Dock assignment and truck scheduling problem; consideration of multiple scenarios with resource allocation constraints

被引:8
|
作者
Monemi, Rahimeh Neamatian [1 ,2 ,3 ,4 ]
Gelareh, Shahin [5 ,6 ]
机构
[1] IT & Business Analyt Ltd, London, England
[2] Sharkey Predictim Globe, Villeneuve Dascq, France
[3] CNRS, UMR 9189, Ctr Rech Informat, Signal & Automat Lille, Villeneuve Dascq, France
[4] Univ Lille, Lille, France
[5] Univ Artois, IUT Bethune, Dept R&T, F-62000 Bethune, France
[6] Paris Sch Business, Paris, France
关键词
Cross-docking; Resource allocation; MILP modelling; Dantzig-Wolfe decomposition; GATE ASSIGNMENT; TIME; TRANSSHIPMENT; HEURISTICS; ALGORITHM;
D O I
10.1016/j.cor.2022.106074
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
The notion of 'resource' plays an important role in the overall efficiency and performance of most cross-docks. The processing time can often be described in terms of the resources allocated to different trucks. Conversely, for a given processing time, different combinations of resources can be prescribed. We study the problem of truck scheduling and dock assignment in the presence of resource constraints. In the absence of a closed -form (or well-defined) linear formulation describing the processing times as a function of resources, expert' knowledge has been mobilized to enable modelling of the problem as an integer linear model. Two cases are taken into account: In the first one, the expert believes in his/her estimation of the processing time for every truck and only proposes a different combination of resources for his/her estimation, while in the second one the expert proposes a limited number of resource deployment scenarios for serving trucks, each of which has a different combination of resources and different processing times. We propose a novel compact integer programming formulation for the problem, which is particularly designed with an embedded structure that can be exploited in dual decomposition techniques with a remarkably computationally efficient column generation approach in this case. The case in which a scenario with invariant processing time is considered and modelled as a special case of the proposed model. Since a direct application of commercial solvers such as CPLEX to solve instances of this problem is not realistic, we propose a branch-and-price framework and, moreover, several classes of valid inequalities. Our extensive computational experiments confirm that the proposed exact solution framework is very efficient and viable in solving real-size instances of the practice and in a reasonable amount of time.
引用
收藏
页数:14
相关论文
共 50 条
  • [41] An ant colony algorithm for yard truck scheduling and yard location assignment problems with precedence constraints
    Zhaojie Xue
    Canrong Zhang
    Lixin Miao
    Wei-Hua Lin
    Journal of Systems Science and Systems Engineering, 2013, 22 : 21 - 37
  • [42] AN ANT COLONY ALGORITHM FOR YARD TRUCK SCHEDULING AND YARD LOCATION ASSIGNMENT PROBLEMS WITH PRECEDENCE CONSTRAINTS
    Xue, Zhaojie
    Zhang, Canrong
    Miao, Lixin
    Lin, Wei-Hua
    JOURNAL OF SYSTEMS SCIENCE AND SYSTEMS ENGINEERING, 2013, 22 (01) : 21 - 37
  • [43] Integrated Resource Allocation and Scheduling in a Bidirectional Flowshop With Multimachine and COS Constraints
    Zhao, ZhengYi John
    Lau, Hoong Chuin
    Ge, Shuzhi Sam
    IEEE TRANSACTIONS ON SYSTEMS MAN AND CYBERNETICS PART C-APPLICATIONS AND REVIEWS, 2009, 39 (02): : 190 - 200
  • [44] Project resource allocation optimization problem based on generalized resource calendar constraints
    Kong F.
    Si G.
    Guo J.-L.
    Kongzhi yu Juece/Control and Decision, 2024, 39 (05): : 1620 - 1628
  • [45] Stochastic customer order scheduling on heterogeneous parallel machines with resource allocation consideration
    Zhao, Yaping
    Xu, Xiaoyun
    Xu, Endong
    Niu, Ben
    COMPUTERS & INDUSTRIAL ENGINEERING, 2021, 160
  • [46] Adaptive Workflow Scheduling Under Resource Allocation Constraints and Network Dynamics
    Avanes, Artin
    Freytag, Johann-Christoph
    PROCEEDINGS OF THE VLDB ENDOWMENT, 2008, 1 (02): : 1631 - 1637
  • [47] A two-agent resource allocation scheduling problem with slack due-date assignment and general deterioration function
    Li, Ming-Hui
    Lv, Dan-Yang
    Lv, Zheng-Guo
    Zhang, Li-Han
    Wang, Ji-Bo
    COMPUTATIONAL & APPLIED MATHEMATICS, 2024, 43 (04):
  • [48] Multi-objective scheduling and a resource allocation problem in hospitals
    Jeric, Silvija Vlah
    Figueira, Jose Rui
    JOURNAL OF SCHEDULING, 2012, 15 (05) : 513 - 535
  • [49] Multi-objective scheduling and a resource allocation problem in hospitals
    Silvija Vlah Jerić
    José Rui Figueira
    Journal of Scheduling, 2012, 15 : 513 - 535
  • [50] A SIMHEURISTIC ALGORITHM FOR SOLVING AN INTEGRATED RESOURCE ALLOCATION AND SCHEDULING PROBLEM
    Maccarrone, Ludovica
    Giovannelli, Tommaso
    Ferone, Daniele
    Panadero, Javier
    Juan, Angel A.
    2018 WINTER SIMULATION CONFERENCE (WSC), 2018, : 3340 - 3351