Balancing mixed-model assembly lines for random sequences

被引:2
|
作者
Sikora, Celso Gustavo Stall [1 ]
机构
[1] Univ Hamburg, Inst Operat Res, Moorweidenstr 18, D-20148 Hamburg, Germany
关键词
Flexible manufacturing systems; Mixed-model assembly-line balancing; Markov chains; Random sequence; Decomposition; MAKE-TO-ORDER; PARALLEL WORKSTATIONS; GENETIC ALGORITHM; WORK OVERLOAD; DESIGN; CLASSIFICATION; OPTIMIZATION; ENVIRONMENT; DECISIONS; MINIMIZE;
D O I
10.1016/j.ejor.2023.10.008
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Assembly lines are the standard choice for the manufacturing of large products and must combine efficiency with flexibility. Since multiple product variants are assembled on the same line, the variation in the processing time and the production sequence must be accounted for. This is especially hard in the planning phase of assembly lines when the demand is only forecast and the production sequence is not yet known. In this paper, an exact method and heuristic extensions are proposed to tackle the paced assembly-line balancing problem considering a random production sequence. Along with the assignment of tasks, the length of the stations is optimized in a Branch-and-Bound algorithm using Markov chains to evaluate the expected costs, which require the solution of a convex subproblem on each node. Product variants are modelled with a given probability, which can be either independent or correlated. Results of the model can be then further improved by optimizing the sequencing once the orders are known. The exact method can solve instances of small and medium-size containing up to 1012 product variants and the heuristic extensions can give good solutions with up to 1020 products. Results show that the optimization of station lengths is more important for the total cost than the difference between optimal and good task assignment solutions.
引用
收藏
页码:597 / 611
页数:15
相关论文
共 50 条
  • [21] Balancing and sequencing of mixed-model parallel robotic assembly lines considering energy consumption
    Soysal-Kurt, Halenur
    Isleyen, Selcuk Kursat
    Gokcen, Hadi
    [J]. FLEXIBLE SERVICES AND MANUFACTURING JOURNAL, 2024,
  • [22] SEQUENCING JIT MIXED-MODEL ASSEMBLY LINES
    INMAN, RR
    BULFIN, RL
    [J]. MANAGEMENT SCIENCE, 1991, 37 (07) : 901 - 904
  • [23] Sequencing mixed-model assembly lines to level parts usage with consideration of line balancing
    Song, HM
    [J]. PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON MECHANICAL ENGINEERING AND MECHANICS 2005, VOLS 1 AND 2, 2005, : 1655 - 1659
  • [24] Dynamic resequencing at mixed-model assembly lines
    Franz, Christian
    Koberstein, Achim
    Suhl, Leena
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2015, 53 (11) : 3433 - 3447
  • [25] A sequencing algorithm for mixed-model assembly lines
    Tokyo Metropolitan University
    [J]. J. Jpn Ind. Manage. Assoc., 2007, 4 (257-266):
  • [26] Balancing a Mixed-Model Assembly System in the Footwear Industry
    Sadeghi, Parisa
    Rebelo, Rui Diogo
    Ferreira, Jose Soeiro
    [J]. ADVANCES IN PRODUCTION MANAGEMENT SYSTEMS: THE PATH TO INTELLIGENT, COLLABORATIVE AND SUSTAINABLE MANUFACTURING, 2017, 513 : 527 - 535
  • [27] A RESOURCE BASED MODEL FOR MIXED-MODEL ASSEMBLY LINE BALANCING
    Genikomsakis, K. N.
    Tourassis, V. D.
    [J]. MANAGEMENT OF TECHNOLOGICAL CHANGES, VOL 1, 2009, : 493 - 496
  • [28] Sequencing mixed-model assembly lines by considering feeding lines
    Parviz Fattahi
    Neda Beitollahi Tavakoli
    Mehdi Fathollah
    Abdolreza Roshani
    Mohsen Salehi
    [J]. The International Journal of Advanced Manufacturing Technology, 2012, 61 : 677 - 690
  • [29] Sequencing mixed-model assembly lines by considering feeding lines
    Fattahi, Parviz
    Tavakoli, Neda Beitollahi
    Fathollah, Mehdi
    Roshani, Abdolreza
    Salehi, Mohsen
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2012, 61 (5-8): : 677 - 690
  • [30] A two-stage heuristic method for balancing mixed-model assembly lines with parallel workstations
    Vilarinho, PM
    Simaria, AS
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2002, 40 (06) : 1405 - 1420