Crucial Development Technologies for Volcanic Hydrocarbon Reservoirs: Lessons Learned from Asian Operations

被引:3
|
作者
Liu, Songxia [1 ]
Zhang, Yaoyuan [2 ]
Wu, Qilin [1 ]
Ayers, Walter B. [3 ]
Wang, Yanquan [4 ,5 ]
Ott, William K. [6 ]
Yan, Youguo
Shi, Wenyang
Wang, Yang
机构
[1] Guangdong Univ Petrochem Technol, Sch Petr Engn, Maoming 525011, Peoples R China
[2] CNOOC EnerTech Drilling & Prod Co, Zhanjiang Branch, Zhanjiang 524057, Peoples R China
[3] Texas A&M Univ, Petr Engn Dept, College Stn, TX 77843 USA
[4] Jiangmen Ind Dev Res Inst, Jiangmen 674100, Peoples R China
[5] Wuyi Univ, Sch Civil Engn & Architecture, Jiangmen 529000, Peoples R China
[6] Well Complet Technol, Houston, TX 77095 USA
关键词
volcanic; unconventional reservoir; geology; engineering; development technologies; EXPLORATION;
D O I
10.3390/pr11113052
中图分类号
TQ [化学工业];
学科分类号
0817 ;
摘要
Oil and gas reservoirs in volcanic rocks are a particular type of unconventional reservoir and present unique challenges for exploration and production engineers. To help the oil industry understand volcanic reservoirs and solutions to complex development problems, we reviewed their key engineering technologies as well as their geological characteristics. The distinctive geological characteristics of volcanic hydrocarbon reservoirs are strong heterogeneity, low porosity and permeability, complex fracture systems, etc. The volcanic reservoir rock types in order of hydrocarbon abundance are basalt (38.5%), andesite (15.9%), volcaniclastic (12.1%), and rhyolite (11.5%). The porosity ranges from 0.1 to 70%, and permeability ranges from 0.0007 to 762 md. In some commercially developed volcanic reservoirs of China, the average porosity is 7.7-13%; the average permeability is 0.41-3.4 md. Engineers have applied a variety of adapted technologies to produce volcanic reservoir economically. Horizontal wells can increase production and reserves by 4-6 times those of vertical wells, and longer wells are preferred. Specialized hydraulic fracturing techniques are suggested, including small or mixed proppant size, second HF treatment after proppant slugging, high-viscosity frac fluid with high-temperature resistance, special fluid loss reducer, high pump pressure, Extreme Overbalance Perforating, limited-entry fracturing, matrix acidizing, etc. Water control measures include producing below critical rates, partial perforation or penetration, controlling hydraulic fracture height, using horizontal wells, implementing complete cementing job, etc. Well productivity evaluation should be conducted to understand well performance and appropriately allocate production rates among wells, using the modified AOF method and other productivity prediction models considering breakdown fracture gradient, gas slippage effect, non-Darcy effect, etc. Well sites need to be selected based on recognizing profitable lithologies, lithofacies, high porosity and permeability, relatively developed fracture systems, thick net pay zones, etc. The critical questions for the industry are how to enhance volcanic reservoir recovery with more efficient and economic hydraulic fracturing and water control techniques. This is one of the first papers systematically summarizing the engineering technologies and unique solutions to develop volcanic reservoirs. Further and more complete reviews can be carried out in the future, and more novel and effective techniques can be explored and tested in the field.
引用
收藏
页数:16
相关论文
共 50 条
  • [41] Lessons learned from studies of the development of early melanoma
    Toshiaki Saida
    International Journal of Clinical Oncology, 2005, 10 (6) : 371 - 374
  • [42] Strategies for myelin regeneration: lessons learned from development
    Abhay Bhatt
    Lir-Wan Fan
    Yi Pang
    Neural Regeneration Research, 2014, 9 (14) : 1347 - 1350
  • [43] Executive development: History lessons learned from Barnard
    Novicevic, Milorad M.
    Heames, J. Timothy
    Paolillo, Joseph G. P.
    Buckley, M. Ronald
    LEADERSHIP QUARTERLY, 2009, 20 (02): : 155 - 161
  • [44] Lessons Learned from a Scientific Software Development Project
    Morris, Chris
    Segal, Judith
    IEEE SOFTWARE, 2012, 29 (04) : 9 - 12
  • [45] Teacher Professional Development Using Mobile Technologies in a Large-Scale Project: Lessons Learned from Bangladesh
    Shrestha, Prithvi
    INTERNATIONAL JOURNAL OF COMPUTER-ASSISTED LANGUAGE LEARNING AND TEACHING, 2012, 2 (04) : 34 - 49
  • [46] Lessons Learned from the SD2 Operations on the Comet 67/P
    A. Ercoli Finzi
    F. Bernelli-Zazzera
    P. Di Lizia
    Aerotecnica Missili & Spazio, 2017, 96 (3): : 148 - 153
  • [47] Lessons learned from engineering a multi-mission satellite operations center
    Madden, Maureen
    Cary, Everett, Jr.
    Esposito, Timothy
    Parker, Jeffrey
    Bradley, David
    2006 IEEE AEROSPACE CONFERENCE, VOLS 1-9, 2006, : 4317 - +
  • [48] Lessons Learned from 14 years of CCS Operations: Sleipner, In Salah and Snohvit
    Eiken, Ola
    Ringrose, Philip
    Hermanrud, Christian
    Nazarian, Bamshad
    Torp, Tore A.
    Hoier, Lars
    10TH INTERNATIONAL CONFERENCE ON GREENHOUSE GAS CONTROL TECHNOLOGIES, 2011, 4 : 5541 - 5548
  • [49] Lessons Learned From the Cross-Country Collaborations: Working With Asian Collaborators
    Chen, Wei-Ti
    NURSING RESEARCH, 2015, 64 (02) : E110 - E111
  • [50] Blended learning technologies in lifelong education: Lessons learned from a case study
    Liotsios, Konstantinos
    Demetriadis, Stavros
    Pombortsis, Andreas
    INNOVATIVE APPROACHES FOR LEARNING AND KNOWLEDGE SHARING, PROCEEDINGS, 2006, 4227 : 634 - 639