共 50 条
- [21] Prediction of the rock properties ahead of the tunnel face in TBM tunnels by geostatistical simulation technique [J]. ENVIRONMENTAL ROCK ENGINEERING, 2003, : 245 - 250
- [25] Stand Up Time in Tunnel Base on Rock Mass Rating Bieniawski 1989 [J]. 3RD INTERNATIONAL CONFERENCE ON CONSTRUCTION AND BUILDING ENGINEERING (ICONBUILD 2017), 2017, 1903
- [26] Rock mass rating and control of tunnel boring machines by means of fuzzy logic [J]. Glueckauf-Forschungshefte, 1999, 60 (04): : 107 - 112
- [27] GEOLOGICAL PROGNOSIS AHEAD OF A TUNNEL FACE [J]. ENGINEERING GEOLOGY, 1993, 35 (3-4) : 229 - 235
- [29] A MODEL OF ROCK MASS FRACTURING AHEAD OF THE LONGWALL FACE AS A CONSEQUENCE OF INTENSITY OF EXPLOITATION [J]. ACTA GEODYNAMICA ET GEOMATERIALIA, 2013, 10 (02): : 137 - 145