Static and dynamic fuzzy assessment methods for the collapse risk of mountain tunnel construction

被引:2
|
作者
Huang, Zhen [1 ,2 ]
Gao, Feng [1 ,2 ]
Li, Xuesong [3 ]
Jiang, Min [3 ]
机构
[1] Guangxi Univ, Sch Civil Engn & Architecture, Nanning, Guangxi, Peoples R China
[2] Guangxi Univ, State Key Lab Featured Met Mat & Life Cycle Safe, Nanning, Peoples R China
[3] Guangxi Rd Construct Engn Grp Co Ltd, Nanning, Guangxi, Peoples R China
关键词
Mountain tunnel; collapse; risk assessment; VIKOR method; DEMATEL method; Uncertainty analysis; DECISION-ANALYSIS; VIKOR;
D O I
10.3233/JIFS-233149
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
The static risk assessment method has difficulty tracking variations of the risk level, which is not conducive to the dynamic control of construction. Tunnel collapse during the construction of mountain tunnels has a dynamic evolution law and contains great risk of harm, and the corresponding dynamic risk assessment is extremely important. This study proposes a static and dynamic fuzzy uncertainty assessment method for the collapse risk of mountain tunnels. First, 150 tunnel collapse accidents were investigated and analysed, and the static and dynamic risk assessment index system of mountain tunnel construction collapse was established. Second, the DEMATEL method is processed by applying fuzzy logic, the subjective weight of each index is calculated, and the interaction between the indexes is analysed. Finally, the traditional VIKOR method is improved upon, and the weight of each assessment index is coupled and analysed. A static and dynamic uncertainty assessment model of the construction collapse risk of multiple construction sections is constructed. This method has been successfully applied to the risk assessment of tunnel collapse, and the assessment results are consistent with the actual construction situation. This study provides a new method for the static and dynamic assessment of mountain tunnel collapse risk.
引用
收藏
页码:7975 / 7999
页数:25
相关论文
共 50 条
  • [41] Risk assessment of high-speed railway tunnel construction based on fuzzy synthetic evaluation
    Wu, Li
    Zhang, Lianggang
    Lai, Yun
    Chen, Jian
    ADVANCES IN INDUSTRIAL AND CIVIL ENGINEERING, PTS 1-4, 2012, 594-597 : 1251 - 1256
  • [42] A Comprehensive Assessment Method for Safety Risk of Gas Tunnel Construction Based on Fuzzy Bayesian Network
    Qiu, Daohong
    Qu, Cong
    Xue, Yiguo
    Zhou, Binghua
    Li, Xin
    Ma, Xinmin
    Cui, Jiuhua
    POLISH JOURNAL OF ENVIRONMENTAL STUDIES, 2020, 29 (06): : 4269 - 4289
  • [43] Dynamic numerical simulation and risk predictive assessment of the slope debris flow for the rear mountain at the management office of the Erlang Mountain Tunnel
    Wang, Hao
    Dai, Lin
    Pan, Deng
    Yue, Jianwei
    Fu, Dewei
    Yan, Tiantian
    FRONTIERS IN EARTH SCIENCE, 2022, 10
  • [44] Groundwater environmental effects risk evaluation in mountain tunnel construction: A dynamic decision support system based on fuzzy two-dimensional cloud probability model
    Sun, Huaiyuan
    Le, Ling
    Dai, Yiming
    Rui, Yi
    Zhu, Hehua
    Li, Xiaojun
    Li, Xuhui
    Xue, Guangwen
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2025, 156
  • [45] Risk assessment and management of Xuefeng Mountain Tunnel No.1
    Xu, Z.-L., 1600, Editorial Department of Journal of Railway Engineering Society, China (31):
  • [46] Fuzzy Assessment Model Research on Safety Condition of Tunnel Construction
    Wang, Ning
    Chen, Mingzhang
    Zhao, Yucheng
    THEORY AND PRACTICE OF RISK ANALYSIS AND CRISIS RESPONSE, PROCEEDINGS, 2008, : 187 - 192
  • [47] Fuzzy Comprehensive Evaluation of Collapse Risk in Mountain Tunnels Based on Game Theory
    Zheng, Weiqiang
    Xu, Shixiang
    Wang, Zecheng
    APPLIED SCIENCES-BASEL, 2024, 14 (12):
  • [48] Collapse Disaster Risk Assessment of Changbai Mountain Region Based on GIS
    Han, Lina
    Zhang, Jiquan
    Zhang, Yichen
    Tong, Zhijun
    Alu, Si
    Ma, Qing
    PROCEEDINGS OF THE 8TH ANNUAL MEETING OF RISK ANALYSIS COUNCIL OF CHINA ASSOCIATION FOR DISASTER PREVENTION (RAC 2018), 2018, 66 : 171 - 176
  • [49] A fuzzy approach to construction project risk assessment
    Nieto-Morote, A.
    Ruz-Vila, F.
    INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2011, 29 (02) : 220 - 231
  • [50] Risk assessment of construction for Bohai Bay subsea tunnel
    Zhang, Yonggang
    Wang, Yonghong
    Wang, Mengshu
    Tumu Gongcheng Xuebao/China Civil Engineering Journal, 2015, 48 : 414 - 418