Time-dependent reliability analysis of corroded RC beams based on the phase- type fitting method

被引:3
|
作者
Li, Junxiang [1 ,2 ]
Chen, Jianqiao [3 ,4 ]
Zhang, Xinxin [1 ,2 ]
Wu, Zijun [1 ,2 ]
机构
[1] Wuhan Text Univ, Hubei Key Lab Digital Text Equipment, Wuhan, Peoples R China
[2] Wuhan Text Univ, Sch Mech Engn & Automation, Wuhan, Peoples R China
[3] Huazhong Univ Sci & Technol, Dept Mech, Wuhan, Peoples R China
[4] Huazhong Univ Sci & Technol, Hubei Key Lab Engn Struct Anal & Safety Assessment, Wuhan, Peoples R China
基金
中国国家自然科学基金;
关键词
chloride penetration; uncertainties; time-dependent reliability analysis; PH fitting method; corroded reinforced concrete beams; CHLORIDE-INDUCED CORROSION; CONCRETE STRUCTURES; SERVICE-LIFE; MODEL; HETEROGENEITY; PENETRATION; PREDICTION; ALGORITHM; DIFFUSION; 1ST;
D O I
10.17531/ein/172442
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
It remains an important challenge to quantitatively describe the corrosion of reinforced concrete (RC) structures under chloride penetration. When considering the uncertainties encountered throughout the life cycle of RC structures exposed to a corrosive environment and evaluating their safety and reliability, the complexity of the problem intensifies. To address these issues, this paper focuses on the time dependent reliability analysis of corroded RC beams, utilizing the phase type (PH) fitting method. Initially, a model for the time-dependent reliability of corroded RC beams is established, incorporating the time dependent chloride diffusion coefficient. Subsequently, a novel PH fitting method is proposed. The effectiveness of this new method is demonstrated through numerical examples. Furthermore, the time dependent reliability analysis of corroded RC beams is compared using both the PH fitting method and the Monte Carlo simulation. The results reveal that the proposed method can accurately and efficiently deal with time-dependent reliability problems.
引用
收藏
页数:18
相关论文
共 50 条
  • [31] A time-dependent reliability analysis method for bearing lubrication
    Tao, YouRui
    Liang, BoWen
    Zhang, Jianhua
    STRUCTURAL AND MULTIDISCIPLINARY OPTIMIZATION, 2020, 61 (05) : 2125 - 2134
  • [32] A time-dependent reliability analysis method for bearing lubrication
    YouRui Tao
    BoWen Liang
    Jianhua Zhang
    Structural and Multidisciplinary Optimization, 2020, 61 : 2125 - 2134
  • [33] Time-dependent Reliability Analysis of Timber-Concrete Composite Beams
    Velimirovic, Nikola
    Stojic, Dragoslav
    Djordjevic, Miodrag
    Toplicic-Curcic, Gordana
    PERIODICA POLYTECHNICA-CIVIL ENGINEERING, 2017, 61 (04): : 718 - 726
  • [34] Time-dependent stress-strength reliability models based on phase type distribution
    Jose, Joby K.
    Drisya, M.
    COMPUTATIONAL STATISTICS, 2020, 35 (03) : 1345 - 1371
  • [35] Modified Time-Dependent Model for Flexural Capacity Assessment of Corroded RC Elements
    Behrouz Akbarian Reshvanlou
    Kiarash Nasserasadi
    Jamal Ahmadi
    KSCE Journal of Civil Engineering, 2021, 25 : 3897 - 3910
  • [36] Modified Time-Dependent Model for Flexural Capacity Assessment of Corroded RC Elements
    Reshvanlou, Behrouz Akbarian
    Nasserasadi, Kiarash
    Ahmadi, Jamal
    KSCE JOURNAL OF CIVIL ENGINEERING, 2021, 25 (10) : 3897 - 3910
  • [37] Time-dependent Load bearing Capacity of Corroded RC Columns in Atmosphere Environment
    Li Qiang
    Jin Nanguo
    Jin Xianyu
    INTELLIGENT STRUCTURE AND VIBRATION CONTROL, PTS 1 AND 2, 2011, 50-51 : 859 - 863
  • [38] Time-Dependent Reliability Analysis of Existing Tunnel Structures Based on the Bayesian Method
    Guo, Jian
    ADVANCES IN STRUCTURES, PTS 1-5, 2011, 163-167 : 3180 - 3185
  • [39] Time-dependent reliability analysis method based on ARBIS and Kriging surrogate model
    Liu, Huan
    He, Xindang
    Wang, Pan
    Lu, Zhenzhou
    Yue, Zhufeng
    ENGINEERING WITH COMPUTERS, 2023, 39 (03) : 2035 - 2048
  • [40] Time-dependent reliability analysis method based on ARBIS and Kriging surrogate model
    Huan Liu
    Xindang He
    Pan Wang
    Zhenzhou Lu
    Zhufeng Yue
    Engineering with Computers, 2023, 39 : 2035 - 2048