Quantify the effect of antecedent effective precipitation on rainfall intensity-duration threshold of debris flow

被引:7
|
作者
Zhang, Shaojie [1 ]
Xia, Manyu [1 ]
Li, Li [2 ,4 ]
Yang, Hongjuan [1 ]
Liu, Dunlong [3 ]
Wei, Fangqiang [1 ]
机构
[1] Chinese Acad Sci, Inst Mt Hazards & Environm, Key Lab Mt Hazards & Earth Surface Proc, Chengdu 610041, Peoples R China
[2] Chongqing Univ Sci & Technolog, Sch Safety Engn, Chongqing 401331, Peoples R China
[3] Chengdu Univ Informat & Technol, Coll Software Engn, Chengdu 610225, Peoples R China
[4] Chongqing Nat Resources Safety Dispatch Ctr, Chongqing 401147, Peoples R China
基金
中国国家自然科学基金;
关键词
Antecedent effective precipitation; ID threshold; Debris flow; Debris flow density; SHALLOW LANDSLIDES; SOIL-MOISTURE; RUNOFF; CATCHMENT; MOBILIZATION; VARIABILITY; DERIVATION; SYSTEM; YUNNAN; MODEL;
D O I
10.1007/s10346-023-02066-y
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
alpha and beta are the two key parameters of the rainfall intensity-duration (ID) threshold curve for debris flow; the antecedent effective precipitation (AEP) poses influence on the ID threshold curve through changing alpha and beta. It is critical to explore the correlations of alpha similar to AEP and beta similar to AEP in order to quantify the influence of antecedent precipitation on ID threshold. However, the quantitative relationship between the AEP and the two parameters is still undetermined. In this study, a hydrological process-based numerical model that can derive the ID threshold curve is adopted to address this issue. Jiangjia Gully (JJG) in Dongchuan District of Yunnan Province, China, was chosen as the study area. The analysis results show that a higher AEP can provide favorable hydrological conditions for runoff generation and solid material resource recharge in JJG, but it do not always mean that the ID threshold condition for triggering debris flow is decreased. As for JJG, only after AEP > 40 mm, the AEP and ID threshold condition for triggering debris flow will be completely negatively correlated; when 15 mm <= AEP <= 40 mm, the solid material supply is rapidly increased by the AEP, a stronger hydrodynamic condition is required to transform them into debris flow meaning that the ID threshold condition for triggering debris flow is enhanced in JJG, and this positive correlation between them persists until the two ID threshold curves intersect in the I-D coordinate system. AEP will significantly change the position of the threshold curve in the I-D coordinate system, and the change law of the position of the ID threshold curve can be described by the functions of alpha similar to AEP and beta similar to AEP. Due to the two functions, the ID threshold curve can regularly move in the I-D coordinate system rather than a conventional threshold curve stay the same regardless of AEP variation; it is beneficial to improve the prediction capacity of the ID threshold.
引用
收藏
页码:1719 / 1730
页数:12
相关论文
共 50 条
  • [31] An hydrology-process based method for antecedent effect rainfall determination in debris flow forecasting
    Key Laboratory of Mountain Hazards and Earth Surface Process, Chinese Academy of Sciences, Chengdu
    610041, China
    不详
    610041, China
    Shuikexue Jinzhan, 1 (34-43):
  • [32] Effect of rainfall intensity and duration on debris flows in central Santa Cruz Mountains, California
    Wieczorek, Gerald F.
    GSA Reviews in Engineering Geology, 1987, 7 : 93 - 104
  • [33] Rainfall intensity–duration thresholds for postfire debris-flow emergency-response planning
    Susan H. Cannon
    Eric M. Boldt
    Jayme L. Laber
    Jason W. Kean
    Dennis M. Staley
    Natural Hazards, 2011, 59 : 209 - 236
  • [34] THE RAINFALL INTENSITY - DURATION CONTROL OF SHALLOW LANDSLIDES AND DEBRIS FLOWS
    CAINE, N
    GEOGRAFISKA ANNALER SERIES A-PHYSICAL GEOGRAPHY, 1980, 62 (1-2) : 23 - 27
  • [35] EFFECT OF ANTECEDENT RAINFALL ON RUNOFF DURING LOW-INTENSITY RAINFALL
    ISTOK, JD
    BOERSMA, L
    JOURNAL OF HYDROLOGY, 1986, 88 (3-4) : 329 - 342
  • [36] Rainfall Intensity-Duration Thresholds for Triggering Shallow Landslides in the Eastern Ligurian Riviera (Italy)
    Giannecchini, Roberto
    Galanti, Yuri
    Barsanti, Michele
    ENGINEERING GEOLOGY FOR SOCIETY AND TERRITORY, VOL 2: LANDSLIDE PROCESSES, 2015, : 1581 - 1584
  • [37] Improvement of SCS-CN model based on antecedent precipitation and rainfall duration
    Wu A.
    Wang X.
    Huang J.
    Huang J.
    Wang J.
    Li Z.
    Nongye Gongcheng Xuebao/Transactions of the Chinese Society of Agricultural Engineering, 2021, 37 (22): : 85 - 94
  • [38] A remote-sensing-based intensity-duration threshold, Faifa Mountains, Saudi Arabia
    Karki, Sita
    Sultan, Mohamed
    Alsefry, Saleh
    Alharbi, Hassan
    Emil, Mustafa Kemal
    Elkadiri, Racha
    Abu Alfadail, Emad
    NATURAL HAZARDS AND EARTH SYSTEM SCIENCES, 2019, 19 (06) : 1235 - 1249
  • [39] Landslides triggered by rainfall: A semi-automated procedure to define consistent intensity-duration thresholds
    Segoni, Samuele
    Rossi, Guglielmo
    Rosi, Ascanio
    Catani, Filippo
    COMPUTERS & GEOSCIENCES, 2014, 63 : 123 - 131
  • [40] Determination of effective antecedent rainfall for debris flow forecast based on soil moisture content observation in Jiangjia Gully, China
    Wei, F.
    Hu, K.
    Zhang, J.
    Jiang, Y.
    Chen, J.
    MONITORING, SIMULATION, PREVENTION AND REMEDIATION OF DENSE DEBRIS FLOWS II, 2008, 60 : 13 - 22