Resilient Expansion Planning of Electricity Grid Under Prolonged Wildfire Risk

被引:22
|
作者
Bayani, Reza [1 ,2 ]
Manshadi, Saeed D. [2 ]
机构
[1] Univ Calif San Diego, Dept Elect & Comp Engn, La Jolla, CA 92093 USA
[2] San Diego State Univ, Dept Elect & Comp Engn, San Diego, CA 92182 USA
关键词
Fires; Planning; Ignition; Uncertainty; Costs; Resilience; Power grids; Wildfire; expansion planning; two-stage robust optimization; resilience; uncertainties; natural disasters; ROBUST OPTIMIZATION; GENERATION; NETWORK;
D O I
10.1109/TSG.2023.3241103
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
Public safety power shut-off (PSPS) during potentially dangerous weather conditions is an emergency measure within areas prone to wildfires. While balancing the risk of wildfire ignition and the continuation of energy supply is a short-term operation challenge, this paper explores the optimal long-term resilient expansion planning strategies. With the quantified risk of wildfire ignition, the proposed expansion planning problem maximizes the supplied power to the end-users while limiting the risk of wildfire ignition. The presented scheme provides utility decision-makers with three groups of network expansion decisions, namely addition of new lines, modification of existing lines, and installation of distributed energy resources (DERs). Given the uncertainty of DERs and wildfire risk, a two-stage robust optimization problem is proposed which ensures power system resilience against unfavorable events. The case studies illustrate how the presented model balances shutting off customers, DER installation, and line addition/modification while inhibiting wildfire ignition risk. Besides, the results suggest that, with appropriate transmission switching, DER installation can be the optimal choice for meeting the growing demand while limiting wildfire ignition risk. The implications of different risk level choices are illustrated, and the impacts of uncertainties on the expansion decisions are explored. Finally, the results of applying the proposed model to the IEEE 118-bus test network are illustrated.
引用
收藏
页码:3719 / 3731
页数:13
相关论文
共 50 条
  • [31] Grid Expansion Planning for Carbon Emissions Reduction
    Bent, Russell
    Toole, G. Loren
    2012 IEEE POWER AND ENERGY SOCIETY GENERAL MEETING, 2012,
  • [32] Transmission network expansion planning under demand uncertainty and risk aversion
    Delgado, Daniel
    Claro, Joao
    INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2013, 44 (01) : 696 - 702
  • [33] Balancing risk: Generation expansion planning under climate mitigation scenarios
    Kim, Dowon
    Ryu, Heelang
    Lee, Jiwoong
    Kim, Kyoung-Kuk
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2022, 297 (02) : 665 - 679
  • [34] A Review on the Internalization of Externalities in Electricity Generation Expansion Planning
    Costa, Carlos Roberto de Sousa
    Ferreira, Paula
    ENERGIES, 2023, 16 (04)
  • [35] Transmission investment and expansion planning in electricity market environment
    Zheng, Feng-Lei
    Wen, Fu-Shuan
    Wu, Felix F.
    Dianli Xitong Zidonghua/Automation of Electric Power Systems, 2006, 30 (09): : 95 - 104
  • [36] Transmission investment and expansion planning in a restructured electricity market
    Wu, FF
    Zheng, FL
    Wen, FS
    ENERGY, 2006, 31 (6-7) : 954 - 966
  • [37] Integrated Microgrid Expansion Planning in Electricity Market With Uncertainty
    Khayatian, Aida
    Barati, Masoud
    Lim, Gino J.
    IEEE TRANSACTIONS ON POWER SYSTEMS, 2018, 33 (04) : 3634 - 3643
  • [38] Flexible Transmission Expansion Planning With Uncertainties in an Electricity Market
    Zhao, Jun Hua
    Dong, Zhao Yang
    Lindsay, Peter
    Wong, Kit Po
    IEEE TRANSACTIONS ON POWER SYSTEMS, 2009, 24 (01) : 479 - 488
  • [39] Transmission Expansion Planning in Electricity Market: The Case in Vietnam
    Anh Due Le
    Mai Huong Nguyen
    Eghbal, Mehdi
    Dinh Hieu Nguyen
    2013 AUSTRALASIAN UNIVERSITIES POWER ENGINEERING CONFERENCE (AUPEC), 2013,
  • [40] An approach for transmission system expansion planning in electricity market
    Falvo, M. C.
    2006 POWER ENGINEERING SOCIETY GENERAL MEETING, VOLS 1-9, 2006, : 2860 - 2866