Life Cycle Assessment of the Construction Process in a Mass Timber Structure

被引:6
|
作者
Hemmati, Mahboobeh [1 ]
Messadi, Tahar [2 ]
Gu, Hongmei [3 ]
机构
[1] Univ Arkansas, Environm Dynam PhD Program, Fayetteville, AR 72701 USA
[2] Univ Arkansas, Fay Jones Sch Architecture & Design, Fayetteville, AR 72701 USA
[3] US Forest Serv, USDA, Forest Prod Lab, Madison, WI 53726 USA
关键词
construction process; building; LCA; embodied carbon; mass timber; GREENHOUSE-GAS EMISSIONS; ENVIRONMENTAL IMPACTS; SUSTAINABILITY; ENERGY; BUILDINGS;
D O I
10.3390/su16010262
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Today, the application of green materials in the building industry is the norm rather than the exception and reflects an attempt to mitigate the sector's environmental impacts. Mass timber is growing rapidly in the construction field because of its long span, speed of installation, lightness and toughness, carbon sequestration capabilities, renewability, fire rating, acoustic isolation, and thermal resistance. Mass timber is close to overtaking steel and concrete as the preferred material. The endeavor of this research is to quantitatively assess the ability of this green material to leverage the abatement of carbon emissions. Life cycle assessment (LCA) is a leading method for assessing the environmental impacts of the building sector. The recently completed Adohi Hall mass timber building on the University of Arkansas campus was used as a case study in an investigation to quantify greenhouse gas (GHG) emissions throughout the construction phase only. The energy used in building operations is the most dominant source of emissions in the building industry and has galvanized research on increasing the efficiency of building operations, but reduced emissions have made the impacts of embodied carbon (EC) components more noticeable in the building life cycle. While most studies have focused on the manufacturing stage, only a few to date have focused on the construction process. Consequently, few data are available on the environmental impacts associated with the installation of mass timber as a new green material. The present study began with the quantification of the materials and an inventory of the equipment used for construction. Then, this study determined the EC associated with running the equipment for building construction. The GHG emissions resulting from the transportation of materials to the site were also quantified. Based on data collected from the construction site, the results of this study indicate that earthwork ranks first in carbon emissions, followed by mass timber installation and construction. In third place is ready-mix poured concrete and rebar installation, followed by Geopiers. A comparison of these results with those in the existing literature shows that the EC generally associated with the building construction phase has been underestimated to date. Furthermore, only emissions associated with the fuel usage of the main equipment were considered.
引用
收藏
页数:16
相关论文
共 50 条
  • [21] Wood and timber derived products in comparative life cycle assessment studies
    Richter, K
    Gugerli, H
    HOLZ ALS ROH-UND WERKSTOFF, 1996, 54 (04) : 225 - 231
  • [22] The computational structure of life cycle assessment
    Reinout Heijungs
    Sangwon Sun
    The International Journal of Life Cycle Assessment, 2002, 7 (5) : 314 - 314
  • [23] Comparison of Building Construction and Life-Cycle Cost for a High-Rise Mass Timber Building with its Concrete Alternative
    Gu, Hongmei
    Liang, Shaobo
    Bergman, Richard
    FOREST PRODUCTS JOURNAL, 2020, 70 (04) : 482 - 492
  • [24] Economic and environmental life cycle assessment of alternative mass timber walls to evaluate circular economy in building: MCDM method
    Balasbaneh, Ali Tighnavard
    Sher, Willy
    ENVIRONMENT DEVELOPMENT AND SUSTAINABILITY, 2024, 26 (01) : 239 - 268
  • [25] Life Cycle Assessment and Cost Analysis of Mid-Rise Mass Timber vs. Concrete Buildings in Australia
    Jolly, Riley
    Fairweather, Holly
    Rayburg, Scott
    Rodwell, John
    SUSTAINABILITY, 2024, 16 (15)
  • [26] Economic and environmental life cycle assessment of alternative mass timber walls to evaluate circular economy in building: MCDM method
    Ali Tighnavard Balasbaneh
    Willy Sher
    Environment, Development and Sustainability, 2024, 26 : 239 - 268
  • [27] Environmental life cycle assessment of the microfiltration process
    Tangsubkul, N.
    Parameshwaran, K.
    Lundie, S.
    Fane, A. G.
    Waite, T. D.
    JOURNAL OF MEMBRANE SCIENCE, 2006, 284 (1-2) : 214 - 226
  • [28] Material life cycle assessment for diecasting process
    Kim, SK
    Cho, H
    Jo, HH
    Han, NK
    Lim, ST
    Hur, T
    THERMEC'2003, PTS 1-5, 2003, 426-4 : 3353 - 3357
  • [29] The application of life cycle assessment to process optimisation
    Azapagic, A
    Clift, R
    COMPUTERS & CHEMICAL ENGINEERING, 1999, 23 (10) : 1509 - 1526
  • [30] Life Cycle Assessment of Tyre Manufacturing Process
    Shanbag, Amit
    Manjare, Sampatrao
    JOURNAL OF SUSTAINABLE DEVELOPMENT OF ENERGY WATER AND ENVIRONMENT SYSTEMS-JSDEWES, 2020, 8 (01): : 22 - 34