Importance-based system cost management and failure risk analysis for different phases in life cycle

被引:2
|
作者
Dui, Hongyan [1 ]
Lu, Yaohui [2 ]
Chen, Liwei [3 ]
机构
[1] Zhengzhou Univ, Sch Management, Zhengzhou 450001, Peoples R China
[2] Beihang Univ, Sch Automat Sci & Elect Engn, Beijing 100191, Peoples R China
[3] Zhengzhou Univ, Sch Elect & Informat Engn, Zhengzhou 450001, Peoples R China
基金
中国国家自然科学基金;
关键词
System cost; Importance measures; Life cycle; Reliability; Failure risk; OPTIMIZATION; MAINTENANCE;
D O I
10.1016/j.ress.2023.109785
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
System life cycle can be divided into four phases: the production phase, the operation phase, maintenance phase and the end-of-life phase. Component failure leads to the different variable costs in different phases. Existing studies have investigated systems from a cost-effectiveness perspective of the operation and maintenance stage, which may not be holistic. Furthermore, the expected failure cost can be used to evaluate the failure risk. In this paper, a generalized system cost for different phases is analyzed in life cycle, then a risk optimization is studied based on an improvement importance. Firstly, a comprehensive life cycle cost model is proposed. Specifically, the operation and maintenance costs due to the different types of component failures are discussed, respectively. Besides, a specific selection method for performing end-of-life in case of component failure is given using the recovery importance. Secondly, an improvement importance is proposed to optimize system reliability under invariant resources. Thirdly, the specific process of the failure risk under limited resource using improvement importance is analyzed. Finally, the proposed methods are verified using two applications, and a discussion on unlimited resources for risk optimization is given.
引用
收藏
页数:22
相关论文
共 50 条
  • [41] Life cycle cost analysis of fuel cell based cogeneration system for residential application in Malaysia
    Mahlia, T. M. I.
    Chan, P. L.
    [J]. RENEWABLE & SUSTAINABLE ENERGY REVIEWS, 2011, 15 (01): : 416 - 426
  • [42] Performance based design using life cycle cost analysis
    Secer, M.
    Bozdag, Oe.
    [J]. PORTUGAL SB07 - SUSTAINABLE CONSTRUCTION, MATERIALS AND PRACTICES: CHALLENGE OF THE INDUSTRY FOR THE NEW MILLENNIUM, PTS 1 AND 2, 2007, : 546 - +
  • [43] Transformer life cycle cost model based on interval analysis
    Jiang, Xiubo
    Wu, Wenxuan
    Chen, Xiangwei
    [J]. Dianli Zidonghua Shebei/Electric Power Automation Equipment, 2011, 31 (09): : 50 - 53
  • [44] Life-cycle cost analysis in determining an importance factor for fire department buildings
    Chen, Wei-Cheng
    Tsai, I-Chau
    Chou, Kuang-Wu
    [J]. JOURNAL OF THE CHINESE INSTITUTE OF ENGINEERS, 2013, 36 (08) : 1029 - 1044
  • [45] Knowledge-based Risk Management in Project Life Cycle
    Luo Yan
    Han Yu
    Cnen Qun
    [J]. CRIOCM2009: INTERNATIONAL SYMPOSIUM ON ADVANCEMENT OF CONSTRUCTION MANAGEMENT AND REAL ESTATE, VOLS 1-6, 2009, : 1435 - 1440
  • [46] Integrated Risk Management Based on Life Cycle of Engineering Project
    Luo, Fuzhou
    Han, Yanhu
    [J]. ARCHITECTURE, BUILDING MATERIALS AND ENGINEERING MANAGEMENT, PTS 1-4, 2013, 357-360 : 2680 - 2683
  • [47] Development of life-cycle analysis based new bridge management system in Korea
    Sun, J. -W.
    Park, K. -H.
    Lee, S. -Y.
    Song, J. -J.
    Kong, J. -S.
    Yong, H.
    [J]. BRIDGE MAINTENANCE, SAFETY, MANAGEMENT AND LIFE-CYCLE OPTIMIZATION, 2010, : 2254 - 2261
  • [48] Life Cycle Management Support System of Nuclear Power Plant Based on Economic Analysis
    Guo, Jiang
    Gu, Kai Kai
    Feng, Zhihui
    Zeng, Bing
    Bai, Weimin
    Liu, Yajin
    [J]. PROCEEDINGS OF THE 10TH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION (WCICA 2012), 2012, : 4040 - 4044
  • [49] Bridge deck management system with integrated life-cycle cost optimization
    Hegazy, T
    Elbeltagi, E
    El-Behairy, H
    [J]. MAINTENANCE AND MANAGEMENT OF PAVEMENT AND STRUCTURES, 2004, (1866): : 44 - 50
  • [50] A DESIGN AND IMPLEMENTATION MODEL FOR LIFE-CYCLE COST MANAGEMENT-SYSTEM
    AHMED, NU
    [J]. INFORMATION & MANAGEMENT, 1995, 28 (04) : 261 - 269