共 12 条
- [1] Simulation-based determination of capacity load factors for master production scheduling [J]. SIMULATION IN PRODUKTION UND LOGISTK 2013, 2013, 316 : 631 - 640
- [2] MASTER PRODUCTION SCHEDULING WITH INTEGRATED ASPECTS OF PERSONNEL PLANNING AND CONSIDERATION OF EMPLOYEE UTILIZATION SPECIFIC PROCESSING TIMES [J]. 32ND EUROPEAN CONFERENCE ON MODELLING AND SIMULATION (ECMS 2018), 2018, : 329 - 335
- [3] Production Scheduling with Capacity-Lot Size and Sequence Consideration [J]. ENGINEERING JOURNAL-THAILAND, 2018, 22 (01): : 93 - 107
- [5] Production and Resource Scheduling in Mass Customization with Dependent Setup Consideration [J]. PROCEEDINGS OF THE 7TH WORLD CONFERENCE ON MASS CUSTOMIZATION, PERSONALIZATION, AND CO-CREATION (MCPC 2014) - TWENTY YEARS OF MASS CUSTOMIZATION - TOWARDS NEW FRONTIERS, 2014, : 461 - 472
- [7] Production Scheduling and Capacity Utilization in Terms of Mass Customized Manufacturing [J]. ADVANCES IN MANUFACTURING II, VOL 2 - PRODUCTION ENGINEERING AND MANAGEMENT, 2019, : 295 - 306
- [8] SCHEDULING IN WORKSHOP PRODUCTION WITH AID OF LOAD DEPENDENT PRODUCTION TRANSIT TIMES [J]. WERKSTATTSTECHNIK ZEITSCHRIFT FUR INDUSTRIELLE FERTIGUNG, 1978, 68 (05): : 297 - 302
- [10] Stability measures for polling schedules with applications to capacity expansion planning, master production scheduling, and lot sizing [J]. OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 1998, 26 (03): : 355 - 366