Economic lot sizing problem with tank scheduling

被引:0
|
作者
Onal, Mehmet [1 ]
van den Heuvel, Wilco [2 ]
Dereli, Meryem Merve [1 ]
Albey, Erinc [1 ]
机构
[1] Ozyegin Univ, Dept Ind Engn, Istanbul, Turkiye
[2] Erasmus Univ, Erasmus Sch Econ, Econometr Inst, Rotterdam, Netherlands
关键词
Production; Economic lot sizing; Fermentation tank scheduling; Complexity analysis; ALGORITHMS; MODELS; TIME;
D O I
10.1016/j.ejor.2022.11.016
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
We introduce a multiple-item economic lot sizing problem where items are produced through the fermentation of some raw materials. Fermentation takes place in specialized tanks that have finite capacities, and duration of the fermentation process is item dependent. When fermentation starts, the tanks are not available for the duration of the fermentation process. We analyze the complexity of this problem under various assumptions on the number of items and tanks. In particular, we show that several cases of the problem are (strongly) N P -hard, and we propose polynomial time algorithms to some single item cases. In addition, we propose a quick and simple heuristic approach for one of the multiple item cases. (c) 2022 Elsevier B.V. All rights reserved.
引用
收藏
页码:166 / 182
页数:17
相关论文
共 50 条
  • [41] Lot-sizing and scheduling problem with earliness tardiness and setup penalties
    Supithak, Wisut
    Liman, Surya D.
    Montes, Elliot J.
    COMPUTERS & INDUSTRIAL ENGINEERING, 2010, 58 (03) : 363 - 372
  • [42] Immune Genetic Algorithm for the Capacitated Lot-sizing and Scheduling Problem
    Ma, Jia
    Gao, Liqun
    Shi, Gang
    SEVENTH WUHAN INTERNATIONAL CONFERENCE ON E-BUSINESS, VOLS I-III, 2008, : 1188 - 1194
  • [43] Time-variant lot sizing models for the warehouse scheduling problem
    Hariga, Moncer A.
    Jackson, Peter L.
    IIE Transactions (Institute of Industrial Engineers), 1995, 27 (02): : 162 - 170
  • [44] A Lagrangian heuristic for an integrated lot-sizing and fixed scheduling problem
    Wolosewicz, Cathy
    Dauzere-Peres, Stephane
    Aggoune, Riad
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2015, 244 (01) : 3 - 12
  • [45] Heuristics for the N-product, M-stage, economic lot sizing and scheduling problem with dynamic demand
    Boctor, FF
    Poulin, P
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2005, 43 (13) : 2809 - 2828
  • [46] The impact of batch shipments on the Economic Lot Scheduling Problem
    Beck, Fabian G.
    Glock, Christoph H.
    COMPUTERS & INDUSTRIAL ENGINEERING, 2016, 96 : 126 - 139
  • [47] The economic lot scheduling problem without capacity constraints
    Yao, MJ
    ANNALS OF OPERATIONS RESEARCH, 2005, 133 (1-4) : 193 - 205
  • [48] Simulation optimization for the stochastic economic lot scheduling problem
    Loehndorf, Nils
    Minner, Stefan
    IIE TRANSACTIONS, 2013, 45 (07) : 796 - 810
  • [49] ECONOMIC LOT SCHEDULING FOR 2-PRODUCT PROBLEM
    LEE, CY
    DANUSAPUTRO, S
    IIE TRANSACTIONS, 1989, 21 (02) : 162 - 169
  • [50] THE EFFECT OF EXTERNALIZING SETUPS IN THE ECONOMIC LOT SCHEDULING PROBLEM
    GALLEGO, G
    MOON, I
    OPERATIONS RESEARCH, 1992, 40 (03) : 614 - 619