Static and dynamic fuzzy assessment methods for the collapse risk of mountain tunnel construction

被引:1
|
作者
Huang, Zhen [1 ,2 ]
Gao, Feng [1 ,2 ]
Li, Xuesong [3 ]
Jiang, Min [3 ]
机构
[1] Guangxi Univ, Sch Civil Engn & Architecture, Nanning, Guangxi, Peoples R China
[2] Guangxi Univ, State Key Lab Featured Met Mat & Life Cycle Safe, Nanning, Peoples R China
[3] Guangxi Rd Construct Engn Grp Co Ltd, Nanning, Guangxi, Peoples R China
关键词
Mountain tunnel; collapse; risk assessment; VIKOR method; DEMATEL method; Uncertainty analysis; DECISION-ANALYSIS; VIKOR;
D O I
10.3233/JIFS-233149
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
The static risk assessment method has difficulty tracking variations of the risk level, which is not conducive to the dynamic control of construction. Tunnel collapse during the construction of mountain tunnels has a dynamic evolution law and contains great risk of harm, and the corresponding dynamic risk assessment is extremely important. This study proposes a static and dynamic fuzzy uncertainty assessment method for the collapse risk of mountain tunnels. First, 150 tunnel collapse accidents were investigated and analysed, and the static and dynamic risk assessment index system of mountain tunnel construction collapse was established. Second, the DEMATEL method is processed by applying fuzzy logic, the subjective weight of each index is calculated, and the interaction between the indexes is analysed. Finally, the traditional VIKOR method is improved upon, and the weight of each assessment index is coupled and analysed. A static and dynamic uncertainty assessment model of the construction collapse risk of multiple construction sections is constructed. This method has been successfully applied to the risk assessment of tunnel collapse, and the assessment results are consistent with the actual construction situation. This study provides a new method for the static and dynamic assessment of mountain tunnel collapse risk.
引用
下载
收藏
页码:7975 / 7999
页数:25
相关论文
共 50 条
  • [1] Fuzzy analytic hierarchy process for risk evaluation of collapse during construction of mountain tunnel
    Chen, Jie-Jin
    Zhou, Feng
    Yang, Jun-Sheng
    Liu, Bao-Chen
    Yantu Lixue/Rock and Soil Mechanics, 2009, 30 (08): : 2365 - 2370
  • [2] Fuzzy analytic hierarchy process for risk evaluation of collapse during construction of mountain tunnel
    Chen Jie-jin
    Zhou Feng
    Yang Jun-sheng
    Liu Bao-chen
    ROCK AND SOIL MECHANICS, 2009, 30 (08) : 2365 - 2370
  • [3] Dynamic Risk Forecasting Based on Deep Learning and Collapse Risk Comprehensive Evaluation of Mountain Tunnel Portal Construction
    Lin, Kun
    Sun, Yazhen
    Wang, Jinchang
    Zhu, Fengbin
    Wang, Longyan
    ARABIAN JOURNAL FOR SCIENCE AND ENGINEERING, 2024,
  • [4] Analytical model for assessing collapse risk during mountain tunnel construction
    Zhang, Guo-Hua
    Jiao, Yu-Yong
    Chen, Li-Biao
    Wang, Hao
    Li, Shu-Cai
    CANADIAN GEOTECHNICAL JOURNAL, 2016, 53 (02) : 326 - 342
  • [5] Risk Assessment of a Tunnel Collapse in a Mountain Tunnel Based on the Attribute Synthetic Evaluation System
    Wang, Benshuo
    Li, Shucai
    Zhang, Qianqing
    Li, Liping
    Zhang, Qian
    Xu, Fei
    GEO-CHINA 2016: EMERGING TECHNOLOGIES IN TUNNEL ENGINEERING, MODELING, DESIGN, CONSTRUCTION, REPAIR, AND REHABILITATION, 2016, (260): : 198 - 209
  • [6] Theoretical System for the Safety Risk Assessment of Mountain Tunnel Construction
    Xue Y.
    Dong H.
    Li Y.
    Tianjin Daxue Xuebao (Ziran Kexue yu Gongcheng Jishu Ban)/Journal of Tianjin University Science and Technology, 2019, 52 : 84 - 91
  • [7] Dynamic Risk Assessment Method of Collapse in Mountain Tunnels and Application
    Wang, Sheng
    Li, Li-ping
    Shi, Shaoshuai
    Cheng, Shuai
    Hu, Huijiang
    Wen, Tao
    GEOTECHNICAL AND GEOLOGICAL ENGINEERING, 2020, 38 (03) : 2913 - 2926
  • [8] Dynamic Risk Assessment of Karst Tunnel Collapse Based on Fuzzy-AHP: A Case Study of the LianHuaShan Tunnel, China
    Yu, Yongyan
    He, Xiaobin
    Wan, Fei
    Bai, Zhe
    Fu, Chongtao
    ADVANCES IN CIVIL ENGINEERING, 2022, 2022
  • [9] Dynamic Risk Assessment Method of Collapse in Mountain Tunnels and Application
    Sheng Wang
    Li-ping Li
    Shaoshuai Shi
    Shuai Cheng
    Huijiang Hu
    Tao Wen
    Geotechnical and Geological Engineering, 2020, 38 : 2913 - 2926
  • [10] A static risk assessment model for underwater shield tunnel construction
    Wu, Zhiqiang
    Zou, Shuliang
    SADHANA-ACADEMY PROCEEDINGS IN ENGINEERING SCIENCES, 2020, 45 (01):