water-rich Sand Stratum
    Jiang, Hua
    Jiang, Yusheng
    Huang, Maolan
    Chen, Zhiqiang
    ADVANCES IN CIVIL ENGINEERING, PTS 1-4, 2011, 90-93 : 2119 - +
  • [25] Microseismic monitoring and experimental study on rockburst in water-rich area of tunnel
    Tang, Shibin
    Li, Jiaming
    Tang, Liexian
    Zhang, Leitao
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2023, 141
  • [26] Seepage-Stress Coupling Analysis of Water-Rich Loess Tunnel
    Sun, Zhijie
    Zhang, Jun
    Su, Zhongming
    Xue, Xiaohui
    PROCEEDINGS OF THE 2015 4TH INTERNATIONAL CONFERENCE ON SENSORS, MEASUREMENT AND INTELLIGENT MATERIALS, 2016, 43 : 1187 - 1190
  • [27] Research on the Dewatering Technology in Trapped Area of Shield Launching Shaft for Water-rich Sand Stratum
    Xiong, Zhongmin
    Qin, Zehong
    Zhang, Ziguang
    Cai, Hong
    Journal of Railway Engineering Society, 2022, 39 (01): : 114 - 120
  • [28] Water control of water-rich deeply buried tunnel: an analytical model of a combined scheme
    Luo, Xiongwen
    Yu, Chenyun
    Wang, Yaze
    GEOTECHNICAL AND GEOLOGICAL ENGINEERING, 2023, 41 (07) : 3909 - 3922
  • [29] Water control of water-rich deeply buried tunnel: an analytical model of a combined scheme
    Xiongwen Luo
    Chenyun Yu
    Yaze Wang
    Geotechnical and Geological Engineering, 2023, 41 : 3909 - 3922
  • [30] THE IMPACT RESEARCH OF THE HIGH-PRESSURE WATER-RICH KARST ON THE TUNNEL CONSTRUCTION IN YICHANG-WANZHOU RAILWAY
    Kuang Xing
    Bai Mingzhou
    Wang Chengliang
    PROCEEDINGS OF THE 12TH INTERNATIONAL CONFERENCE ON INSPECTION APPRAISAL REPAIRS AND MAINTENANCE OF STRUCTURES, VOLS 1 AND 2, 2010, : 545 - 549