Using TRACE to establish the analysis model of Kuosheng nuclear power plant for decommissioning transition phase

被引:0
|
作者
Hsu, Wen-Sheng [1 ]
Yang, Jung-Hua [2 ]
Chen, Hsuan-Che [2 ]
Chen, Shao-Wen [2 ]
Wang, Jong-Rong [2 ]
机构
[1] Natl Tsing Hua Univ, Nucl Sci & Technol Dev Ctr, 101,Sect 2,Kuang Fu Rd, Hsinchu 30013, Taiwan
[2] Natl Tsing Hua Univ, Inst Nucl Engn & Sci, 101,Sect 2,Kuang Fu Rd, Hsinchu 30013, Taiwan
关键词
BWR; 6; decommissioning transition phase; TRACE;
D O I
10.1515/kern-2022-0103
中图分类号
TL [原子能技术]; O571 [原子核物理学];
学科分类号
0827 ; 082701 ;
摘要
The Unit 1 of Kuosheng nuclear power plant is in the decommissioning transition phase and still has spent fuel in the core of reactor now. The time to reach the TAF (top of active fuel) for water level and reach 600/800 & DEG;C for cladding temperature are the key parameters in the safety analysis, these affect that the plant has how much time to handle transients. Therefore, to study the water level and cladding temperature for station blackout (SBO) and loss of coolant accident (LOCA) transients in the decommissioning transition phase, the analysis model of Kuosheng nuclear power plant was established by using TRACE code. To evaluate the effect of the decay heat of spent fuel on the water level and cladding temperature, the sensitivity analysis of decay heat was also performed in this study.
引用
收藏
页码:213 / 220
页数:8
相关论文
共 50 条
  • [31] Development of an Integrated Human Error Simulation Model in Nuclear Power Plant Decommissioning Activities
    Nam, Chang-Su
    Lee, Byung-Sik
    SCIENCE AND TECHNOLOGY OF NUCLEAR INSTALLATIONS, 2023, 2023
  • [32] Development of an integrated cost model for nuclear plant decommissioning
    Roy, R
    Amos, G
    ECEC 2003: 10TH EUROPEAN CONCURRENT ENGINEERING CONFERENCE 2003: CONCURRENT ENGINEERING: TEN YEARS ON, 2003, : 13 - 20
  • [33] A comparative study of manipulator teleoperation methods for debris retrieval phase in nuclear power plant decommissioning
    Mizuno, Naoki
    Tazaki, Yuichi
    Hashimoto, Tatsuya
    Yokokohji, Yasuyoshi
    ADVANCED ROBOTICS, 2023, 37 (09) : 541 - 559
  • [34] Public participation in EIA of nuclear power plant decommissioning projects: a case study analysis
    Bond, A
    Palerm, J
    Haigh, P
    ENVIRONMENTAL IMPACT ASSESSMENT REVIEW, 2004, 24 (06) : 617 - 641
  • [35] Safety Assessment Framework for Nuclear Power Plant Decommissioning Workers
    Kim, Hyungjun
    Lee, Donghyun
    Lee, Choong Wie
    Kim, Hee Reyoung
    Lee, Seung Jun
    IEEE ACCESS, 2019, 7 : 76305 - 76316
  • [36] NUCLEAR POWER PLANT DECOMMISSIONING IN GERMANY - PROJECTS, REGULATION AND EXPERIENCE
    Weil, Leopold
    Rehs, Bernd
    PROCEEDINGS OF THE 12TH INTERNATIONAL CONFERENCE ON ENVIRONMENTAL REMEDIATION AND RADIOACTIVE WASTE MANAGEMENT 2009, VOL 2, 2010, : 297 - 301
  • [37] Slovakia sets global example for nuclear power plant decommissioning
    Madsen, Michael Amdi
    IAEA Bulletin, 2023, 64 (01): : 10 - 11
  • [38] PROGRAM CHANGE MANAGEMENT DURING NUCLEAR POWER PLANT DECOMMISSIONING
    Bushart, Sean
    Kim, Karen
    Naughton, Michael
    PROCEEDINGS OF THE 13TH INTERNATIONAL CONFERENCE ON ENVIRONMENTAL REMEDIATION AND RADIOACTIVE WASTE MANAGEMENT, 2010, VOL 1, 2011, : 393 - 398
  • [39] EVALUATION OF RADIONUCLIDES IN CONCRETE SHIELDING FOR NUCLEAR POWER PLANT DECOMMISSIONING
    Chen, Yen-Fu
    Lin, Yen-Kung
    Sheu, Rong-Jiun
    Jiang, Shiang-Huei
    NUCLEAR TECHNOLOGY, 2009, 168 (02) : 508 - 512
  • [40] ECONOMIC CONSEQUENCES OF PREMATURE DECOMMISSIONING OF A NUCLEAR-POWER-PLANT
    BELYAEV, LS
    VOROPAI, NI
    KOVALEV, GF
    KONONOV, YD
    KORNEEV, AG
    LAGEREV, AV
    MARCHENKO, OV
    MEDVEDEVA, EA
    TRUFANOV, VV
    KHANAEVA, VN
    ATOMIC ENERGY, 1994, 77 (04) : 731 - 736