Monitoring processes with multiple dependent production lines using time between events control charts

被引:4
|
作者
Ahmad, Hussam [1 ]
Ahmadi Nadi, Adel [1 ]
Amini, Mohammad [2 ]
Gildeh, Bahram Sadeghpour [2 ]
机构
[1] Ferdowsi Univ Mashhad, Fac Math Sci, Dept Stat, Mashhad, Iran
[2] Ferdowsi Univ Mashhad, Ordered Data Reliabil & Dependency Ctr Excellence, Dept Stat, Mashhad, Iran
关键词
Time between events control chart; EWMA approach; average time to signal; exponential distribution; homogeneous poisson process; MODEL; ALGORITHM;
D O I
10.1080/08982112.2023.2169161
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This article develops Time Between Events (TBE) control charts to monitor processes with multiple dependent production lines. To this end, a Shewhart-type and an EWMA-type TBE chart have been proposed. The copula approach is used to describe the dependence between production lines and the homogeneous Poisson process is considered to model the number of defectives. Performance of the proposed methods is evaluated using average time to signal metric. The numerical study showed that the EWMA-TBE chart uniformly performs better than the Shewhart-type chart. Eventually, the EWMA-TBE chart is applied to monitor two real-world processes with two and four production lines.
引用
收藏
页码:639 / 668
页数:30
相关论文
共 50 条
  • [1] Synthetic-Type Control Charts for Time-Between-Events Monitoring
    Yen, Fang Yen
    Chong, Khoo Michael Boon
    Ha, Lee Ming
    PLOS ONE, 2013, 8 (06):
  • [2] Cumulative quantity control charts for monitoring production processes
    Chan, LY
    Xie, M
    Goh, TN
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2000, 38 (02) : 397 - 408
  • [3] ATTRIBUTE CONTROL CHARTS FOR MARKOV DEPENDENT PRODUCTION PROCESSES
    BHAT, UN
    LAL, R
    IIE TRANSACTIONS, 1990, 22 (02) : 181 - 188
  • [4] Monitoring of location and dispersion parameters of production processes using hybrid control charts
    Czabak-Gorska, Izabela D.
    Fraczek, Daniel
    Kucinska-Landwojtowicz, Aneta
    Lorenc, Marcin
    Rzasa, Mariusz
    Czabak, Mariusz
    COMPUTERS & INDUSTRIAL ENGINEERING, 2021, 162
  • [5] Cumulative Sum Control Charts for Monitoring Weibull-distributed Time Between Events
    Shafae, Mohammed S.
    Dickinson, Rebecca M.
    Woodall, William H.
    Camelio, Jaime A.
    QUALITY AND RELIABILITY ENGINEERING INTERNATIONAL, 2015, 31 (05) : 839 - 849
  • [6] One-Sided Modified EWMA Control Charts for Monitoring Time Between Events
    Niaz, Attiya
    Khan, Majid
    Ijaz, Muhammad
    QUALITY AND RELIABILITY ENGINEERING INTERNATIONAL, 2025,
  • [7] Time between events control charts for gamma distribution
    Shah, Muhammad Taqi
    Azam, Muhammad
    Aslam, Muhammad
    Sherazi, Uzma
    QUALITY AND RELIABILITY ENGINEERING INTERNATIONAL, 2021, 37 (02) : 785 - 803
  • [8] Economic design of exponential charts for time between events monitoring
    Zhang, CW
    Xie, M
    Goh, TN
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2005, 43 (23) : 5019 - 5032
  • [9] Planning time-between-events Shewhart control charts
    Radaelli, G
    TOTAL QUALITY MANAGEMENT, 1998, 9 (01): : 133 - 140
  • [10] Improved Phase I Control Charts for Monitoring Times Between Events
    Kumar, N.
    Chakraborti, S.
    QUALITY AND RELIABILITY ENGINEERING INTERNATIONAL, 2015, 31 (04) : 659 - 668