Heuristic approaches for scheduling of a two-machine flowshop with outsourcing lead-time

被引:0
|
作者
Kim, Eun-Seok [1 ]
Lee, Ik Sun [2 ]
机构
[1] Queen Mary Univ London, Sch Business & Management, London, England
[2] Dong A Univ, Sch Business, Busan, South Korea
关键词
Scheduling; outsourcing; two-machine flowshop; heuristic; biased random-key genetic algorithm; LOCAL SEARCH ALGORITHM; GENETIC ALGORITHM; FLOWTIME;
D O I
10.1080/0305215X.2024.2310764
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This article studies a scheduling problem of a two-machine flowshop , considering outsourcing lead-time, where outsourcing a job incurs outsourcing cost as well as outsourcing lead-time. Each job has an option of being outsourced, i.e. the first operation of the outsourced job is handled by an external subcontractor while the second operation must be processed in-house after its delivery. The objective is to find a schedule for minimizing the weighted sum of the outsourcing costs and the total completion time. For the problem, the subset of jobs to be outsourced and the processing order of jobs are interwoven, implying that decisions have to be made simultaneously. This study examines the properties of the optimal solution and proposes various heuristics based on iterative local search and the biased random-key genetic algorithm. Extensive computational experiments are carried out in various settings.
引用
收藏
页数:19
相关论文
共 50 条
  • [31] Two-machine flowshop scheduling in a physical examination center
    Yadong Wang
    Baoqiang Fan
    Jingang Zhai
    Wei Xiong
    [J]. Journal of Combinatorial Optimization, 2019, 37 : 363 - 374
  • [32] Batching and scheduling to minimize the makespan in the two-machine flowshop
    Cheng, TCE
    Wang, GQ
    [J]. IIE TRANSACTIONS, 1998, 30 (05) : 447 - 453
  • [34] An improved two-machine flowshop scheduling with intermediate transportation
    Dong, Jianming
    Wang, Xueshi
    Hu, Jueliang
    Lin, Guohui
    [J]. JOURNAL OF COMBINATORIAL OPTIMIZATION, 2016, 31 (03) : 1316 - 1334
  • [35] AN EFFECTIVE HEURISTIC FOR TWO-MACHINE FLOWSHOP WITH BATCH PROCESSING MACHINES
    Liao, Li-Man
    Huang, Ching-Jen
    [J]. PROCEEDINGS OF THE 38TH INTERNATIONAL CONFERENCE ON COMPUTERS AND INDUSTRIAL ENGINEERING, VOLS 1-3, 2008, : 1953 - 1961
  • [36] An improved two-machine flowshop scheduling with intermediate transportation
    Jianming Dong
    Xueshi Wang
    Jueliang Hu
    Guohui Lin
    [J]. Journal of Combinatorial Optimization, 2016, 31 : 1316 - 1334
  • [37] Scheduling the fabrication and assembly of components in a two-machine flowshop
    Cheng, TCE
    Wang, GQ
    [J]. IIE TRANSACTIONS, 1999, 31 (02) : 135 - 143
  • [38] A two-agent scheduling problem in a two-machine flowshop
    Ahmadi-Darani, Mohammad-Hasan
    Moslehi, Ghasem
    Reisi-Nafchi, Mohammad
    [J]. INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING COMPUTATIONS, 2018, 9 (03) : 289 - 306
  • [39] Heuristic search algorithms for lot streaming in a two-machine flowshop
    Marimuthu, S
    Ponnambalam, SG
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2005, 27 (1-2): : 174 - 180
  • [40] Heuristic search algorithms for lot streaming in a two-machine flowshop
    [J]. Ponnambalam, S.G. (sgponnambalam@engsci.monash.edu.my), 1600, Springer-Verlag London Ltd (27): : 1 - 2