Integration of Planning and Scheduling for Large-Scale Multijob Multitasking Batch Plants

被引:1
|
作者
Menon, Kavitha G. [1 ]
Fukasawa, Ricardo [2 ]
Ricardez-Sandoval, Luis A. [1 ]
机构
[1] Univ Waterloo, Dept Chem Engn, Waterloo, ON N2L 3G1, Canada
[2] Univ Waterloo, Dept Combinator & Optimizat, Waterloo, ON N2L 3G1, Canada
关键词
DECOMPOSITION; OPTIMIZATION; FORMULATION; OPERATIONS; INDUSTRY; INTEGER;
D O I
10.1021/acs.iecr.3c02408
中图分类号
TQ [化学工业];
学科分类号
0817 ;
摘要
In this study, we propose a novel framework to integrate planning and scheduling for a multijob multitasking large-scale industrial plant. The key contribution of this study is that the proposed approach can address problems involving multijob batch plants where there are no fixed products or recipes, i.e., the job specifications could vary with respect to client requirements. The proposed approach includes a long-term planning model and a short-term scheduling model that are integrated using an iterating framework, where the two models interact with each other and share information in every iteration. A long-term planning model is developed for a multijob batch plant that provides key planning decisions, including daily processing targets and the required number of workers to achieve those targets to the scheduling model. In addition, to allow the integration of such a planning model with scheduling, we propose an iterative integration scheme that includes a calibration scheme combined with a rolling horizon approach. The proposed scheme also considers variations in job arrivals and allows to account for the latest job arrivals in the planning model. The proposed framework was validated using an actual industrial case study from the analytical services sector, which is focused on carrying out analyses on samples that are ordered by clients. The results obtained show an average increase of 8.27% in terms of profit when the models are integrated using the rolling horizon approach in comparison to solving the models sequentially.
引用
收藏
页码:1039 / 1054
页数:16
相关论文
共 50 条
  • [41] A combined fuzzy set theory and MILP approach in integration of planning and scheduling of batch plants - Personnel evaluation and allocation
    Majozi, T
    Zhu, XX
    COMPUTERS & CHEMICAL ENGINEERING, 2005, 29 (09) : 2029 - 2047
  • [42] Frequency Excursion Likelihood Constrained Resource Scheduling for Large-Scale Renewable Energy Integration
    Herath, Akila
    Manaz, M. A. Mohammed
    Liyanage, Kithsiri M.
    Masuta, Taisuke
    Lu, Chan-Nan
    Nishio, Koji
    IEEE ACCESS, 2022, 10 : 90563 - 90575
  • [43] Game Theoretical Scheduling of Modern Power Systems with Large-scale Wind Power Integration
    Wei, Wei
    Liu, Feng
    Mei, Shengwei
    2012 IEEE POWER AND ENERGY SOCIETY GENERAL MEETING, 2012,
  • [44] Synergistic Optimization Scheduling Considering Large-scale Wind Power and Electric Vehicles Integration
    Xie Birong
    Wu Jiajie
    PROCEEDINGS OF 8TH INTERNATIONAL CONFERENCE ON INTELLIGENT COMPUTATION TECHNOLOGY AND AUTOMATION (ICICTA 2015), 2015, : 904 - 908
  • [45] A novel constraint programming model for large-scale scheduling problems in multiproduct multistage batch plants: Limited resources and campaign-based operation
    Novara, Franco M.
    Novas, Juan M.
    Henning, Gabriela P.
    COMPUTERS & CHEMICAL ENGINEERING, 2016, 93 : 101 - 117
  • [46] Integrated process planning and scheduling for large-scale flexible job shops using metaheuristics
    Sobeyko, Oleh
    Moench, Lars
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2017, 55 (02) : 392 - 409
  • [47] GUIDELINES FOR PARTITIONING IN LARGE-SCALE INTEGRATION
    IMAI, JK
    DEATLEY, ER
    ELECTRO-TECHNOLOGY, 1967, 80 (02): : 50 - &
  • [48] LARGE-SCALE INTEGRATION IN ORGAN DESIGN
    SCHRECONGOST, RB
    JOURNAL OF THE AUDIO ENGINEERING SOCIETY, 1972, 20 (04): : 275 - +
  • [49] Closing in on photonics large-scale integration
    Gunn, Cary
    Masini, Gianlorenzo
    PHOTONICS SPECTRA, 2007, 41 (12) : 74 - 78
  • [50] Toward Biological Large-Scale Integration
    Roukes, Michael
    ULIS 2009: 10TH INTERNATIONAL CONFERENCE ON ULTIMATE INTEGRATION OF SILICON, 2009, : 3 - 3