共 50 条
- [41] Ground movements and vertical compensation grouting during shaft construction - Jubilee Line Extension, Green Park Station: Contract 101 GEOTECHNICAL ASPECTS OF UNDERGROUND CONSTRUCTION IN SOFT GROUND, 1996, : 417 - 422
- [46] On-line dead time compensation technique for open-loop PWM-VSI drives APEC '98 - THIRTEENTH ANNUAL APPLIED POWER ELECTRONICS CONFERENCE AND EXPOSITION, VOLS 1 AND 2, 1998, : 95 - 100
- [48] On-line dead-time compensation method for voltage source inverter fed motor drives APEC 2004: NINETEENTH ANNUAL IEEE APPLIED POWER ELECTRONICS CONFERENCE AND EXPOSITION, VOLS 1-3, 2004, : 122 - 127
- [49] In-line residence time distribution of dicarboxylic acid oligomers/dioxazoline chain extension by reactive extrusion POLYMER ENGINEERING AND SCIENCE, 1999, 39 (02): : 347 - 355
- [50] Non-fragile Compensation Controller Design for Linear Time-invariant Systems with Adaptive Mechanism 2011 CHINESE CONTROL AND DECISION CONFERENCE, VOLS 1-6, 2011, : 4106 - 4109