A LSTM-based approximate dynamic programming method for hydropower reservoir operation optimization

被引:10
|
作者
Feng, Zhong-kai [1 ,2 ]
Luo, Tao [1 ]
Niu, Wen-jing [3 ]
Yang, Tao [1 ,2 ]
Wang, Wen-chuan [4 ]
机构
[1] Hohai Univ, Coll Hydrol & Water Resources, Nanjing 210098, Peoples R China
[2] Hohai Univ, Natl Key Lab Water Disaster Prevent, Nanjing 210098, Peoples R China
[3] Changjiang Water Resources Commiss, Bur Hydrol, Wuhan 430010, Peoples R China
[4] North China Univ Water Resources & Elect Power, Coll Water Resources, Henan Key Lab Water Resources Conservat & Intens U, Zhengzhou 450046, Peoples R China
基金
中国国家自然科学基金;
关键词
Reservoir operation; Response surface; Artificial intelligence; Dynamic programming; Long short -term memory; Curse of dimensionality; GENETIC ALGORITHM; SYSTEM; RULES; MODEL;
D O I
10.1016/j.jhydrol.2023.130018
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Dynamic programming (DP) is a classical method developed to address the multi-stage hydropower reservoir operation problem, but still suffers from the serious dimensionality problem where the computational burden increases exponentially with the number of state variables. To improve the DP performance, this paper proposes a LSTM-based approximate dynamic programming (ADP) method for complex hydropower reservoir operation optimization. In ADP, the long short-term memory (LSTM) is treated as the response surface model to reduce redundant computations of power outputs in DP's recursive equation, making obvious improvements in the execution efficiency. To fully assess its feasibility, the ADP method is used to find the scheduling schemes of a real-world reservoir system in China. Simulation results show that compared with the standard DP method, ADP effectively reduces the execution time while guarantee the solution quality in different cases. In the 1000-state and wet-year scenario, the ADP method achieves approximately 86.7% and 85.8% reductions in DP's computation time for Longyangxia and Laxiwa reservoir with the goal of maximizing power generation. Thus, the LSTM-based response surface model is an effective tool to improve the DP performance in the hydropower reservoir operation problem.
引用
收藏
页数:14
相关论文
共 50 条
  • [21] Improved Dynamic Programming for Reservoir Operation Optimization with a Concave Objective Function
    Zhao, Tongtiegang
    Cai, Ximing
    Lei, Xiaohui
    Wang, Hao
    JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT, 2012, 138 (06) : 590 - 596
  • [22] Dynamic programming integrated particle swarm optimization algorithm for reservoir operation
    Bilal
    Rani, Deepti
    Pant, Millie
    Jain, S. K.
    INTERNATIONAL JOURNAL OF SYSTEM ASSURANCE ENGINEERING AND MANAGEMENT, 2020, 11 (02) : 515 - 529
  • [23] Peak hydropower plant operation based on stochastic dynamic programming analysis
    Tică, Eliza–Isabela
    Popa, Radu
    UPB Scientific Bulletin, Series D: Mechanical Engineering, 2016, 78 (04): : 191 - 206
  • [24] Dynamic programming integrated particle swarm optimization algorithm for reservoir operation
    Deepti Bilal
    Millie Rani
    S. K. Pant
    International Journal of System Assurance Engineering and Management, 2020, 11 : 515 - 529
  • [25] An Improvement for Cascaded Hydropower Investment Optimization Based on Dynamic Programming
    Wu Zhongqun
    Zhu Taihui
    PROCEEDINGS OF 2009 INTERNATIONAL CONFERENCE OF MANAGEMENT SCIENCE AND INFORMATION SYSTEM, VOLS 1-4, 2009, : 668 - 672
  • [26] Multiobjective Reservoir Operation Optimization Using Improved Multiobjective Dynamic Programming Based on Reference Lines
    He, Zhongzheng
    Zhou, Jianzhong
    Mo, Li
    Qin, Hui
    Xiao, Xiaogang
    Jia, Benjun
    Wang, Chao
    IEEE ACCESS, 2019, 7 : 103473 - 103484
  • [27] Implicit stochastic optimization for hydropower project reservoir operation
    Chen, Yangbo
    Shuili Xuebao/Journal of Hydraulic Engineering, (02): : 26 - 29
  • [28] Optimization of the Weld Pool Boundary Calculated by the LSTM-Based Measurement Method in GTAW
    Liu, Jinping
    Wu, Shaojie
    Feng, Yingchao
    Pan, Guowei
    Chen, Peng
    Yang, Xiaodong
    Yan, Cancan
    METALS, 2022, 12 (08)
  • [29] Optimization of hydropower reservoir operation based on hedging policy using Jaya algorithm
    Chong, Kai Lun
    Lai, Sai Hin
    Ahmed, Ali Najah
    Jaafar, Wan Zurina Wan
    El-Shafie, Ahmed
    APPLIED SOFT COMPUTING, 2021, 106
  • [30] A Cooperative Use of Stochastic Dynamic Programming and Non-Linear Programming for Optimization of Reservoir Operation
    Saadat, Mohsen
    Asghari, Keyvan
    KSCE JOURNAL OF CIVIL ENGINEERING, 2018, 22 (05) : 2035 - 2042