A hybrid genetic algorithm for stochastic job-shop scheduling problems

被引:5
|
作者
Boukedroun, Mohammed [1 ]
Duvivier, David [2 ]
Ait-el-Cadi, Abdessamad [2 ,3 ]
Poirriez, Vincent [2 ]
Abbas, Moncef [1 ]
机构
[1] Univ Sci & Technol USTHB, AMCD RO, BP32, Algiers 16111, Algeria
[2] Polytech Univ Hauts de France, CNRS, UMR 8201 LAMIH, F-59313 Valenciennes, France
[3] INSA Hauts de France, F-59313 Valenciennes, France
关键词
Combinatorial optimization; stochastic job-shop scheduling problem; genetic algorithms; tabu search; hybrid metaheuristic; DISPATCHING RULES; TABOO SEARCH; OPTIMIZATION;
D O I
10.1051/ro/2023067
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
Job-shop scheduling problems are among most studied problems in last years because of their importance for industries and manufacturing processes. They are classified as NP-hard problems in the strong sense. In order to tackle these problems several models and methods have been used. In this paper, we propose a hybrid metaheuristic composed of a genetic algorithm and a tabu search algorithm to solve the stochastic job-shop scheduling problem. Our contribution is based on a study of the perturbations that affect the processing times of the jobs. These perturbations, due to machine failures, occur according to a Poisson process; the results of our approach are validated on a set of instances originating from the OR-Library (Beasley, J. Oper. Res. Soc. 41 (1990) 1069-1072). On the basis of these instances, the hybrid metaheuristic is used to solve the stochastic job-shop scheduling problem with the objective of minimizing the makespan as first objective and the number of critical operations as second objective during the robustness analysis. Indeed, the results show that a high value of the number of critical operations is linked to high variations of the makespan of the perturbed schedules, or in other words to a weak robustness of the relating GA's best schedule. Consequently, critical operations are not only good targets for optimizing a schedule, but also a clue of its goodness when considering stochastic and robustness aspects: the less critical operations it contains, the better it is.
引用
收藏
页码:1617 / 1645
页数:29
相关论文
共 50 条
  • [31] Hybrid-sorting Genetic Algorithm for Job-shop Scheduling Problem
    程娜
    崔荣一
    延边大学学报(自然科学版), 2007, (02) : 129 - 133
  • [32] Study on job-shop scheduling systems based on hybrid genetic algorithm
    Ye, CM
    Zhang, FD
    ISIM'2000: PROCEEDINGS OF THE FIFTH CHINA-JAPAN INTERNATIONAL SYMPOSIUM ON INDUSTRIAL MANAGEMENT, 2000, : 81 - 84
  • [33] A Genetic Algorithm for Hybrid Job-Shop Scheduling Problems with Minimizing the Makespan or Mean Flow Time
    Gholami, Omid
    Sotskov, Yuri N.
    Werner, Frank
    JOURNAL OF ADVANCED MANUFACTURING SYSTEMS, 2018, 17 (04) : 461 - 486
  • [34] Hybrid Genetic Algorithm for Solving Job Shop Scheduling Problems
    Piroozfard, Hamed
    Hassan, Adnan
    Moghadam, Ali Mokhtari
    Asl, Ali Derakhshan
    MATERIALS, INDUSTRIAL, AND MANUFACTURING ENGINEERING RESEARCH ADVANCES 1.1, 2014, 845 : 559 - 563
  • [35] Adaptive Genetic Algorithms for The Job-Shop Scheduling Problems
    Yang, Gui
    Lu, Yujun
    Li, Ren-wang
    Han, Jin
    2008 7TH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION, VOLS 1-23, 2008, : 4501 - +
  • [36] A Hybrid Discrete Imperialist Competition Algorithm for Fuzzy Job-Shop Scheduling Problems
    Wang, Shuaiqun
    Aorigele
    Liu, Guanjun
    Gao, Shangce
    IEEE ACCESS, 2016, 4 : 9320 - 9331
  • [37] A Hybrid Optimization Algorithm for the Job-shop Scheduling Problem
    Zhou, Qiang
    Cui, Xunxue
    Wang, Zhengshan
    Yang, Bin
    WORLD SUMMIT ON GENETIC AND EVOLUTIONARY COMPUTATION (GEC 09), 2009, : 757 - 763
  • [38] A Hybrid Algorithm for Flexible Job-shop Scheduling Problem
    Tang, Jianchao
    Zhang, Guoji
    Lin, Binbin
    Zhang, Bixi
    CEIS 2011, 2011, 15
  • [39] An improved genetic algorithm for Job-shop scheduling problem
    Lou Xiao-fang
    Zou Feng-xing
    Gao Zheng
    Zeng Ling-li
    Ou Wei
    CCDC 2009: 21ST CHINESE CONTROL AND DECISION CONFERENCE, VOLS 1-6, PROCEEDINGS, 2009, : 2595 - +
  • [40] Solution of job-shop scheduling problems by an idle time shortening genetic algorithm
    Ida, Kenichi
    Osawa, Akira
    Electrical Engineering in Japan (English translation of Denki Gakkai Ronbunshi), 2007, 159 (02): : 55 - 63