Two-stage no-wait proportionate flow shop scheduling with minimal service time variation and optional job rejection

被引:7
|
作者
Koulamas, Christos [1 ]
Kyparisis, George J. [1 ]
机构
[1] Florida Int Univ, Dept Informat Syst & Business Analyt, Miami, FL 33199 USA
关键词
Scheduling; no-wait; Flow shop; Proportionate; Rejection; AGREEABLY WEIGHTED VARIANCE; MEAN SQUARED DEVIATION; DUE-DATE ASSIGNMENT; SINGLE-MACHINE; COMPLETION TIMES; MINIMIZATION; COMMON; ALGORITHMS; BRANCH; MODELS;
D O I
10.1016/j.ejor.2022.06.025
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
We consider two-stage no-wait proportionate flow shops with the objective of minimizing service time variation measured by defining the mid-processing point of a job and minimizing the Total Absolute Deviation of mid-processing Points (TADZ). We show that the two-stage no-wait proportionate flow shop with the TADZ objective is solvable in O(nlogn) time. Our findings provide an affirmative answer to an open research question posed by Kovalev et al. (2019) regarding existence of a solvable variant of the two-stage no-wait proportionate flow shop problem with the Total Absolute Deviation of Completion Times (TADC) objective. Moreover, we show when a generic two-stage no-wait proportionate flow shop scheduling problem is solvable in O(nlogn) time. We present practical applications where TADZ is more suitable than TADC as a scheduling objective. We also introduce a new metric defined as the sum of all partial schedule lengths SPSL and show that the two-stage no-wait proportionate flow shop with the SPSL objective is solvable in O(nlogn) time; thus, an additional solvable variant of the two-stage no-wait proportionate flow shop with the SPSL objective is identified and solved. Finally, we consider the option of rejecting a job from the schedule by paying a job-specific penalty for each rejected job and solve the resulting problem with the TADZ objective and the rejection option in O(n3) time by dynamic programming. (C) 2022 Elsevier B.V. All rights reserved.
引用
收藏
页码:608 / 616
页数:9
相关论文
共 50 条
  • [21] A Combination of Two Simple Decoding Strategies for the No-wait Job Shop Scheduling Problem
    Valenzuela, Victor M.
    Brizuela, Carlos A.
    Cosio-Leon, M. A.
    Danisa Romero-Ocano, A.
    PROCEEDINGS OF THE 2019 GENETIC AND EVOLUTIONARY COMPUTATION CONFERENCE (GECCO'19), 2019, : 864 - 871
  • [22] No-wait two stage hybrid flow shop scheduling with genetic and adaptive imperialist competitive algorithms
    Moradinasab, Nazanin
    Shafaei, Rasoul
    Rabiee, Meysam
    Ramezani, Pezhman
    JOURNAL OF EXPERIMENTAL & THEORETICAL ARTIFICIAL INTELLIGENCE, 2013, 25 (02) : 207 - 225
  • [23] Two-stage hybrid flow shop scheduling with dynamic job arrivals
    Yao, Frank S.
    Zhao, Mei
    Zhang, Hui
    COMPUTERS & OPERATIONS RESEARCH, 2012, 39 (07) : 1701 - 1712
  • [24] Scheduling on proportionate flow shop with job rejection and common due date assignment
    Geng, Xin-Na
    Sun, Xinyu
    Wang, Jiayin
    Pan, Lei
    COMPUTERS & INDUSTRIAL ENGINEERING, 2023, 181
  • [25] Two-machine no-wait flow shop scheduling with missing operations
    Glass, CA
    Gupta, JND
    Potts, CN
    MATHEMATICS OF OPERATIONS RESEARCH, 1999, 24 (04) : 911 - 924
  • [26] No-wait hybrid flow shop scheduling problem based on just in time
    Wang, Li
    Wang, Mengguang
    Dongbei Daxue Xuebao/Journal of Northeastern University, 1998, 19 (04): : 349 - 351
  • [27] Two-machine flow shop no-wait scheduling with a nonavailability interval
    Kubzin, MA
    Strusevich, VA
    NAVAL RESEARCH LOGISTICS, 2004, 51 (04) : 613 - 631
  • [28] Two-machine flow shop no-wait scheduling with machine maintenance
    Kubzin M.A.
    Strusevich V.A.
    4OR, 2005, 3 (4) : 303 - 313
  • [29] Two-machine flow shop scheduling problems with no-wait jobs
    Bouquard, JL
    Billaut, JC
    Kubzin, MA
    Strusevich, VA
    OPERATIONS RESEARCH LETTERS, 2005, 33 (03) : 255 - 262
  • [30] Two-stage no-wait hybrid flowshop scheduling with inter-stage flexibility
    Zhong, Weiya
    Shi, Yun
    JOURNAL OF COMBINATORIAL OPTIMIZATION, 2018, 35 (01) : 108 - 125