Exploring the critical production risk factors for modular integrated construction projects

被引:10
|
作者
Wuni, Ibrahim Yahaya [1 ]
Shen, Geoffrey Qiping [1 ]
机构
[1] Hong Kong Polytech Univ, Dept Bldg & Real Estate, Hung Hom, Kowloon, Hong Kong, Peoples R China
关键词
Modular integrated construction; Production risks; Risk factors; Supply chain; Severity; Risk management; OFF-SITE CONSTRUCTION; PERFORMANCE; IMPLEMENTATION; OPPORTUNITIES; COORDINATION; BUILDINGS; SYSTEM;
D O I
10.1108/JFM-03-2021-0029
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Purpose The factory production stage constitutes the bridge in the supply chains of modular integrated construction (MiC) projects. It embodies the fundamental differences between MiC and site-based construction. However, there is a poverty of knowledge of the uncertainties and risk events at the production stage. This study aims to investigate the critical production risk factors (PRFs) for MiC projects. Design/methodology/approach Comprehensive literature research and expert review identified and validated 22 candidate PRFs for MiC projects. A structured questionnaire survey was then used to gather opinions of domain experts in 18 countries on the relative impact of the validated PRFs for MiC projects. The collected data were analysed using multiple statistical techniques. Findings Statistical analysis identified nine critical PRFs for MiC projects. The top five include dimensional conflicts between modules during production; delays in production materials procurement; defective design; design information gap between designer and manufacturer; and limited capacity of manufacturers. Originality/value The study addressed the gap associated with identifying critical risk factors peculiar to the factory production stage of MiC projects. Its novelty lies in providing an opposite assessment of severities and prioritization of critical PRFs for MiC projects. The prioritized critical PRFs for MiC projects may inform resource allocation. Thus, it provides valuable information to MiC production specialists and project managers in their production risk planning and management strategies. The identified PRFs contribute to the theoretical checklist of MiC supply chain risk factors and may assist practitioners in assessing the severity levels of the PRFs of their MiC projects.
引用
收藏
页码:50 / 68
页数:19
相关论文
共 50 条
  • [41] An Integrated Approach of Simulation and Regression Analysis for Assessing Productivity in Modular Integrated Construction Projects
    Taiwo, Ridwan
    Hussein, Mohamed
    Zayed, Tarek
    BUILDINGS, 2022, 12 (11)
  • [42] A hybrid simulation model for modules installation in modular integrated construction projects
    Abdelmageed, Sherif
    Abdelkhalek, Sherif
    Hussien, Mohamed
    Zayed, Tarek
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2024, 24 (13) : 1407 - 1418
  • [43] Risk-averse supply chain for modular construction projects
    Hsu, Pei-Yuan
    Aurisicchio, Marco
    Angeloudis, Panagiotis
    AUTOMATION IN CONSTRUCTION, 2019, 106
  • [44] Effect of Critical Risk Factors Causing Cost Deviation in Medium Sized Construction Projects
    Renuka, Senthil Muthalvan
    Umarani, Chockkalingam
    JOURNAL OF CONSTRUCTION IN DEVELOPING COUNTRIES, 2018, 23 (02) : 63 - 85
  • [45] A critical success factors model for effective implementation of risk management process in the construction projects
    Qammaz, Amani S. Bu
    AlMaian, Rufaidah Y.
    JOURNAL OF ENGINEERING RESEARCH, 2020, 8 (03): : 50 - 70
  • [46] Analysing critical risk factors of Indian road construction projects: a fuzzy DEMATEL approach
    Tiwari, Anubhav
    Singh, Shailender
    Routroy, Srikanta
    Gopinath, Athira
    Sahu, Prasanta K.
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2024,
  • [47] Identifying Critical Time-Overrun and Risk Factors in Kuwait's Construction Projects
    Al Otaibi, Srour
    Al Zubaidi, Hassan
    BEYOND BORDERS: NEW GLOBAL MANAGEMENT DEVELOPMENT CHALLENGES AND OPPORTUNITIES, 2007, 16 : 624 - +
  • [48] Modelling the role of modular construction's critical success factors in the overall sustainable success of Egyptian housing projects
    Ali, Ali Hassan
    Kineber, Ahmed Farouk
    Elyamany, Ahmed
    Ibrahim, Ahmed Hussein
    Daoud, Ahmed Osama
    JOURNAL OF BUILDING ENGINEERING, 2023, 71
  • [49] Critical Success Factors for Concrete Recycling in Construction Projects
    Badraddin, Abdulmalek K.
    Radzi, Afiqah R.
    Almutairi, Saud
    Rahman, Rahimi A.
    SUSTAINABILITY, 2022, 14 (05)
  • [50] Critical cost factors of building construction projects in Malaysia
    Toh, Tien-Choon
    Ting, Connie
    Ali, Kherun-Nita
    Aliagha, Godwin-Uche
    Munir, Omar
    INTERNATIONAL CONFERENCE ON ASIA PACIFIC BUSINESS INNOVATION AND TECHNOLOGY MANAGEMENT, 2012, 57 : 360 - 367