Evaluating building circularity in the early design phase

被引:8
|
作者
van der Zwaag, Marco [1 ]
Wang, Tong [1 ]
Bakker, Hans [1 ]
van Nederveen, Sander [1 ]
Schuurman, A. C. B. [1 ]
Bosma, Douwe [2 ]
机构
[1] Delft Univ Technol, Delft, Netherlands
[2] BAM Infra Nederland, Bunnik, Netherlands
关键词
Decision support system; Evaluation tool; Building information modelling; Circular design workflow; Building circularity index; Material circularity indicator; BIM;
D O I
10.1016/j.autcon.2023.104941
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Facing circular transition challenges, building circularity should be evaluated in the early design phase to reduce the risks of circular and environmental performance problems found in later project phases. However, due to the current design workflow, such practice is hindered because there is not enough information to evaluate building circularity in detail in the early design phases. An improved workflow to emphasize circularity more in the early design phase is thus needed. This research explores the current workflow and designs an improved workflow by developing an automated decision support system to assess early design phase building circularity with limited available information, aiming to improve the working efficiency and efficacy. This automated system helps in data-driven decision-making by integrating different data sources and presenting the calculated results inter-actively with business intelligence interfaces. The interfaces involve different types of evaluations based on the data availability in both schematic design and detail design sub-phases. It also visualizes the data quality and future scenarios. This system has been designed based on interviews and literature studies, and verified and validated with practitioners. This study serves as a starting point to rethink the workflow to improve circularity with currently available technology.
引用
收藏
页数:28
相关论文
共 50 条
  • [41] Multi-objective optimisation for building integrated photovoltaics (BIPV) roof projects in early design phase
    Wijeratne, W. M. Pabasara Upalakshi
    Samarasinghalage, Tharushi Imalka
    Yang, Rebecca Jing
    Wakefield, Ron
    APPLIED ENERGY, 2022, 309
  • [42] Developing a Fuzzy Analytic Hierarchy Process for Choosing the Energetically Optimal Solution at the Early Design Phase of a Building
    Szuts, Andras
    Kromer, Istvan
    ACTA POLYTECHNICA HUNGARICA, 2015, 12 (03) : 25 - 39
  • [43] Design for Inspection - Evaluating the Inspectability of Aerospace Components in the Early Stages of Design
    Stolt, Roland
    Elgh, Fredrik
    Andersson, Petter
    27TH INTERNATIONAL CONFERENCE ON FLEXIBLE AUTOMATION AND INTELLIGENT MANUFACTURING, FAIM2017, 2017, 11 : 1193 - 1199
  • [44] Methods for evaluating and covering the design space during early design development
    Gries, M
    INTEGRATION-THE VLSI JOURNAL, 2004, 38 (02) : 131 - 183
  • [45] From circularity to sustainability: Advancing the whole building circularity indicator with Life Cycle Assessment (WBCI-LCA)
    Khadim, Nouman
    Agliata, Rosa
    Han, Qi
    Mollo, Luigi
    BUILDING AND ENVIRONMENT, 2025, 269
  • [46] Development of a Sustainable Design Guideline for a School Building in the Early Design Stage
    Kang, Hae Jin
    Rhee, Eon Ku
    JOURNAL OF ASIAN ARCHITECTURE AND BUILDING ENGINEERING, 2014, 13 (02) : 467 - 474
  • [47] CARES Framework: A Circularity Assessment Method for Residential Building Structures
    Vasquez-Cabrera, Alicia
    Montes, Maria Victoria
    Llatas, Carmen
    SUSTAINABILITY, 2025, 17 (02)
  • [48] Enhancing circularity of wood waste through deconstruction in building sector
    Zhu, Shiyao
    Feng, Haibo
    JOURNAL OF CLEANER PRODUCTION, 2024, 485
  • [49] Evaluating a Proposed Approach for Managing Collaborative Design in the Conceptual Design Phase
    Sebastian, Rizal
    ARCHITECTURAL ENGINEERING AND DESIGN MANAGEMENT, 2006, 2 (03) : 216 - 224
  • [50] A design advisor for the optimal inspection of circularity tolerance
    Hemant Ramaswami
    Atul Modi
    Sam Anand
    The International Journal of Advanced Manufacturing Technology, 2007, 31 : 857 - 870