An exploration of the super-critical speed dynamic behaviours of the pantograph-catenary system

被引:0
|
作者
Wang, Jiangwen [1 ]
Zhang, Weihua [1 ]
Mei, Guiming [1 ]
机构
[1] Southwest Jiaotong Univ, State Key Lab Rail Transit Vehicle Syst, Chengdu, Sichuan Provinc, Peoples R China
关键词
High speed; pantograph-catenary interaction; finite elements < methods; algorithms < mathematical methods; optimisation; OVERHEAD CONTACT LINE; PERFORMANCE;
D O I
10.1080/00423114.2023.2289663
中图分类号
TH [机械、仪表工业];
学科分类号
0802 ;
摘要
The train operating speed is traditionally limited to lower than 0.7 times the critical speed of the catenary. The material's strength limits the tensile forces of the tension wires, preventing the further improvement of the train speed. A novel super-critical speed operating strategy of the pantograph catenary system (PCS) is proposed, using the relatively low tensile values of the catenary to make the pantograph run at a speed ratio larger than 1. The analytical results of a string under a moving load show the theoretical possibility of the super-critical speed operating strategy in moving load problems. The finite element method (FEM) is adopted for the model of the catenary. The differences between the simple catenary and the stitched catenary running at the super-critical speed regime are compared. Then, the tensile forces designation of the stitched catenary with different speed ratio values beyond 400 km/h is studied. Finally, the dynamic behaviours of the PCS reaching the super-critical speed regime are discussed, consisting of the continuous acceleration process and the transition process from the high-tension section to the low-tension section. The proposed super-critical speed operating strategy may be promising for the next-generation high-speed PCS.
引用
收藏
页码:2375 / 2400
页数:26
相关论文
共 50 条
  • [21] Backstepping Controller Design for Pantograph-Catenary System
    Liu, Zhi
    Liu, Yicheng
    Zhou, Ning
    Zou, Dong
    Tu, Haiyan
    3RD INTERNATIONAL CONFERENCE ON AUTOMATION, CONTROL AND ROBOTICS ENGINEERING (CACRE 2018), 2018, 428
  • [22] Hybrid simulation of dynamics for the pantograph-catenary system
    Zhang, WH
    Mei, GM
    Wu, XJ
    Shen, ZY
    VEHICLE SYSTEM DYNAMICS, 2002, 38 (06) : 393 - 414
  • [23] Electrical Prototype Model of Pantograph-Catenary System
    Garg, Rachana
    Mahajan, Priya
    Kumar, Parmod
    Gupta, Vidushi
    2014 IEEE TRANSPORTATION ELECTRIFICATION CONFERENCE AND EXPO (ITEC) ASIA-PACIFIC 2014, 2014,
  • [24] Dynamic Analysis of Pantograph-catenary Arc During the Pantograph Lowering Process
    Hao, Jing
    Gao, Guoqiang
    Wu, Guangning
    2016 IEEE INTERNATIONAL CONFERENCE ON HIGH VOLTAGE ENGINEERING AND APPLICATION (ICHVE), 2016,
  • [25] Surrogate modeling of pantograph-catenary system interactions
    Cheng, Yao
    Yan, JingKe
    Zhang, Fan
    Li, MuDi
    Zhou, Ning
    Shi, ChangJing
    Jin, Bo
    Zhang, WeiHua
    Mechanical Systems and Signal Processing, 2025, 224
  • [26] On the parametric stability of the pantograph-catenary dynamical system
    Migdalovici, M.
    Baran, Daniela
    UPB Scientific Bulletin, Series A: Applied Mathematics and Physics, 2005, 67 (04): : 165 - 172
  • [27] Influence of the aerodynamic forces on the pantograph-catenary system for high-speed trains
    Pombo, J.
    Ambrosio, J.
    Pereira, M.
    Rauter, F.
    Collina, A.
    Facchinetti, A.
    VEHICLE SYSTEM DYNAMICS, 2009, 47 (11) : 1327 - 1347
  • [28] Pantograph-catenary dynamic behavior under cross wind
    Zhang, Wei-Hua, 1600, Chinese Vibration Engineering Society (33):
  • [29] Pantograph-catenary dynamic characteristics of articulated phase insulator
    Shi, Jing
    Yang, Zhipeng
    Zhang, Wenxuan
    Sun, Zhongguo
    Zhongguo Tiedao Kexue/China Railway Science, 2014, 35 (02): : 46 - 51
  • [30] Characteristics of Pantograph-catenary Electro-dynamic Contact Force of High Speed Train
    Liu X.
    Wu J.
    Wei W.
    Gao G.
    Wu G.
    Wei, Wenfu (weiwenfu@126.com), 2018, Science Press (44): : 3770 - 3776