Time Series Prediction on Settlement of Metro Tunnels Adjacent to Deep Foundation Pit by Clustering Monitoring Data

被引:2
|
作者
Zhang, Qi [1 ,2 ]
Ma, Yanning [1 ]
Zhang, Bin [1 ]
Tian, Longgang [1 ]
Zhang, Guozhu [3 ]
机构
[1] Southeast Univ, Sch Civil Engn, Nanjing 211189, Peoples R China
[2] China Univ Min & Technol, State Key Lab Geomech & Deep Underground Engn, Xuzhou 221116, Peoples R China
[3] Southeast Univ, Sch Transportat, Nanjing 211189, Peoples R China
基金
中国国家自然科学基金; 国家重点研发计划;
关键词
Settlement of metro tunnels; Improved data clustering method; Time series prediction; Adjacent to the deep foundation pit; Gaussian Mixture model; SIMILARITY SEARCH; ALGORITHM;
D O I
10.1007/s12205-023-0274-y
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
High requirements are put forward for the settlement control of metro tunnel to ensure the normal and safe operation of adjacent metro line during the process of deep foundation pit construction. Monitoring and predicting could constantly monitor the settlement of the tunnel and make safety early-warning, and massive data to be processed is collected by sensors in this process. In the study, an improved clustering method based on Gaussian mixture model (GMM) is proposed to deal with a large amount of monitoring data. Four initial eigenvalues are defined and the initial core points of clustering are selected by grouping monitoring sensors based on the characteristics of the project site and sensors. An improved method is utilized to the metro tunnel of Metro Line 9 near Xujiahui station. Compared with the traditional clustering method, the improved method has more reliable results, and reduces the operation time by 57.9%. Representative monitoring sensors are selected from each cluster to predict based on Long Short-Term Memory (LSTM) neural network. The prediction results well agree with the measured value and the prediction accuracy is reaching to 99.3%. Compared with other sensor selection ways, the data of representative sensors exhibits good representativeness and effectiveness. Finally, the prediction result after data update is more consistent with the monitoring data than the prediction result without data update. Increasing the data update frequency improves the accuracy of the prediction results in practical engineering application.
引用
收藏
页码:2180 / 2190
页数:11
相关论文
共 50 条
  • [21] A method based on time series improvement method of wavelet applied to deep foundation pit monitoring
    Zhao Yan-rong
    Yuan Bao-yuan
    ROCK AND SOIL MECHANICS, 2008, 29 (12) : 3381 - 3386
  • [23] Research on earth pressure monitoring data of deep foundation pit
    Peng She-qin
    Zhao Qi-hua
    ROCK AND SOIL MECHANICS, 2006, 27 (04) : 657 - +
  • [24] Research on earth pressure monitoring data of deep foundation pit
    National Laboratory of Geological Hazard and Engineering Geological Environment Protection, Chengdu University of Technology, Chengdu 610059, China
    Rock Soil Mech, 2006, 4 (657-661+672):
  • [25] Time Series Prediction of Chimney Foundation Settlement by Neural Networks
    Zhang, Guangcheng
    Xiang, Xin
    Tang, Huiming
    INTERNATIONAL JOURNAL OF GEOMECHANICS, 2011, 11 (03) : 154 - 158
  • [26] Time series prediction for ground settlement in portal section of mountain tunnels
    Wang S.-H.
    Zhu B.-Q.
    Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering, 2021, 43 (05): : 813 - 821
  • [27] Risk Reduction Measures and Monitoring Analysis of Deep Foundation Pit with Water in a Metro Station in Hefei
    Wang, Dengqun
    Ye, Shuaihua
    Zhang, Jun
    WATER, 2023, 15 (16)
  • [28] Analysis of deformation characteristics of foundation pit of metro station and adjacent buildings induced by deep excavation in soft soil
    Liu Nian-wu
    Chen Yi-tian
    Gong Xiao-nan
    Yu Ji-tao
    ROCK AND SOIL MECHANICS, 2019, 40 (04) : 1515 - +
  • [29] Numerical simulation of excavation of deep foundation pit adjacent to metro station based on FLAC3D
    Ren, Wei-Ming
    Peng, Li-Yun
    Liu, Jun
    Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering, 2013, 35 (SUPPL.2): : 276 - 280
  • [30] The deformation prediction of foundation pit slope based on time series analysis
    Liu, Hanbing
    Sun, Yanyi
    Cheng, Yongchun
    Jiang, Ping
    Jiao, Yubo
    INFORMATION ENGINEERING FOR MECHANICS AND MATERIALS SCIENCE, PTS 1 AND 2, 2011, 80-81 : 516 - +