Complexity-based risk decision framework for cost overrun using fuzzy Bayesian network

被引:0
|
作者
Afzal, Farman [1 ]
Afzal, Fahim [2 ]
Junaid, Danish [3 ]
Shah, Imran Ahmed [4 ]
Yunfei, Shao [5 ]
机构
[1] Univ Engn & Technol, Inst Business & Management, Lahore, Pakistan
[2] Hohai Univ, Business Sch, Nanjing, Peoples R China
[3] Bahria Univ, Bahria Business Sch, Islamabad, Pakistan
[4] Abdul Latif Univ, Dept Business Adm Shah, Khairpur, Pakistan
[5] Univ Elect Sci & Technol China, Sch Management & Econ, Chengdu, Peoples R China
基金
中国国家自然科学基金;
关键词
Risk assessment; Cost overrun; Complexity-risk interdependency; Fuzzy logic; Bayesian network; Construction projects; PROCESS MODEL; TRANSPORT INFRASTRUCTURE; CONSTRUCTION PROJECT; DELAY; MANAGEMENT; KNOWLEDGE; SAFETY; AHP; PRIORITIZATION; PERFORMANCE;
D O I
10.1007/s00500-023-07983-7
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
This study adheres to find important complexity-risk interdependent causes of cost overrun in infrastructure transport projects rather considering an independent state of project risk. Aiming for addressing cost overrun problem to facilitate decision-makers, a hierarchical breakdown structure of complex elements and complexity-driven risk factors at different levels of severity is conceptualized along with their interdependency network of key relationships. In this work, an integrated approach of fuzzy logic with the Bayesian belief network is employed for cost-risk assessment while assuming linguistic scales of likelihood and consequences parameters. The simulated results of cost-risk decision framework imply that poor design issues, increase in material prices and delay in relocating facilities show higher complexity-risk dependency and increase the risk of cost overrun in complex projects. This study contributes to the body of knowledge by providing a practical hybrid risk decision framework to identify and evaluate the key complexity-risk interdependencies in underline relations to the cost overrun problem in construction.
引用
收藏
页码:6187 / 6203
页数:17
相关论文
共 50 条
  • [41] Risk modelling of a hydrogen gasholder using Fuzzy Bayesian Network (FBN)
    Aliabadi, Mostafa Mirzaei
    Pourhasan, Afshin
    Mohammadfam, Iraj
    [J]. INTERNATIONAL JOURNAL OF HYDROGEN ENERGY, 2020, 45 (01) : 1177 - 1186
  • [42] Risk analysis of operating room using the fuzzy Bayesian network model
    Zoullouti B.
    Amghar M.
    Sbiti N.
    [J]. Zoullouti, B. (zoulloutibouchra@gmail.com), 2017, Materials and Energy Research Center (30): : 66 - 74
  • [43] Risk assessment of mine ignition sources using fuzzy Bayesian network
    Li, Min
    Wang, Deming
    Shan, He
    [J]. PROCESS SAFETY AND ENVIRONMENTAL PROTECTION, 2019, 125 : 297 - 306
  • [44] Development of risk based dynamic backorder replenishment planning framework using Bayesian Belief Network
    Shin, KwangSup
    Shin, YongWoo
    Kwon, Ji-Hye
    Kang, Suk-Ho
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2012, 62 (03) : 716 - 725
  • [45] Based on Fuzzy Bayesian Network of Oil Wharf Handling Risk Assessment
    Hou, Zhiqiang
    Zhao, Peng
    [J]. MATHEMATICAL PROBLEMS IN ENGINEERING, 2016, 2016
  • [46] Risk assessment of infectious disease epidemic based on fuzzy Bayesian network
    Fu, Lingmei
    Yang, Qing
    Liu, Xingxing
    He, Ling
    [J]. RISK ANALYSIS, 2024, 44 (01) : 40 - 53
  • [47] Credit Card Rredit Risk Evaluation Based on Fuzzy Bayesian Network
    Zhao, Liling
    [J]. 2013 3RD INTERNATIONAL CONFERENCE ON APPLIED SOCIAL SCIENCE (ICASS 2013), VOL 1, 2013, : 400 - 405
  • [48] A decision support method for credit risk based on the dynamic Bayesian network
    Lu, Jie
    Wu, Desheng
    Dong, Junran
    Dolgui, Alexandre
    [J]. INDUSTRIAL MANAGEMENT & DATA SYSTEMS, 2023, 123 (12) : 3053 - 3079
  • [49] Developing a Risk Management Framework for Agricultural Water Systems Using Fuzzy Dynamic Bayesian Networks and Decision-Making Models
    Bozorgi, Atiyeh
    Roozbahani, Abbas
    Shahdany, Seied Mehdy Hashemy
    Abbassi, Rouzbeh
    [J]. WATER RESOURCES MANAGEMENT, 2024,
  • [50] A complexity-based risk assessment of low-cost planetary missions: when is a mission too fast and too cheap?
    Bearden, DA
    [J]. ACTA ASTRONAUTICA, 2003, 52 (2-6) : 371 - 379