ADMM-based joint rescheduling method for high-speed railway timetabling and platforming in case of uncertain perturbation✩

被引:8
|
作者
Liu, Xuan [1 ]
Zhou, Min [1 ]
Dong, Hairong [1 ]
Wu, Xingtang [1 ]
Li, Yidong [2 ]
Wang, Fei-Yue [3 ]
机构
[1] Beijing Jiaotong Univ, State Key Lab Rail Traff Control & Safety, Beijing 100044, Peoples R China
[2] Beijing Jiaotong Univ, Sch Comp & Informat Technol, Beijing 100044, Peoples R China
[3] Chinese Acad Sci, Inst Automat, State Key Lab Management & Control Complex Syst, Beijing 100190, Peoples R China
基金
中国国家自然科学基金;
关键词
Timetable rescheduling; Platforming; Uncertain perturbation; Model predictive control; Alternative direction method of multipliers; TIME TRAFFIC MANAGEMENT; MODEL REFORMULATION; TRAIN CONTROL; OPTIMIZATION; INTEGRATION; ALGORITHM; NETWORKS; FLOW;
D O I
10.1016/j.trc.2023.104150
中图分类号
U [交通运输];
学科分类号
08 ; 0823 ;
摘要
The operation of high-speed trains is susceptible to perturbations such as strong winds and heavy snowfall, causing them to deviate from operating schedules. A joint mixed-integer linear programming (MILP) model based on the event-activity network is proposed to reschedule the train timetable and platform assignment jointly. Trains traveling in different directions are simultaneously considered in this model, and they can occupy the available reverse platforms in stations. Furthermore, to strengthen the robustness of the rescheduling scheme in case of uncertain perturbations, such as variable temporary speed restrictions caused by changing wind speed, the uncertainty is modeled using scenario-based chance constraints, which are then converted into deterministic constraints. Model predictive control (MPC) divides the entire time horizon into several stages. In each stage, the proposed model is decomposed according to directions. The constraints for trains traveling in different directions are dualized by the Alternating Direction Method of Multipliers (ADMM), which makes the sub-problems decoupled and solvable in parallel in each iteration of ADMM, promoting real-time performance. The real timetable and line data of Beijing-Shanghai HSR are utilized to investigate the effect of the proposed method. Compared to the commonly used strategies, it can significantly reduce delays and the number of affected events. The proposed method also shows relatively high robustness compared to the method in the case of predefined perturbations. It causes fewer conflicts and fewer needs for rescheduling when facing the changing perturbation and gets rescheduling results with higher quality.
引用
收藏
页数:27
相关论文
共 50 条
  • [31] WindTrans: Transformer-Based Wind Speed Forecasting Method for High-Speed Railway
    Liu, Chen
    He, Shibo
    Liu, Haoyu
    Chen, Jiming
    Dong, Hairong
    IEEE TRANSACTIONS ON INTELLIGENT TRANSPORTATION SYSTEMS, 2024, 25 (06) : 4947 - 4963
  • [32] Earthquake resilience assessment and improving method of high- speed railway based on train timetable rescheduling
    Li, Shuang
    Tang, Yumeng
    Zhai, Changhai
    INTERNATIONAL JOURNAL OF DISASTER RISK REDUCTION, 2022, 82
  • [33] Robust Train Operation Plan Based on Uncertain Passenger Demands for High-speed Railway Corridors
    Zhang C.-T.
    Qi J.-G.
    Yang L.-X.
    Gao Y.
    Gao Z.-Y.
    Jiaotong Yunshu Xitong Gongcheng Yu Xinxi/Journal of Transportation Systems Engineering and Information Technology, 2022, 22 (01): : 115 - 123
  • [34] Intelligent Rescheduling Research on Train Dispatching Section of Main Line High-speed Railway Based on Improved GWO Algorithm
    Zhou Xiaozhao
    Zhang Qi
    Wang Tao
    2020 IEEE 5TH INTERNATIONAL CONFERENCE ON INTELLIGENT TRANSPORTATION ENGINEERING (IEEE ICITE 2020), 2020, : 195 - 199
  • [35] Prediction of High-Speed Railway Passenger Traffic Volume Based on Integrated Method
    Li, Hengda
    Xu, Chang'an
    PROCEEDINGS OF THE SIXTH INTERNATIONAL CONFERENCE ON TRANSPORTATION ENGINEERING (ICTE 2019), 2019, : 643 - 650
  • [36] Parallel method for preprocessing high-speed railway noise data based on MapReduce
    Wang, Zhong-Gang
    Li, Tian-Rui
    Zhang, Jun-Bo
    Zhao, Cheng-Bing
    Gao, Zi-Zhe
    Tongxin Xuebao/Journal on Communications, 2011, 32 (9 A): : 263 - 269
  • [37] Method of Recognizing the High-speed Railway Noise Barriers Based on the Distance Image
    Ma, Le
    Shao, Shuangyun
    Feng, Qibo
    Liu, Bingqian
    Ryong, Kim Chol
    OPTICAL MEASUREMENT TECHNOLOGY AND INSTRUMENTATION, 2016, 10155
  • [38] An Identification Method of High-speed Railway Sign Based on Convolutional Neural Network
    Meng L.
    Sun X.-Y.
    Zhao B.
    Li N.
    1600, Science Press (46): : 518 - 530
  • [39] Positioning Method Based on Cell Azimuth in VoLTE Test for High-speed Railway
    Duan B.
    Li C.
    Xie J.
    Lü A.
    Tiedao Xuebao/Journal of the China Railway Society, 2020, 42 (01): : 52 - 58
  • [40] High-speed railway dynamic scheduling based on Q-learning method
    Han X.-C.
    Yu S.-P.
    Yuan Z.-M.
    Cheng L.-J.
    Kongzhi Lilun Yu Yingyong/Control Theory and Applications, 2021, 38 (10): : 1511 - 1521