Effect of geometric parameters of a restraining embankment on the stabilization of a deep open-pit mine excavation

被引:0
|
作者
Jiang, Lichun [1 ,2 ]
Wang, Gege [2 ]
Xue, Luanluan [3 ]
Jia, Lijuan [2 ]
机构
[1] South China Univ Technol, Sch Civil Engn & Transportat, Guangzhou 510640, Peoples R China
[2] South China Univ Technol, Inst Safety Sci & Engn, Guangzhou 510640, Peoples R China
[3] South China Univ Technol, State Key Lab Subtrop Bldg Sci, Guangzhou 510640, Peoples R China
基金
中国国家自然科学基金; 国家重点研发计划;
关键词
Open-pit mining; Landslide; Slope remediation; Safety factor; Slope stability; STABILITY; LANDSLIDE;
D O I
10.1007/s10064-023-03457-0
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Effective slope stabilization measure in deep open-pit mines not only ensures the safety of employees and equipment, but also makes sound economic sense. Based on field investigations of a landslide at the Lishan Iron Mine, south China, an innovative and effective method for slope remediation is proposed. An in situ foundation embankment was first created by excavating an anti-slip foundation trench, then the slope was stabilized by building a restraining embankment against the slope. The in situ foundation embankment had a dense structure which provided good resistance both to slip and to overturn. The restraining embankment was constructed out of mining waste rock and reduced the potential for slope failure by diminishing the potential free area of the slope and inhibiting the development of fractures in the rock mass forming the slope. In view of the structural characteristics of the in situ foundation embankment, an analytical solution for the safety factor of the embankment slope is deduced using theoretical analysis and numerical simulation for various combinations of geometric parameters. The results show that the safety factor of the embankment decreases with an increase of step height and step slope angle and increases with an increase of platform width and that step slope angle is the key parameter which affects the safety factor and both the maximum displacement and maximum plastic strain. The reliability of the proposed method is validated using field monitoring results from the Lishan Iron Mine after the embankment construction. This mine has now been safely running without landslides for two hydrological years after the stabilization works were constructed.
引用
收藏
页数:14
相关论文
共 50 条
  • [1] Effect of geometric parameters of a restraining embankment on the stabilization of a deep open-pit mine excavation
    Lichun Jiang
    Gege Wang
    Luanluan Xue
    Lijuan Jia
    Bulletin of Engineering Geology and the Environment, 2023, 82
  • [2] A STUDY OF RADIATION PARAMETERS IN AN OPEN-PIT MINE
    LEACH, VA
    LOKAN, KH
    MARTIN, LJ
    HEALTH PHYSICS, 1982, 43 (03): : 363 - 375
  • [3] The Influence of Rainfall on Landslide Stability of an Open-Pit Mine: The Case of Haizhou Open-Pit Mine
    An Bo
    Zhu Chun
    Liu Kuiming
    Li Sitong
    Tao Zhigang
    Li Haipeng
    Yu Haoran
    GEOTECHNICAL AND GEOLOGICAL ENGINEERING, 2019, 37 (04) : 3367 - 3378
  • [4] The Influence of Rainfall on Landslide Stability of an Open-Pit Mine: The Case of Haizhou Open-Pit Mine
    An Bo
    Zhu Chun
    Liu Kuiming
    Li Sitong
    Tao Zhigang
    Li Haipeng
    Yu Haoran
    Geotechnical and Geological Engineering, 2019, 37 : 3367 - 3378
  • [5] Study on blasting parameters optimization in Anjialing open-pit mine
    Huang Xiaoming
    Zhang Ruixin
    Sun Qiang
    PROGRESS IN MINING SCIENCE AND SAFETY TECHNOLOGY, PTS A AND B, 2007, : 793 - 798
  • [6] ECSTALL STORY - OPEN-PIT MINE
    COUPLAND, GC
    CIM BULLETIN, 1974, 67 (745): : 64 - 69
  • [7] Efficient simulation for an open-pit mine
    Dendle, Nicholas
    Isokangas, Erik
    Corry, Paul
    SIMULATION MODELLING PRACTICE AND THEORY, 2022, 117
  • [8] Solving Challenges at an Open-Pit Mine
    GPS World, 2021, 32 (04): : 24 - 25
  • [9] TRUCK REQUIREMENTS IN AN OPEN-PIT MINE
    MADGE, DN
    OPERATIONS RESEARCH, 1963, 11 : B123 - B123
  • [10] OPEN-PIT PLANNING AT ADAMS MINE
    WEST, FJ
    CANADIAN MINING AND METALLURGICAL BULLETIN, 1966, 59 (647): : 329 - &