共 50 条
- [45] Two-phase flow analysis in multi-channel Journal of Mechanical Science and Technology, 2006, 20 : 840 - 848
- [50] Effective Two-Phase Heuristic and Lower Bounds for Multi-Stage Flexible Flow Shop Scheduling Problem with Unloading Times SYMMETRY-BASEL, 2023, 15 (11):