Monitoring processes with multiple dependent production lines using time between events control charts

被引:4
|
作者
Ahmad, Hussam [1 ]
Ahmadi Nadi, Adel [1 ]
Amini, Mohammad [2 ]
Gildeh, Bahram Sadeghpour [2 ]
机构
[1] Ferdowsi Univ Mashhad, Fac Math Sci, Dept Stat, Mashhad, Iran
[2] Ferdowsi Univ Mashhad, Ordered Data Reliabil & Dependency Ctr Excellence, Dept Stat, Mashhad, Iran
关键词
Time between events control chart; EWMA approach; average time to signal; exponential distribution; homogeneous poisson process; MODEL; ALGORITHM;
D O I
10.1080/08982112.2023.2169161
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This article develops Time Between Events (TBE) control charts to monitor processes with multiple dependent production lines. To this end, a Shewhart-type and an EWMA-type TBE chart have been proposed. The copula approach is used to describe the dependence between production lines and the homogeneous Poisson process is considered to model the number of defectives. Performance of the proposed methods is evaluated using average time to signal metric. The numerical study showed that the EWMA-TBE chart uniformly performs better than the Shewhart-type chart. Eventually, the EWMA-TBE chart is applied to monitor two real-world processes with two and four production lines.
引用
收藏
页码:639 / 668
页数:30
相关论文
共 50 条
  • [31] EWMA control charts for monitoring the mean of autocorrelated processes
    Lu, CW
    Reynolds, MR
    JOURNAL OF QUALITY TECHNOLOGY, 1999, 31 (02) : 166 - 188
  • [32] Bayesian Sequential Control Charts for Monitoring Multivariate Processes
    Zhu, H. M.
    Wang, Y. H.
    Hao, L. Y.
    Zeng, Z. F.
    Liu, Z. H.
    2009 IEEE 16TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1 AND 2, PROCEEDINGS, 2009, : 1093 - +
  • [33] EWMA Control Charts for Monitoring High Yield Processes
    Mavroudis, Eleftheriou
    Nicolas, Farmakis
    COMMUNICATIONS IN STATISTICS-THEORY AND METHODS, 2013, 42 (20) : 3639 - 3654
  • [34] A Guideline to Select Control Charts For Multiple Stream Processes Control
    Jirasettapong, Prapasak
    Rojanarowan, Napassavong
    ENGINEERING JOURNAL-THAILAND, 2011, 15 (03): : 1 - 14
  • [35] On control charts for monitoring the variance of a time series
    Lazariv, Taras
    Schmid, Wolfgang
    Zabolotska, Svitlana
    JOURNAL OF STATISTICAL PLANNING AND INFERENCE, 2013, 143 (09) : 1512 - 1526
  • [36] Evaluation of Shewhart time-between-events-and-amplitude control charts for correlated data
    Rahali, Dorra
    Castagliola, Philippe
    Taleb, Hassen
    Khoo, Michael Boon Chong
    QUALITY AND RELIABILITY ENGINEERING INTERNATIONAL, 2021, 37 (01) : 219 - 241
  • [38] Evaluation of Shewhart time-between-events-and-amplitude control charts for several distributions
    Rahali, Dorra
    Castagliola, Philippe
    Taleb, Hassen
    Khoo, Michael B. C.
    QUALITY ENGINEERING, 2019, 31 (02) : 240 - 254
  • [39] A progressive mean control chart for monitoring time between events
    Alevizakos, Vasileios
    Koukouvinos, Christos
    QUALITY AND RELIABILITY ENGINEERING INTERNATIONAL, 2020, 36 (01) : 161 - 186
  • [40] Phase I control charts for times between events
    Jones, LA
    Champ, CW
    QUALITY AND RELIABILITY ENGINEERING INTERNATIONAL, 2002, 18 (06) : 479 - 488