共 50 条
- [31] APPLICATION OF COMPLEX APPROACH TO INCREASING SOCIOECONOMIC EFFECTIVENESS OF WORKING TEAMS IN SOCIALIST ORGANIZATIONS - CASE-STUDY [J]. SOCIOLOGICKY CASOPIS, 1977, 13 (06): : 621 - 636
- [32] Teaching and learning using a case study: application to a master degree in construction management [J]. 3RD WORLD CONFERENCE ON EDUCATIONAL SCIENCES - 2011, 2011, 15 : 696 - 702
- [33] MANAGEMENT ACCOUNTING RESEARCH: GUIDELINES FOR USING A HYBRID OF THE GROUNDED THEORY AND CASE STUDY APPROACHES [J]. POLISH JOURNAL OF MANAGEMENT STUDIES, 2019, 19 (01): : 433 - 444
- [34] An experience-based interactive lighting design approach using BIM and VR: a case study [J]. 4TH ASIA CONFERENCE OF INTERNATIONAL BUILDING PERFORMANCE SIMULATION ASSOCIATION, 2019, 238
- [36] Industrial application integration using agent-enabled semantic SOA: CAPNET case study [J]. INFORMATION TECHNOLOGY FOR BALANCED MANUFACTURING SYSTEMS, 2006, 220 : 109 - +
- [38] A Case Study on Impact of Labours Sleep Deprivation in Construction Project using Application Method [J]. 3RD INTERNATIONAL CONFERENCE ON ADVANCES IN MECHANICAL ENGINEERING (ICAME 2020), PTS 1-6, 2020, 912
- [39] APPLICATION OF BIM FOR STRUCTURAL ENGINEERING: A CASE STUDY USING REVIT AND CUSTOMARY STRUCTURAL ANALYSIS AND DESIGN SOFTWARE [J]. JOURNAL OF INFORMATION TECHNOLOGY IN CONSTRUCTION, 2021, 26 : 1009 - 1022