Study on the Mechanical Characteristics and Ground Surface Settlement Influence of the Rise-Span Ratio of the Pile-Beam-Arch Method

被引:3
|
作者
Lv, Jianbing [1 ]
Lu, Jianjun [1 ]
Wu, Hao [1 ]
机构
[1] Guangdong Univ Technol, Sch Civil & Transportat Engn, Guangzhou 510000, Peoples R China
来源
APPLIED SCIENCES-BASEL | 2023年 / 13卷 / 09期
关键词
subway station; pile-beam-arch method; rise-span ratio; finite element; SUBWAY STATION; METRO STATION; CONSTRUCTION; TUNNEL; STRESS; ROCK; SOIL;
D O I
10.3390/app13095678
中图分类号
O6 [化学];
学科分类号
0703 ;
摘要
The pile-beam-arch method (PBA) method is increasingly being used in the construction of metro stations with complex traffic conditions. The rise-span ratio of the arch not only affects the height of the station, but also affects the rationality of the design of subway stations and the safety of construction. The mechanical response of steel pipe piles with different rise-span ratios and the effect of controlled surface settlement have been investigated in the interactions involved in pile-soil system. In this paper, the finite element model of each rise-span ratio was established, and the rationality of the model was demonstrated by comparing the numerical simulation calculation with the field surface settlement monitoring data. The mechanical characteristics and influence analysis of the surface deformation during the excavation of the cave pile method were investigated. The results show that the maximum axial force of the central pile first decreases and then increases with the increase in the rise-span ratio. The maximum bending moment of the arch decreases as the rise-span ratio increases, and the maximum axial force of the arch is negatively correlated with the rise-span ratio. The maximum axial force of the central pile is located at the bottom plate. Due to the symmetry of the structure, the bending moment of the centre pile is small, but the maximum bending moment of the whole station is located at the side wall of the bottom plate. As the rise-span ratio increases, the surface settlement first decreases and then increases. The construction of the pilot tunnel and the upper arch is the most important factor leading to the surface settlement, so it is necessary to strengthen the soil layer.
引用
收藏
页数:18
相关论文
共 25 条
  • [21] Key Techniques and Risk Management for the Application of the Pile-Beam-Arch (PBA) Excavation Method: A Case Study of the Zhongjie Subway Station
    Guan, Yong-ping
    Zhao, Wen
    Li, Shen-gang
    Zhang, Guo-bin
    SCIENTIFIC WORLD JOURNAL, 2014,
  • [23] Study on the Applicability of an Improved Pile-Beam-Arch Method of Metro Station Construction in the Upper-Soft and Lower-Hard Stratum
    Guo, Xinping
    Jiang, Annan
    Wang, Shanyong
    ADVANCES IN CIVIL ENGINEERING, 2021, 2021
  • [24] Deformation control and countermeasures for construction surface when using pile-beam-arch method in confined water-rich sand cross-stratification
    Xue-Gang, Zhang
    Song, Zhan-Ping
    Yuan, Chi-Yu
    Qu, Jian-Sheng
    Electronic Journal of Geotechnical Engineering, 2014, 19 (0Y): : 8727 - 8739
  • [25] Case Study on Application of an Innovative Method of Pulling Out the Earth Retaining Pile with Less Ground Surface Settlement
    Taoka, Michiho
    Fukubayashi, Yoshinori
    Watanabe, Hiroaki
    Nishi, Yasuhiko
    CLIMATE CHANGE ADAPTATION FROM GEOTECHNICAL PERSPECTIVES, CREST 2023, 2024, 447 : 127 - 135