Structural integrity analysis of the pre-stressed concrete dome of the Belgrade fair hall 1

被引:0
|
作者
Jelic, Mirjana [1 ]
Sedmak, Aleksandar [2 ,3 ]
Folic, Boris [4 ]
Sedmak, Simon [4 ]
Arandjelovi, Mihajlo [4 ]
Foli, Radomir [5 ]
Radu, Dorin [3 ]
机构
[1] Intellectual Property Off Republic Serbia, Kneginje Ljubice 5, Belgrade 11000, Serbia
[2] Univ Belgrade, Fac Mech Engn Belgrade, Kraljice Marije 16, Belgrade 11000, Romania
[3] Univ Brasov, Fac Civil Engn, Turnului 5, Brasov 500152, Romania
[4] Innovat Ctr, Fac Mech Engn, Kraljice Marije 16, Belgrade 11120, Serbia
[5] Univ Novi Sad, Fac Tech Sci, Novi Sad, Serbia
关键词
Belgrade fair hall 1; Structural integrity; Pre-stressed concrete; Numerical simulation; SIMULATION; SHELL;
D O I
10.3221/IGF-ESIS.67.24
中图分类号
TH [机械、仪表工业];
学科分类号
0802 ;
摘要
Belgrade fair hall 1 is well known for its dome, which is still the world largest self-supported construction made of pre-stressed concrete, with its diameter of 106 m. In this paper the Finite Element Method (FEM) was performed to analyze different loading and supporting conditions. At the same time, crack growth in a support column was simulated by the extended FEM (XFEM). Results of numerical calculations indicate ingenious design of such a complex structure which was based on “hand” calculation decades ago, without computers. In addition to classical engineering and more advanced numerical calculations, risk based analysis was performed taking into account artificially introduced crack and Failure Analysis Diagram, obtained using stress intensity factor and net stress, as well as fracture toughness and critical stress. This analysis, made for the first time for Belgrade fair hall 1, proved that its structural integrity is jeopardized only when a crack reaches half the thickness of a steel bar. © 2024, Gruppo Italiano Frattura. All rights reserved.
引用
收藏
页码:337 / 351
页数:15
相关论文
共 50 条
  • [21] DESIGN METHODS FOR SHEAR OF REINFORCED AND PRE-STRESSED CONCRETE
    RIEVE, JJ
    FORSCHUNG IM INGENIEURWESEN-ENGINEERING RESEARCH, 1978, 44 (05): : 147 - 157
  • [22] MODELING THE BEHAVIOR OF PRE-STRESSED CONCRETE RAILROAD TIES
    Haynes, Mark D.
    Wu, Chih-Hang John
    Bodapati, Naga Narendra B.
    Beck, B. Terry
    Peterman, Robert J.
    PROCEEDINGS OF THE ASME JOINT RAIL CONFERENCE, 2015, 2015,
  • [23] SRAP Pre-stressed Reinforcing Techniques for Concrete Structures
    Hu Shaowei
    MECHATRONICS AND APPLIED MECHANICS, PTS 1 AND 2, 2012, 157-158 : 1545 - 1548
  • [24] Sound protection with hollow pre-stressed concrete panels
    Anon
    Betonwerk und Fertigteil-Technik/Concrete Precasting Plant and Technology, 1999, 65 (03): : 49 - 60
  • [25] Research and Application of Pre-stressed Concrete Composite Slabs
    Zhang, Jingshu
    Nie, Huanhuan
    Yang, Yuanlong
    Yao, Yuan
    PROGRESS IN STRUCTURE, PTS 1-4, 2012, 166-169 : 131 - 139
  • [26] Nonlinear shear strength of pre-stressed concrete beams
    Rahai, Alireza
    Shokoohfar, A.
    STRUCTURAL ENGINEERING AND MECHANICS, 2012, 41 (04) : 441 - 458
  • [27] Experimental study on fatigue of pre-stressed concrete sleeper
    Yang, H.
    Rock and Soil Mechanics, 2001, 22 (03) : 357 - 360
  • [28] PC(Pre-stressed Concrete)板的制造
    陈尚棠
    佛山陶瓷, 1996, (01) : 51 - 53+56
  • [30] Integrity analysis of bumpy-ridge beam in the pre-stressed wire winded framework
    Peng, Junbin
    Yan, Yongnian
    Zhang, Renji
    Lin, Feng
    Jixie Gongcheng Xuebao/Chinese Journal of Mechanical Engineering, 2008, 44 (12): : 308 - 313